Laserfiche WebLink
� <br /> l � �j� �`�v►�Uaz ��� <br /> September 2, 1986 <br /> Dear Crystal Bay Resident: <br /> The sanitary sewer project in the Crystal Bay area was <br /> completed, inspected and accepted on June 11, 1986. There are <br /> some ,restoration items yet to be completed. <br /> If you have not already done so, you can connnect your <br /> residence or business to the sanitary sewer main line. <br /> The deadline fos connection to the sewer main line is 16 � <br /> months from June 11, 1986 or October 11, 1987. <br /> A licensed contractor is requirea to make this type of <br /> connection in the City of Orono. <br /> The contractor must obtain a permit from the City prior to _ � <br /> any work being done. <br /> The permit fee is $30.50. A Service Availabil3ty Charge <br /> � (SAC) of $475.00 must be paid before or at the time the permit �.s , <br /> issued. Be advised that the City of Orono is only the collection ; <br /> agency for the SAC fee. The Metropolitan Waste Control � <br /> Commission actually receives these monies. � � <br /> ; <br /> t <br /> Some of you may have already paid the SAC fee in advmnce. • <br /> For your information, your existing septic tank must be <br /> pumped an� filled with approved fill when connection to the sewer - � <br /> main has been comple�ed. <br /> If you have any questions, please feel free to call me at <br /> 473-7359. � <br /> Sincerely, ; <br /> ���� <br /> � <br /> John R. Gerhardson, <br /> Public Works Coordinator • <br /> JRG/tln <br />