My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic/sewer info
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1473 Bay Ridge Road - 10-117-23-34-0005
>
Septic
>
Septic/sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:44 PM
Creation date
8/10/2015 2:05:06 PM
Metadata
Fields
Template:
x Address Old
House Number
1473
Street Name
Bay Ridge
Street Type
Road
Address
1473 Bay Ridge Road
Document Type
Septic
PIN
1011723340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i����� �,��.���> G��% <br /> � �� <br /> �_�,`� . 0 <br /> �-����-�=� CITY of ORONO <br /> ����� <br /> � ��, �� <br /> �„ � ,,�`',•�q�p �!4 Municipal O�ces <br /> '� ��'�"i-'�� . �kr G <br /> ti�,,r�. a. <br /> ,�9 �.ti�\�`���g.� Street Address: Mailing Address: <br /> x'E�gO 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 28, 1997 <br /> Dear Project Area Residents; <br /> Installation of the sanitary sewer lines and lift stations is complete for the Bracketts Point/Bay Ridge <br /> sanitary sewer project. The system will be operational and available for residential connections as <br /> of Monday, November 3rd. All connections to the system must be completed by a state licensed <br /> plumber. A City permit for connection must be obtained by the licensed plumber who is goino to <br /> complete the work. Payment of the Metropolitan Council Environmental Services SAC (Sewer <br /> Availability Charge) must be made when the sewer connection permit is issued. This charge is for <br /> the metropolitan sewer system downstream capacity that has been reserved for new sanitary sewer <br /> connections. <br /> According to Orono City Code, all connections to the sewer system must be made within 16 <br /> months of the official date that the system is operational for residential connections. Based on the <br /> availability date of November 3rd 1997, the deadline for connection to the system is March 3rd <br /> 1999. F�ffectively, this means that all connections will need to be completed before the end of the <br /> 1998 construction season. <br /> Resturation of the project area is scheduled for this fall with the final surface course of asphalt <br /> pavement scheduled for completion in 1998. Thank you for your assistance in this matter and <br /> patience and understanding during construction of this project. Please contact myself or Tom <br /> Kellog w7th Boonestro Engineers, Phone 604-4863, should you have any questions or concems <br /> about the project. <br /> Sincerely <br /> • � ,�C <br /> � �� <br /> Gregory A. Gappa <br /> Telephone (612) 473-'7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.