My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-02-2019 Septic Design
Orono
>
Property Files
>
Street Address
>
W
>
West Farm Road
>
1860 West Farm Rd - 27-118-23-43-0018
>
Septic
>
05-02-2019 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:22:38 PM
Creation date
10/1/2021 4:18:44 PM
Metadata
Fields
Template:
x Address Old
House Number
1860
Street Name
West Farm
Street Type
Road
Address
1860 West Farm Road
Document Type
Septic
PIN
2711823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Olson D.B.A. <br />Rusty O1son's--Soil and Percolation Testing <br />Joseph J. Olson--MPCA License # 810 <br />11481 Riverview R€1. NE, Hanover, MN 55341 <br />(763) 498-8779 Fax (763) 498-8290 <br />Revised May 2, 2019 <br />November 12, 2018 <br />Mark Beltrand <br />1860 West Farm Road <br />Orono, Hennepin County <br />This on-site Sewage Treatment System is designed to change a Type 1, three-bedroom house system into a <br />Type 1, four-bedroom house system in accordance with the Minnesota Pollution Control Agency Chapter <br />7080 and local ordinances. <br />The periodically saturated soils were located at 12-16 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. Th is system <br />is designed with 6 inches of rock <br />All neighboring wells are greater than 50' from proposed treatment areas. <br />The soils at a depth of 12" have a percolation rate averaging 14 MPI. <br />The existing tanks may be moved and used upon approval of the local inspector. <br />All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks. Clean <br />outs must be installed on the end of the laterals for maintenance. <br />Use '/4 -inch perforations on the laterals. <br />A I000 -gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br />power supply and switches must be located outside the manhole and pumping chamber in a weatherproof <br />enclosure. A warning device must be installed with light and sound devices; this is in case of a pump <br />failure. A flow measurement device must be installed. Including but not limited to a water meter, event <br />counter, running time clocks or electronically controlled dosing. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Iron filters cannot go into the septic system. Garbage disposals are not <br />recommended. Additives must not be used they may cause harmful damage to your septic system. It is <br />recommended that you pump the septic tanks every two years. <br />Sincerely, <br />Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.