Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
i_'T:�`_5/� /7 <br /> .�a y, '_ �•.f w.-_'.�c/_ <br /> . - :� <br /> � O� <br /> O �� O <br /> �-���T�=�� CITY of ORONO <br /> ��,,, i"`���`,�•'�=� F�r Municipal Offices <br /> � ���`}� ��� G,�, <br /> ,t9�1�'������g,� SVeet Address: Mailing Address: <br /> $�HQ 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 28, 1997 <br /> Dear Project Area Residents; <br /> Installation of the sanitary sewer lines and lift stations is complete for the Bracketts Point/Bay Ridge <br /> sanitary sewer project. The system will be operational and available for residential connections as <br /> of Monday,November 3rd. All connections to the system must be completed by a state licensed <br /> plumber. A City permit for connection must be obtained by the licensed plumber who is going to <br /> complete the work. Payment of the Metropolitan Council Envuonmental Services SAC (Sewer <br /> Availability Charge) must be made when the sewer connection pernut is issued. This charge is for <br /> the metropolitan sewer system downstream capacity that has been reserved for new sanitary sewer <br /> connections. <br /> According to Orono City Code, all connections to the sewer system must be made within 16 <br /> months of the official date that the system is operational for residential connections. Based on the <br /> availability date of November 3rd 1997, the deadline for connection to the system is March 3rd <br /> 1999. Effectively, this means that all connections will need to be completed before the end of the <br /> 1998 construction season. <br /> Restoration of the proj ect area is scheduled for this fall with the final surface course of asphalt <br /> pavement scheduled for completion in 1998. Thank you for your assistance in this matter and <br /> patience and understanding during construction of this project. Please contact myself or Tom <br /> Kellog w�th Boonestro Engineers, Phone 604-4863, should you have any questions or concerns <br /> about the project. <br /> Sincerely <br /> • � ,�C�/ <br /> � U� <br /> Gregory A. Gappa <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />