STORM WATER POLLUTION PREVENTION PLAN NOTES: <br />1. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL <br />UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION. <br />2. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND <br />SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, SEDIMENTATION BASINS <br />OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE <br />IN THE FOLLOWING ORDER: <br />A. ROCK CONSTRUCTION ENTRANCES A MINIMUM OF 50 FEET. <br />B. SILT FENCE. <br />C. TEMPORARY CULVERTS. <br />D. TEMPORARY SEDIMENTATION BASINS AND OUTFALL FACILITIES. <br />E. STORM WATER POND CONSTRUCTION, <br />F. COMMON EXCAVATION AND EMBANKMENT (GRADING ) <br />G. SEED AND MULCH OR SOD. <br />H.BIO-ROLL BARRIERS IN FINISHED GRADED AREAS. <br />I. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER WORK. <br />3. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES IN ACCORDANCE <br />WITH CITY AND NPDES PHASE II PERMITTING REQUIREMENTS AS WELL AS EROSION CONTROL MEASURES AS <br />MAY BE SHOWN ON THESE PLANS OR SPECIFICATIONS. GRADING CONTRACTOR SHALL IMPLEMENT ANY <br />ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED TO PROTECT ADJACENT PROPERTY. <br />4. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE <br />CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH <br />ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS <br />SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE <br />ENGINEER. THE GRADING CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY <br />DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. <br />5. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT <br />CERTIFICATION OF ALL CONTROLLED FILLS WILL BE FURNISHED TO THE OWNER <br />DURING AND UPON COMPLETION OF THE PROJECT. <br />6. ALL DISTURBED AREAS, EXCEPT AREAS TO BE PAVED AND/OR SPECIFICALLY DESIGNED BY A LANDSCAPE <br />PLAN, SHALL BE COVERED WITH A MINIMUM 4" OF TOP SOL. ALL DISTURBED AREAS SHALL BE SEEDED <br />& MULCHED AT THE PRESCRIBED RATES WITHIN 72 HOURS OF FINAL GRADING UNLESS OTHERWISE NOTED. <br />SEED MIX: MNDOT NO. 50B 50#/ACRE <br />MULCH TYPE 1 2 TONS/ACRE (DISK ANCHORED) <br />FERTILIZER: 150#/ACRE RATE OF APPLICATION 20-10-10 <br />ALL EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE WITHIN 200 LINEAL FEET OF ANY <br />SURFACE WATER, MUST HAVE TEMPORARY EROSION PROTECTION OR PERMANENT COVER FOR THE EXPOSED <br />SOIL AREAS YEAR ROUND, ACCORDING TO THE FOLLOWING TABLE OF SLOPES AND TIME FRAMES. <br />TYPE OF SLOPE TIME (Maximum time an area can remain open when the area is not <br />actively being worked) <br />STEEPER THAN 3:1 7 DAYS <br />10:1 TO 3:1 14 DAYS <br />FLATTER THAN 10:1 21 DAYS <br />7. