Laserfiche WebLink
- _- � :� <br /> l ��� ��,�- �'' ` <br /> _ � �� ��� <br /> � <br /> September 2, 1986 �.� � <br /> � � � � <br /> � � <br /> Dear Crystal Bay Resident: <br /> The sanitary sewer project in the Crystal Bay area was I <br /> completed, inspected and accepted on June 11, 1986. There are <br /> some �restoration items yet to be completed. '�� <br /> If you have not already done so, you can connnect your I� <br /> residence or business to the sanitary sewer main line. <br /> The deadline for connection to the sewer main line is 16 <br /> months from June 11, 1986 or October 11, 1987. <br /> A licensed contractor is required to make �his type of <br /> connection in the City of Orono. <br /> The contractor muat obtain a permit from the City prior to <br /> any work being done. <br /> The permit fee is $30.50. A Service Availabf lity Charge <br /> � (SAC) of $475.00 must be paid before or at the time the permit is <br /> issuecl. Be advised that the City o£ Orono is only the collection ; <br /> agency for the SAC fee. The Metropolitan Waste Control i <br /> Commission actually receives these monies. �, � <br /> ; <br /> Some of you may have already paid the SAC fee in advance. ', � <br /> i . <br /> For your information, your existing septic tank must be �I <br /> pumped and filled with approned fili when connection to the sewer I � <br /> main has been comp].e�ed. <br /> If you have any questions, please feel free to call me a�t <br /> 473-7359. � <br /> Sincerely, , <br /> L�� � <br /> � <br /> John R. Gerhardson, <br /> Public Works Coordinator • <br /> JRG/tln � <br /> I� I <br />