Laserfiche WebLink
City Of Orono <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br /> <br />Property Address: <br />PID: <br /> <br />Owner Information <br />Name: <br />Mailing Address: <br />(if different from <br />Property) <br /> <br /> <br />Phone: Email: <br /> <br />Inspector Information <br />Name: <br />Company/ Organization License number: <br />Phone: Email: <br /> <br />Inspection <br />System Standard Pass Fail <br />Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br /> <br />Foundation <br />Drains <br />Foundation drains are underground pipes that collect storm water from <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building . Foundation drains should no t be connected <br />to the sanitary sewer. <br /> <br />Sump Pumps Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br /> <br />Sewer Service <br />Line <br />Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. (Details on back of this sheet) <br /> <br />Notes: <br /> <br /> <br /> <br /> <br />Toilet Removed <br />For Inspection: <br />○ Yes ○ No <br /> <br /> <br />Inspectors Signature: Date: <br />Owners Signature: Date: <br /> <br />City Review <br /> Compliant  Corrective Action Required <br />Certificate of Compliance Expires: Corrective Action Due by: <br />Date: Signature: <br />Name: <br /> <br />Date Called in <br />Date Scheduled <br />2703 Walters Port Lane <br />2111723230042 <br />Elizabeth Reese-Marton <br />612-867-8244 cthrelkeld@cbburnet.com <br />Kyle Krasky <br />K drains <br />651-888-2059 kdrains.office@gmail.com <br />x <br />x <br />x <br />Video on line was done in April 2021. Scott O. with Orono Public Worksreviewed video and found all is good and compliant. <br />Scott O 06/02/21 <br />x <br />04/01/2031 <br />06/02/2021 Anne Hentges <br />353 Park St