Laserfiche WebLink
__ <br /> REGULATED BACKFLOW ASSEMBLY (RBA) FORM/TEST REPORT <br /> Service Site Address <br /> 795 NORTH OLD CRYSTAL BAY RD, LONG LAKE, MN, 55356 <br /> Service Site Name <br /> ORONO HIGH SCHOOL <br /> Work Order Number <br /> 272596 <br /> Contractor Name: Tester Name: <br /> Gilbert Mechanciai Contractors , Kenneth Thunder <br /> Contractor Address: Tester Certification #: <br /> 5251 W 74th Street, Edina, MN 55439 BF066234/ASSE 31412 <br /> Contractor License #: Test Equipment Manufacturer: <br /> 058808-PM WATTS <br /> Contractor Phone #: Test Equipment Model #: <br /> 952-835-3810 TK-9A <br /> Test Equipment Serial #: <br /> 853818 <br /> Testing Equipment Calibration Date: <br /> 05/10/2021 <br /> Backflow Assembly Detail Information (Check One:) <br /> Eli Reduce Pressure Principal or Pressure Principal Fire Protection <br /> Type of Work (Check One) <br /> E6 Test <br /> Manufacturer: System Serviced: <br /> Conbraco Boiler fill <br /> Model # Location in Bldg <br /> 4020402 Boiler room in the old ok kids building. <br /> Serial # Floor# <br /> K8383 1ST <br /> Size (Inches) Room # <br /> 3/4" Boiler room <br /> REGULATED BACKFLOW ASSEMBLY (RBA) FORM/TEST REPORT cont. <br /> Reduced Pressure Principal or Reduced Pressure Detector Fire Protection (RP)-TEST RESULTS <br /> Check Valve #2 (Closed Tight) Shutoff Valve #2 (Closed Tight) Check Valve #1 <br /> Initial Test <br /> Final Test ®Yes ®Yes 0 Yes (Closed Tight) <br />