Laserfiche WebLink
ON SITE SEWAGE TREATMENT <br />INSPECTION REPORT OF <br />ORONO <br />On the \orth Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />4737357 <br />OWNER <br />PERMIT NO.'S. -------------------------- DATES <br />ADDRESS /i Ai Aj I Ji)A^ <br />-------------- CONTRACTORS (V'lrir^^ {4ill ('v <br />01 <br />City Ordinance No. 210 requires that each on-site sewage treatment system in Orono he inspected on a regular basis. The on-site sewage <br />treatment system at the above uddress has been inspected and api>ears to fall into the category checked below <br />(This is an existing system □ new construction) <br />Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />Does not meet current City standards in many respects relating to design, construction, or location. Apticars to be operating <br />adequately at this time, but has a relatively high potential lot future problems. No major upgrading of system is required at <br />this time. <br />System may or may not meet current City standards foi design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system rejiair/ <br />replacement procedures If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( Ql Checked items may require your action) <br />Tank ipspection indicates. <br />^BCPumpout not needed at this time. <br />^l] Solids accumulation in tanks indicates they should be pump­ <br />ed out this year to help prevent future problems. <br />O Solids accumularion in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />□ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />□ Inspection risers missing —tanks could not be inspected. <br />Inspection risers (4" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />□ Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Drainfield inspection indicates: <br />J^Drainfield is dry. no surfacing evident. <br />US1 Some evidence of surfacing, not critical yet. <br />□ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace­ <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />□ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />□ Slope <br />□ Soil <br />□ High water table <br />□ Lot size <br />□ Lake, wetland, or stream <br />□ Drainage <br />Potential for Syste.n Failure <br />(depends on soil types, water <br />table, and system condition) <br />«Low <br />□ Medium <br />□ High <br />□ System is causing visible <br />surface discharge. <br />Site Capabilities for <br />Fut^ Expansion <br />Adequate <br />□ Fair <br />n Poor <br />□ Inadequate <br />COMMENTS: <br />Date of Inspection Sq^c SystemSystem Inspector <br />Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report must be kept on the premises with system location and pumping records. <br />WHITE COPY / Inspector's File GOLD COPY / Homeowner