My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-07-2021 Compliance Inspection
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
0345 Spring Hill Road - 25-118-23-43-0008
>
Septic
>
06-07-2021 Compliance Inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:21 PM
Creation date
6/11/2021 7:25:24 AM
Metadata
Fields
Template:
x Address Old
House Number
345
Street Name
Spring Hill
Street Type
Road
Address
345 Spring Hill Road
Document Type
Septic
PIN
2511823430008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SP TESTING INC. <br />Steven B. Schirmers —951 Katydid Lane NE—St. Michael, MN 55376 <br />Cert. No 627 — State License #394 — Phone 763-497-3566 — Fax 763-497-5Q11 <br />www.sptesting.wastewater@comcast.net — schirmerswastewater.com <br />June 10, 2021 <br />Roger Riley <br />345 Spring Hill Rd. <br />Orono, MN <br />A compliance inspection was completed for the existing on-site sewage <br />treatment system located on this property. The system consists of an Other <br />System under Minnesota Chapter 7080.0178 built on 11-1-07 for a 5 bedroom <br />home. There is a 2000 gallon trash trap, dosing tank (750 trash -1250 pump <br />#1) with a timer dosing 15.6 gal/every 30 minutes to a 750 gallon Multi -Flo <br />pre-treatment unit, then flowing gravity to a 1500 gallon pumping chamber <br />(pump #2) which pumps to a raised seepage bed. The fill, compacted & clay <br />soil was removed & backfilled with washed sand. The elevation in the <br />original design at the bottom of the rock was 88.5. The bottom of the rock <br />was found at elev. 88.6. <br />2 inspection pipes were installed, one at the bottom of the rock & 1 at the <br />bottom of the sand fill. The elev. At the top of the inspection at the south <br />pipe was at 90.9 & the bottom of the rock 88.6 (2.3'). The elev. At the top of <br />the inspection pipe at the north pipe was at 91.0 & the bottom of the sand fill <br />elev. 84.1 (6.91) with the bottom of the rock to the bottom of the sand 4.51. <br />The seepage bed has been monitored annually by Schirmers Wastewater <br />Treatment Systems since the system has been installed which has found <br />both inspection pipes to be dry at the time of monitoring. The Multi -Flo has <br />been serviced 2 times annually since it was installed by Schirmers <br />Wastewater Treatment Systems. An annual contract is required for both (see <br />monitoring & service contracts). The Multi -Flo is time dosed with a <br />maximum of 15.6 gal/every 30 minutes, so hydraulic overloading cannot take <br />place in the seepage bed. if over water use or toilet running, etc. there is an <br />alarm to let you know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.