My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCWD Rip-Rap Permit 21-656
Orono
>
Property Files
>
Street Address
>
O
>
Orono Lane
>
1395 Orono Lane - 02-117-23-34-0006
>
Permits/Inspections
>
MCWD Rip-Rap Permit 21-656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:09:54 PM
Creation date
5/13/2022 2:17:06 PM
Metadata
Fields
Template:
x Address Old
House Number
1395
Street Name
Orono
Street Type
Lane
Address
1395 Orono La
Document Type
Permits/Inspections
PIN
0211723340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information <br />contained in the permit application, correspondence, plans, maps, and all other supporting data <br />submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY <br />GRANTED to the applicant named below for use and development of land in the Minnehaha <br />Creek Watershed District. <br /> <br /> <br /> <br />Issued to: Gary Kraemer Permit No: 21-656 <br /> <br />Location: 1395 & 1397 Orono Lane, Orono <br /> <br />Purpose: Shoreline and Streambank Stabilization- 285’ Rip-Rap <br /> <br />Date of Issuance: 11/30/2021 Date of Expiration: 11/30/2022 <br /> <br /> By Order of the Board of Managers <br /> <br /> ____________________________ <br /> Will Roach <br /> Permitting Assistant <br />This permit is not transferable without District approval, and is valid to the date of expiration. No <br />activity is authorized beyond the expiration date. If the permittee requires more time to complete <br />the project, an application for renewal of the permit must be received by the District at least 30 <br />days before expiration. <br /> <br />The applicant is responsible for compliance with all District Rules and for the action of their <br />representatives, contractors, and employees. <br /> <br />Conditions: Project to be completed as described in plans submitted to the <br />MCWD office on November 18th, 2021 according to the provisions of this permit. <br />• All equipment intended for use at a project site must be free of prohibited <br />invasive species and aquatic plants prior to being transported into or within <br />the state and placed into state waters <br />• All equipment used in designated infested waters must be adequately <br />decontaminated prior to being transported from the worksite <br />• Properly install and maintain all required erosion control measures until the <br />disturbed areas are re-stabilized <br />• Notify MCWD in writing upon completing installation of perimeter and <br />sedimentation controls <br />• When the site is re-stabilized and the MCWD staff has performed a final <br />inspection, all perimeter control must be removed
The URL can be used to link to this page
Your browser does not support the video tag.