My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999- soil test to determine on-site septic system
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Tr E
>
2780 Deer Run Trail East - 04-117-23-13-0008
>
Septic
>
1999- soil test to determine on-site septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:07:53 PM
Creation date
5/6/2020 9:49:26 AM
Metadata
Fields
Template:
x Address Old
House Number
2780
Street Name
Deer Run
Street Type
Trail
Street Direction
East
Address
2780 Deer Run Tr E
Document Type
Septic
PIN
0411723130008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL BORINGS,PERCOLATION TESTS,AND PRELIMINARY DESIGN <br /> TO DETERMINE'SITE SUITABILITY FOR AN <br /> ON-SITE SEPTIC SYSTEM <br /> FOR <br /> George Stickney <br /> 200 West Lake Street <br /> Wayzata,MN, 55391 <br /> 476-3694 <br /> SITE <br /> Lot 1, Block 1 <br /> Crystal Bay Preserve <br /> Orono,MN <br /> BY: <br /> DH Excavating <br /> MPCA License#644 <br /> 210 2°d Street NE <br /> NYA,MN,55397 <br /> This lot has a primary and secondary site that will treat the wastewater generated in <br /> a single-family dwelling. These were the only areas tested for suitability,other <br /> standard sites are not available.This report was written on March 18, 1999, revised <br /> on March 31, 1999, and finalized on August 29, 1999. The system will need to be <br /> redesigned and installed per MN Statute 7080. A mound type system will need to <br /> be installed because of the high seasonal water table. <br /> Drainage and final landscaping <br /> All surface water must flow away from the tank and drain field area. A drainage plan <br /> should be completed to insure that surface run off from the hill,buildings, and driveway <br /> drain away from the system before construction begins. <br /> GENERAL <br /> The tank location may be adjusted depending where the home is finally located. A <br /> final design will need to be completed before actual construction begins. This is a <br /> preliminary design,the actual system will need to be designed for the home that will <br /> be built on this lot. The final design will use the existing drain field sites, but must <br /> adjust to the number of bedrooms,water use appliances,and other circumstances <br /> that will be particular to the constructed home. <br />
The URL can be used to link to this page
Your browser does not support the video tag.