Laserfiche WebLink
i � <br /> 1 z.z � �-� /� <br /> Se tember 2 1986 I' <br /> p ' I <br /> Dear Crystal Bay Resident: <br /> The sanitary sewer project in the Crystal Bay area was , <br /> completed, inspected and accepted on June 11, 1986. There are <br /> some �restoration items yet to be completed. <br /> If you have not already done so, you can connnect your <br /> residence or business to the sanitary sewer main line. <br /> The deadline for connection to the sewer main line is 16 ' <br /> months from June 11, 1986 or October 11, 1987. <br /> A licensed contractor is required to make this type of ' <br /> connection in the City of Orono. <br /> The contractor mus� obtain a permit from the City prior to ,i <br /> any work being done. � <br /> The permit fee is $30.50. A Service Availability Charge ' <br /> � (SAC) of $475.00 must be paid before or at the time the permit is <br /> isssued. Be advised that the City of Orono is only the collection � ; <br /> agency for the SAC fee. The Metropolitan Waste Control �� i <br /> Coa�mission actually receives these monies. , <br /> � � <br /> - Some of you may have already paid the SAC fee in advance. �, • <br /> For your information, your existing septic tank must be ,�I <br /> pumped and filled with approved fill when connection to the sewer ; � <br /> main has been completed. , <br /> If you have any ques�tions, please feel free to call me at ', <br /> 473-7359. ` ' <br /> Sincerely, � , <br /> -L�/� �, <br /> 9 <br /> John R. Gerhardson, <br /> Public Works Coordinator • <br /> JRG/tln <br /> I <br /> � , <br /> i <br />