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS SHOWN ON THE PLAN WERE TAKEN FROM A PLAN <br />FURNISHED BY OWNER. <br />8. CONTRACTORS GRADING AND EROSION CONTROL OPERATIONS SHALL TAKE PLACE WITHIN THE CONSTRUCTION LIMITS. <br />9. IT IS REQUIRED THAT SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES BE CLEANED DAILY FROM PAVED <br />ROADWAY SURFACES THROUGHOUT THE DURATION OF CONSTRUCTION. <br />10. PROVIDE TEMPORARY SEDIMENTATION BASINS AS DIRECTED BY THE ENGINEER. <br />11. ALL REQUIREMENTS OF THE LOCAL WATERSHED DISTRICT SHALL BE SATISFIED PER THE APPROVED PERMIT. <br />12. ALL EROSION & SEDIMENT CONTROL MEASURES SHOWN ON THIS PLAN AND <br />IMPLEMENTED IN THE FIELD AS DIRECTED BY THE ENGINEER SHALL CONFORM TO THE MPCA'S <br />"PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES FOR MINNESOTA". <br />13. DEWATERING AND/OR BASIN DRAINING DISCHARGE SHALL BE DIRECTED TO SEDIMENTATION BASINS <br />WHEREVER POSSIBLE. ALL DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FORM EROSION & <br />SCOUR THROUGH USE OF APPROVED ENERGY DISSIPATION DEVICES. <br />14. ALL SOLID WASTE/ CONSTRUCTION DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH MPCA <br />REQUIREMENTS. HAZARDOUS MATERIALS SHALL BE STORED/ DISPOSED OF IN COMPLIANCE WITH <br />MPCA REGULATIONS <br />15. CONTRACTOR SHALL USE RAPID STABILIZATON METHODS PER MnDOT 2573 AS NEEDED DURING THE COURSE OF <br />THE WORK TO MAINTAIN CONFORMANCE WITH THE CITY AND NPDES 11 PERMIT REQUIREMENTS. <br />THIS WORK SHALL CONSIST OF OPERATIONS NECESSARY TO RAPIDLY STABILIZE SMALL CRITICAL AREAS, TO <br />PREVENT OFF SITE SEDIMENTATION AND/OR TO COMPLY WITH PERMIT REQUIREMENTS. THE WORK MAY BE <br />PREFORMED AT ANY TIME DURING THE CONTRACT AND DURING NORMAL WORKING HOURS. THIS WORK WILL BE <br />CONDUCTED ON SMALL AREAS THAT MAY OR MAY NOT BE ACCESSIBLE WITH NORMAL EQUIPMENT. THIS WORK <br />SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE MnDOT STANDARD SPECIFICATIONS, THE DETAILS SHOWN <br />IN THE PLANS, AND THE FOLLOWING: <br />THERE ARE FIVE STABILIZATION METHODS APPROVED FOR THESE OPERATIONS. THESE METHODS MAY BE <br />CONDUCTED INDEPENDENTLY OR IN COMBINATION. <br />METHOD #1: APPLY TYPE 1 MULCH AND DISC ANCHOR <br />METHOD #2: APPLY TYPE 1 MULCH AND TACK WITH TYPE 5 HYDRAULIC SOIL STABILIZER <br />METHOD #3: HYDROSPREAD SEED,FERTILIZER AND TYPE 6 HYDRAULIC SOIL STABILIZER <br />METHOD #4: HAND INSTALL SEED, FERTILIZER AND EROSION CONTROL BLANKET CATEGORY 3 <br />METHOD #5: PLACE GEOTEXTILE AND RIP RAP CLASS II IN VARIOUS CONFIGURATIONS <br />THESE EFFORTS WILL BE INCIDENTAL TO THE EROSION CONTROL BID ITEM. <br />16. CHANGE OF COVERAGE: FOR STORM WATER DISCHARGES FROM CONSTRUCTION PROJECTS WHERE THE OWNER OR <br />OPERATOR CHANGES, (E.G.,AN ORIGINAL DEVELOPER SELLS PORTIONS OF THE PROPERTY TO VARIOUS BUILDERS) <br />THE NEW OWNER OR OPERATOR MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS