Laserfiche WebLink
Application Date: 10/30/00 <br /> Deadline: 4/30/01 <br /> REQUEST FOR COUNCIL ACTION <br /> DATE: March 9, 2001 <br /> 17 <br /> ITEM NO.: <br /> Department Approval: Administrator Reviewed: Agenda Section: <br /> Name Paul Weinberger Zoning <br /> Title Zoning Administrator <br /> Item Description: Orono Ambar, LLC. <br /> 2060 Wayzata Boulevard <br /> #2640 Preliminary Subdivision/CUP-Rezoning/Comprehensive Plan Amendment <br /> #2641 Site Plan Reviews <br /> List of Exhibits: eQ4r. <br /> A Site Plan 040 <br /> B Resolution <br /> Summary: <br /> Staff has prepared a resolution approving the General Concept Plan. The primary change in the plans was <br /> to separate the outgoing traffic from the incoming traffic and parking lot area in front of the senior building. <br /> The City's traffic consultant has reviewed the plans and concluded the proposed plan has made a good faith <br /> effort to address earlier concerns. The following final recommendations shall be addressed in the <br /> preliminary plat drawing: <br /> • Restriping for a right turn lane and acceleration lane should be provided to allow ingress/egress <br /> traffic from Highway 12 to be separated from other Highway 12 traffic. <br /> • Individual street width for the service drives shall be constructed to a 14' width for each lane of <br /> traffic. <br /> • The underground parking access to the office building shall be changed to a 90 degree access, as <br /> shown on the site plan attached. The purpose of the change is to improve site lines. <br /> • Final traffic sign plan shall include"one way-do not enter"signs at the west end of the parking area <br /> in front of the senior building,and"one way-do not enter"signs at the east end of the one way drive <br /> exiting towards Brown Road North. Stops signs shall be placed at intersections within the service <br /> drive area. <br /> • Snow storage areas/plans shall be provided. <br /> Primary access would be via a private road entering Brown Road north of the stormwater pond. This would <br /> be the primary access to and from the property. A signalized intersection is planned for the Highway 12 and <br /> Brown Road North intersection. Secondary access to the property would be via a right-in/right-out access <br /> directly to Highway 12 at the boundary between the two proposed lots. <br /> The service drive has been designed to allow for a future connection to the west beyond the office building <br /> parking lot. Two future connection options are available,one to Brimhall Avenue and the other to Willow <br /> Drive North. <br />