My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-06-2017 Septic Design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
420 Lakeview Parkway - 06-117-23-32-0016
>
Septic
>
12-06-2017 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:51 PM
Creation date
9/29/2021 1:56:49 PM
Metadata
Fields
Template:
x Address Old
House Number
420
Street Name
Lakeview
Street Type
Parkway
Address
420 Lakeview Pkwy
Document Type
Septic
PIN
0611723320016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Olson D.B.A. <br />Rusty Olson's--Soil and Percolation 'Vesting <br />Joseph J. Olson--MPCA License #810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />(763) 498-8779 Fax (763) 498-8290 <br />Revised December 6, 2017 <br />Gonyea Homes <br />420 Lakeview Parkway <br />Orono, Hennepin County <br />This on-site Sewage Treatment System is designed for a Type 1, five -bedroom home in accordance with <br />the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br />The periodically saturated soils were located at 18-32 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system <br />is designed with 6 inches of rock. <br />A diversion uphill and the road side of the system must be made to divert all the runoff comin2 at the <br />System. <br />The soils at a depth of 12" have a percolation rate averaging 5 MPI. <br />A 2250 -gallon septic tank is designed for this site. All tanks need to be insulated if there is less than two <br />feet of cover over the top of the tanks. Clean outs must be installed on the end of the laterals for <br />maintenance. <br />Use 7132 inch perforations on the laterals. <br />A Darwin 1300 gallon pumping chamber will need to be installed to lift the effluent to the treatment area. <br />The power supply and switches must be located outside the manhole and pumping chamber in a <br />weatherproof enclosure. A warning device must be installed with light and sound devices, this is in case of <br />a pump failure. A flow measurement device must be installed. Including but not limited to a water meter, <br />event counter, running time clocks or electronically controlled dosing. <br />Keep all heavy a ui ment off of the Droposed treatment areas before during and after construction_. <br />The area around both sites must be fenced off by the contractor before any construction beams. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Garbage disposals are not recommended. Iron filters cannot go into this <br />system. Additives must not be used they may cause harmful damage to your septic systern. It is <br />recommended that you pump the septic tanks every two years. <br />Sincerely, <br />Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.