OF ASSUMING <br />OPERATIONAL CONTROL OF THE SITE, COMMENCING WORK ON THEIR PORTION OF THE SITE , OR OF THE LEGAL <br />TRANSFER, SALE OR CLOSING ON THE PROPERTY. <br />17. INDIVIDUAL SITE BUILDERS SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL NECESSARY EROSION <br />CONTROL MEASURES AS MAY BE REQUIRED. REQUIRED ECM'S SHALL CONSIST OF BUT NOT BE LIMITED <br />TO THE FOLLOWING: <br />A. STAKED FIBER LOG ROLLS AT BACK OF ALL CURB EXCEPT AT CONSTRUCTION/DRIVEWAY ENTRANCE. <br />B. SILT FENCE ON ALL DOWN GRADIENT SLOPES FROM CONSTRUCTION AREA. SILT FENCE SHALL HAVE <br />THE BOTTOM DUG IN WITH SOIL FIRMLY COMPACTED. <br />C. ROCK CONSTRUCTION ENTRANCE HAVING 1" TO 2" CLEAR ROCK OVER GEOTEXTILE FABRIC. <br />D. STREET CLEANING AS MAY BE REQUIRED SHOULD VEHICLE TRACKING OCCUR. <br />INDIVIDUAL SITE BUILDERS ARE REQUIRED TO MAINTAIN ECM'S UNTIL SUCH TIME AS INDIVIDUAL <br />YARDS/VEGETATION ARE ESTABLISHED. <br />18. CONTRACTOR SHALL PROVIDE A TEMPORARY SEDIMENTATION BASIN ON SITE FOR CONSTRUCTION WASH OUT USE. <br />TEMPORARY BASIN SHALL BE LOCATED AS TO PROVIDE EASY ACCESS FOR CONSTRUCTION VEHICLES AND <br />CONCRETE TRUCKS AS NECESSARY. <br />19. INLET SEDIMENTATION CONTROL IS TO BE PROVIDED TO ALL STORM SEWER CATCH BASINS THROUGHOUT <br />CONSTRUCTION. MEASURES APPLIED SHALL COMPLY WITH BEST MANAGEMENT PRACTICES FOR MINNESOTA AND <br />APPLICATIONS OF NPDES PHASE 11 AS APPROPRIATE FOR PHASE OF CONSTRUCTION, <br />EROSION -F CONSTRUCTION SEQUENCING <br />1. CONSTRUCTION WILL CONSIST OF RAIN GARDEN <br />EXCAVATION CONSTRUCTION, GRAVEL STRIPPING, <br />GRAVEL INSTALLATION, PAVING INSTALLATION, <br />FENCING AND BERM CONSTRUCTION. <br />2. RESPONSIBLE PARTY FOR EROSION INSPECTION AND <br />MAINTENANCE IS: NATE WENDT, ROCHON CORP. <br />(763) 559-9393. <br />3. PHASING PER SHEET 1 PHASE NOTES. <br />4. PROJECT SCHEDULE: 3-6 WEEKS OVER ALL LENGTH. <br />WEATHER DEPENDENT. <br />5. INSTALLATION OF EROSION: AT START OF PROJECT. <br />WIRE MESH REINFORCEMENT <br />(OPTIONAL) 7 <br />METAL OR WOOD <br />POST OR STAKE <br />ENGINEERING FABRIC <br />FABRIC ANCHORAGE <br />TRENCH BACKFILL WITH <br />TAMPED NATURAL SOIL <br />DIRECTO FOF <br />OW <br />t <br />RUNOFF FINCH MINIM <br />`. <br />—NATURAL. FIN: <br />st .; <br />6 INCH MINIMUM <br />NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH <br />HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES. <br />TYPICAL INSTALLATION FOR SILT FENCE <br />(SECTION 6.3, MPCA'S "BEST MANAGEMENT PRACTICES") <br />1" X 2" X 18" LONG WOODEN STAKES AT <br />1' 0" SPACING MAXIMUM. STAKES SHALL BE <br />DRIVEN THROUGH THE BACK HALF OF THE <br />BIOROLL AT AN ANGLE OF 45 DEGREES WITH <br />THE TOP OF THE STAKE POINTING UPSTREAN <br />PROVIDE 8" TO 10" OF EMBEDMENT DEPTH. <br />FLOW <br />TEMPORARY <br />SILT FENCE <br />TEMPORARY SEED & — <br />MULCH ALL DISTURBED <br />AREAS PER SWPPP <br />NOTE 6. <br />RELOCATE FENCE TO <br />EAST SIDE OF RAIN <br />GARDEN. <br />LOCATE TEMPORARY <br />SILT FENCE ON <br />PROPERTY LINE. <br />MAY USE 810 -ROLLS <br />AS ALTERNATE. <br />RAIN GARDEN DEPRESSION <br />STORMWATER CONTROL <br />or-\`—`—` ------- -------------------- ----- O----------------------------------------------------------------—_—_—_— '-------------------------- --- `------ <br />---------------- ---- ---- <br />-----_ "--------------------------- <br />------------- ----- -- <br />--------------------------- ---- <br />_ -- ------------- <br />----------------——�=a- ----------- -------------------------------------- ---- ------ — <br />--- <br />' - <br />� N - ---- ---- 1021 �� � <br />---- _ <br />--- J _ <br />I �, • � � 101 J- - 1020= -_---- ---- - <br />1� <br />i <br />i <br />I <br />I <br />0 <br />TEMPORARY SEED ON <br />BERM IF VACANT FOR <br />MORE THAN 14 DAYS <br />-------------------1020 -------- 1019.5 ------------------------ ---------��________ ----------------------- � ---- j. <br />\ , <br />1021 \ <br />1022 \' <br />---- —-------- ----- 1022.5 ---------------------- <br />7------------------------------------------------------- <br />L.P. ___--- <br />i <br />EDGE OF NEW <br />PAVEMENT <br />! <br />3 f <br />3 <br />F_ — — — — / — — — — — — — — - '--- - -- — — — <br />/ <br />NO 2`1\ 1 <br />- PARKING <br />w <br />r <br />------ Y <br />\ II <br />�v I <br />I <br />MATCH % j <br />EXISTING o <br />ELEVATION / <br />Z I <br />®Jx— <br />Q N 1 <br />\ 0-I N <br />\ / I n\ o 0 <br />\ O <br />/ I <br />\ <br />w BLOCK BUILDING I\ 1 <br />, o jo \ <br />1 0 \ <br />N ADDRESS NO. 2687 <br />TEMPORARY EROSION MEASURES <br />db ,f dl2! '\ <br />� 1 \ oro <br />ow <br />1 <br />11 1 I I \ \ \\ <br />I I \ \ <br />1 <br />I I \ \ \ <br />+ I I I I <br />1 1 I I I I <br />1 1 I I I I <br />I I I I 1 <br />I I I 1 <br />I I I I 1 <br />I I I I 1 <br />I , I <br />I I I <br />I I I I I <br />I <br />\ i i 'TEMPORARY <br />SILT'�FENCE <br />f I I <br />\ I I + <br />I \ I I I \ <br />I I I \ 1 <br />\ I I I 1 1 <br />I I I \ \ <br />I I 1 \ \ <br />I I I \ \ <br />I I I I 1 <br />I , <br />I I _ <br />1 I <br />I I I \ \ \ <br />I 1 \ \ <br />EDGE OF \\ \\\ <br />NEWI ASPHALT \\ <br />N <br />44 0 <br />R <br />T <br />N <br />0 10 20 40 <br />SCALE IN FEET <br />NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND <br />REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. <br />BIOROLL EROSION PROTECTION <br />LEGEND <br />» „ <br />8 10 EMBEDMENT DEPTH <br />DRAINAGE ARROW <br />.........._ <br />..