My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-2018 Septic Design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Court
>
4350 Lakeview Court - 06-117-23-43-0019
>
Septic
>
06-20-2018 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:09 PM
Creation date
9/29/2021 8:39:50 AM
Metadata
Fields
Template:
x Address Old
House Number
4350
Street Name
Lakeview
Street Type
Court
Address
4350 Lakeview Ct
Document Type
Septic
PIN
0611723430019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 X 63 Rock Bed <br />2250 Septic Tank <br />1250 Pump Tank <br />City of Orono Septic Plan Review <br />Reviewer: <br />All work shall be done in full compliance <br />with all appllc&e septic and zoning code. <br />36 GPM Mln. Pump Joseph Olson D.B.A. <br />36* TDH Rusty Olson's--Soil and Percolation Testing <br />Joseph J. Olson--MPCA License 9810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />(763) 498-8779 Fax (763) 498-8290 <br />June 20, 2018 <br />Norton Homes <br />4350 Lakeview Court <br />Orono, Hennepin County <br />This on-site Sewage Treatment System is designed for a Type 1, Five -bedroom home in accordance with <br />the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br />The periodically saturated soils were located at 14-28 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system <br />is designed with 6 inches of rock. <br />The soils at a depth of 12" have a percolation rate averaging 7 MPI. <br />A 2250 -gallon septic tank or its equivalent is designed for this site. All tanks need to be insulated if there is <br />less than two feet of cover over the top of the tanks. Clean outs must be installed on the end of the laterals <br />for maintenance. <br />Use 7/32 -inch perforations on the laterals. <br />A 1250 -gallon pumping chamber or larger will need to be installed to lift the effluent to the treatment area. <br />The power supply and switches must be located outside the manhole and pumping chamber in a <br />weatherproof enclosure. A warning device must be installed with light and sound devices; this is in case of <br />a pump failure. A flow measurement device must be installed. Including but not limited to a water meter, <br />event counter, running time clocks or electronically controlled dosing. <br />Keep all heavy ectuipment off of the proposed treatment areas before during and after construction <br />The area around both sites must be fenced off by the contractor before any construction be ins. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Iron filters cannot go into the septic system. Garbage disposals are not <br />recommended. Additives must not be used they may cause harmful damage to your septic system. It is <br />recommended that you pump the septic tanks every two years. <br />Since3P , <br />Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.