Laserfiche WebLink
Bonestroo,Rosene,Anderlik and Associates,Inc.is an Affirmative Action/Equal Opportunity Employer <br /> Bonestroo and Employee Owned <br /> Principals:Otto G.Bonestroo,PE. Marvin L.Sorvala,P.E.• Glenn R.Cook,PE.• Robert G.Schunicht,P.E.• <br /> Rosene Jerry A.Bourdon,PE. <br /> 1111 <br /> Anderlik & Senior Consultants:Robert W.Rosene,P.E.•Joseph C.Anderlik,P.E.• Richard E.Turner,P.E.• Susan M.Eberlin,C.P.A. <br /> Associate Principals:Keith A.Gordon,P.E.• Robert R.Pfefferle,P.E.• Richard W.Foster,PE.•David O.Loskota,P.E.• <br /> Associates Mark A.Hanson,PE.• Michael T.Rautmann,PE.• Ted K.Field,P.E.• Kenneth P.Anderson,PE.• Mark R.Rolfs,P.E.• <br /> David A.Bonestroo,M.B.A.• Sidney P Williamson,PE.,L.S.•Agnes M.Ring,M.B.A.•Allan Rick Schmidt,P.E.• <br /> En ineers &Architects Thomas W.Peterson,P.E.• James R.Maland,PE.• Miles B.Jensen,P.E.• L.Phillip Gravel Ill,P.E.• Daniel J.Edgerton,RE.• <br /> 9Ismael Martinez,PE.• Thomas A.Syfko,P.E.• Sheldon J.Johnson• Dale A.Grove,PE.• Thomas A.Roushar,P.E.• <br /> Robert J.Devery,PE. <br /> October 9, 2001 Offices:St.Paul,St.Cloud,Rochester and Willmar,MN•Milwaukee,WI• Chicago,IL <br /> Website:www.bonestroo.com <br /> Mr. Michael P. Gaffron, <br /> Senior Planning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay,Minnesota 55323 <br /> Re: Orono Senior Housing <br /> File No. 139-01-000 <br /> Plat No. 2641 <br /> Dear Mike, <br /> We have reviewed the site plans for the proposed Orono Woods Apartments. The site is located in the <br /> northwest quadrant of Wayzata Boulevard (T.H. 12) and North Brown Road. The site is proposed to be <br /> developed as a senior housing complex and office building. The plans show the senior housing to be <br /> constructed as Phase 1 and the office complex as Phase 2.It is our understanding that the use for Phase 2 may <br /> change based on demand.This review focuses primarily on Phase 1.The following are comments with regards <br /> to engineering matters: <br /> 1. Traffic: The proposed layout appears to be in accordance with our traffic flow comments dated <br /> November 14,2000.We recommend that the access onto Wayzata Boulevard be signed and striped as a <br /> right-in right-out only intersection. MnDOT should comment on the construction or striping of a <br /> westbound right turn lane into the site from T.H. 12.Cross walk striping and traffic control signing will <br /> be necessary at various locations within the site. Signing and striping plans should be included with the <br /> plan set.Streets and parking areas should be constructed to the City's commercial/industrial street section <br /> as per City Standard Detail STR-7. All streets and parking areas shall have B618 concrete curb and <br /> gutter. <br /> 2. Grading:The grading plan shows street grades at both accesses ranging between 5%and 6%.This will <br /> create problems for stopping and turning movements, particularly in the winter. We recommend a <br /> minimum landing area of 50 feet with a maximum grade of 2%at both accesses.Some parking lot grades <br /> are shown at 5%. We would recommend that parking lot grades not exceed 4 percent.The grades on the <br /> access road to the office complex exceed 8%. Grades to the parking area for the office complex are <br /> shown at 10%.We recommend these grades be reduced as much as practical for the stopping and turning <br /> reasons noted above.The proposed retaining wall northwest of the pond is 8-feet tall at its highest point, <br /> all retaining walls over 4-feet in height require an engineered design and details.All silt fence must be in <br /> place prior to any grading activity. <br /> 3. Drainage: A drainage area map and storm sewer calculations should be provided for our review. Plans <br /> should be submitted to the Minnehaha Creek Watershed District for their review.MnDOT should review <br /> and comment on the plans and provide verification that the existing pond is sized for the proposed <br /> developed conditions.Inverts of flared end sections(FES)outletting to the pond should be set at the pond <br /> normal water level(NWL) of 972.0+/-. Class III riprap should be called out and quantified at all FES. <br /> Minimum storm sewer size shall be 12-inches.All storm sewer in the roadway or parking areas shall be <br /> RCP. <br /> 2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 • Fax: 651-636-1311 <br />