__..._...........te. <br />>p <br />1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE <br />STATE OF MINNESOTA. <br />PRINT NAME: MICHAEL B. BRANDY , P.E. <br />SIGNATURE: <br />DATE 5-19-09 LICENSE # 41258 <br />902 PROPOSED CONTOUR <br />STAKING DETAIL <br />�-10PROPOSED 10' CONTOUR <br />{ - - - -_ <br />P <br />- 0- 0 <br />----- - - _ - -- w <br />---- - --- .BIOROLL <br />-=-------.-----_-_.--_-_--_---- -----_------ --- <br />----------- <br />— CL STREET <br />STORM WATER POLLUTION PREVENTION PLAN <br />CURB & GUTTER <br />EXISTING SAN. SEWER <br />-: <br />.... ................... ... .. <br />- <br />_ N <br />_ ____ _ <br />— — — — — — — — BLDG. SETBACK LINE <br />SCHEDULE OF INSTALLATION + MAINTENANCE <br />CALL 48 HOURS BEFORE DIGGING: <br />> <br />°I <br />o- <br />.. --- --- 1021 ----------------------------------------------- - - -- - <br />- <br />- <br />GOPHER STATE O N E CALL <br />ITEM INSTALLATION INSPECTION CT10N & MAINTENANCE REMOVAL <br />D& U EASEMENT LINE <br />CALL 811 <br />- <br />- --11 1 <br />WETLAND POND <br />INSPECT & MAINT. AFTER TRIBUTARY <br />> <br />BLOCK BU <br />BUFFER NE <br />_ <br />— — DELINEATED WETLAND LINE <br />PRIOR TO COMMENCEMENT AFTER EACH RUN-OFF DRAINAGE AREA IS <br />\% <br />I <br />o <br />ADDRESS NO <br />r <br />>> <br />SILT FENCE OF EARTHWORK OPERATIONS. EVENT. REMOVE SEDIMENTS RESTORED. <br />EXISTING STORM SEWER <br />1\ I <br />PERMANENT SEED &MULCH <br />AS REQUIRED. <br />PROPOSED STORM SEWER <br />» <br />- , \ <br />OPEN AREAS NOT RECEIVING / . \\ <br />INSTALL 8 CY <br />ROCK CONST. PRIOR TO COMMENCEMENT INSPECT REGULARLY.PRIOR TO PAVING. <br />DRIVE AISLE PANG SECTION <br />PERMANENT <br />j� t ''= I <br />SPECIAL PLANTINGS. <br />CL 3 PERMANENT RIPRAP <br />ENTRANCE OF EARTHWORK OPERATIONS. MAINTAIN AS NEEDED. <br />\` <br />EROSION <br />i i <br />OVERFLOW SWALE (TIE <br />OUTLET SKIMMER AFTER POND GRADING INSPECT REGULARLY. PERMANENT. <br />�O* <br />j <br />INTO EXISTING RIP RAP. <br />STRUCTURE IS COMPLETED. MAINTAIN AS NEEDED. <br />` <br />= _'�,a _ 3 l <br />UPON COMPLETION OF INSPECT & MAINTAIN <br />RIP -RAP & POND GRADING, CONC. AT LEAST ANNUALLY PERMANENT. <br />-rITT E� I <br />FILTERr\� <br />SWALE CONST. AND AND AFTER HEAVY <br />I <br />OUTLET INSTALLATION. RAINFALL EVENTS. <br />STAKE <br />INSPECT &MAINTAIN�F <br />— — <br />DETENTION POND DURING EARTHWORK AFTER HEAVY RAINFALL PERMANENT. <br />— — <br />* i / w / - — — — <br />N i 1 <br />OPERATIONS. EVENTS. REMOVE <br />SEDIMENTS AS NEEDED. <br />_ - <br />F $ \ 1 \ <br />INSPECT &MAINTAIN NO REMOVAL <br />SEED &MULCH AFTER FINAL GRADING AFTER HEAVY RAINS. <br />STRAW OR WOOD FIBER <br />6" TO 7" DIA. ROLL ENCLOSED IN <br />\ <br />/ NEW PAVEMENT SURFACE <br />= t` , <br />NECESSARY. <br />OPERATIONS. REPLACE WASH-OUT <br />PLASTIC OR POLYESTER NETTING <br />_ 1 <br />AREAS IMMEDIATELY.._ <br />/ \\ <br />INLET PROTECTION UPON INLET CONSTRUCTION WHEN 1/3 CAPACITY