My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4745 Augusta - Final (2)
Orono
>
Property Files
>
Street Address
>
A
>
Augusta Street
>
4745 Augusta Street - 06-117-23-32-0009
>
Septic
>
4745 Augusta - Final (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:43 PM
Creation date
8/11/2022 7:58:44 AM
Metadata
Fields
Template:
x Address Old
House Number
4745
Street Name
Augusta
Street Type
Street
Address
4745 Augusta St
Document Type
Septic
PIN
0611723320009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 26th, 2021 <br /> <br />MNSPECT Inspection <br />235 First Street West <br />Waconia, MN 55387-1302 <br /> <br />From: MNSPEC Inspection Affiliate Company <br /> Dale Denn <br /> HomeStead Septic System Services <br /> 1108 Goldenrod Lane <br /> Shakopee, MN 55379 <br /> <br /> MPCA License # 583 <br /> Certification # 3226 <br /> Inspector-Intermediate Designer-Installer-Maintainer <br /> <br /> Cell Phone: 612-310-7887 <br /> Email: Homesteadseptic@outlook.com <br /> <br />Subject: 4745 Augusta Road, Orono, MN 55364 <br /> Septic Final Inspection <br /> <br />On May 25th, 2021, I visited the site to conduct a final inspection in regards to some post <br />landscaping whereby there was a concern about a landscaping wall and a pool being too close <br />to the Mound Septic, or the wall was thought to be on the Mound. <br /> <br />1. A boulder wall was constructed about 8 feet from the upper edge of the Mound rock <br />bed. Technically the Mound Dike goes about 12 feet from the rock bed, but on the <br />upper side of the Mound, there is no absorption area credit. Having the landscape wall <br />there will not impact the long term performance of the Mound. Thus there is no issue <br />with the wall regarding the Mound nor the Septic or Pump tanks as well. <br />2. The in-ground pool is 21 feet from the upper edge o f the rock bed. This meets the <br />MPCA minimum recommended design setback of 20 feet. <br /> <br />Upon my visit and final septic inspection, this septic system is deemed In Compliance and the <br />LUG may issue a Certificate of Compliance. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Dale J Denn <br />Dale J Denn <br />HomeStead Septic
The URL can be used to link to this page
Your browser does not support the video tag.