OF AFTER TRIBUTARY AREAS <br />/` -------------- -- <br />I <br />BMP IS REACHED ARE FULLY RESTORED.: <br />_ \\\l <br />NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND <br />REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. <br />BIOROLL EROSION PROTECTION <br />LEGEND <br />E-20 <br />-------902------- EXISTING CONTOUR <br />DRAINAGE ARROW <br />-------910-------- EXISTING 10' CONTOUR <br />1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE <br />STATE OF MINNESOTA. <br />PRINT NAME: MICHAEL B. BRANDY , P.E. <br />SIGNATURE: <br />DATE 5-19-09 LICENSE # 41258 <br />902 PROPOSED CONTOUR <br />SPENSA <br />OR ON 0, MINNESOTA <br />SPENSA DEVELOPMENT GROUP LLC <br />�-10PROPOSED 10' CONTOUR <br />om <br />— CL STREET <br />CURB & GUTTER <br />EXISTING SAN. SEWER <br />1 <br />— — — — — — — — BLDG. SETBACK LINE <br />> <br />CALL 48 HOURS BEFORE DIGGING: <br />> <br />PROPOSED SAN. SEWER <br />GOPHER STATE O N E CALL <br />Q <br />D& U EASEMENT LINE <br />CALL 811 <br />i <br />WETLAND POND <br />\ /N <br />\\ I IN <br />> <br />BLOCK BU <br />BUFFER NE <br />— — DELINEATED WETLAND LINE <br />E-20 <br />DRAINAGE ARROW <br />— — — -- — — _ — <br />1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE <br />STATE OF MINNESOTA. <br />PRINT NAME: MICHAEL B. BRANDY , P.E. <br />SIGNATURE: <br />DATE 5-19-09 LICENSE # 41258 <br />M••••• ....... <br />SPENSA <br />OR ON 0, MINNESOTA <br />SPENSA DEVELOPMENT GROUP LLC <br />SILT FENCE <br />om <br />N <br />> <br />EXISTING SAN. SEWER <br />1 <br />O1\ II <br />> <br />> <br />> <br />PROPOSED SAN. SEWER <br />Io <br />/ <br />Q <br />1 <br />6-18-09 <br />i <br />EXISTING WM <br />\ /N <br />\\ I IN <br />> <br />BLOCK BU <br />z <br />I <br />PROPOSED WM <br />\% <br />I <br />o <br />ADDRESS NO <br />I <br />>> <br />>> <br />EXISTING STORM SEWER <br />» <br />PROPOSED STORM SEWER <br />» <br />DRIVE AISLE PANG SECTION <br />PERMANENT <br />EROSION <br />M <br />DESIGNED: <br />MBB <br />1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE <br />STATE OF MINNESOTA. <br />PRINT NAME: MICHAEL B. BRANDY , P.E. <br />SIGNATURE: <br />DATE 5-19-09 LICENSE # 41258 <br />Anderson Engineering of Minnesota, LLC <br />CIVIL ENGINEERIN G A N D L A N D S U R V E Y IN G <br />13605 1st AVENUE NORTH, SUITE 100, PLYMOUTH, MN 55441 <br />TEL (763) 412-4000 FAX (763) 412-4090 <br />SPENSA <br />OR ON 0, MINNESOTA <br />SPENSA DEVELOPMENT GROUP LLC <br />TEMPORARY & PERMANENT <br />EROSION CONTROL PLAN <br />COMM. NO. <br />11586 <br />PLOTTED: <br />DRAWN: <br />PSH <br />DRAWING N0. <br />C <br />2 O r <br />2 <br />7-17-09 <br />CITY ENGINEER FINAL COMMENTS – PAVE SECTION PRIVATE <br />1 <br />6-18-09 <br />CITY ENGINEER COMMENTS <br />CHECKED BY: <br />N0. <br />DATE <br />DESCRIPTION OF REVISIONS <br />