My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-06-1995 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
1990-1999
>
1995
>
03-06-1995 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 4:02:19 PM
Creation date
1/13/2020 4:02:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Show annotations
View images
View plain text
. , .. <br /> ORONO PARK COMMI5SION MEETING <br /> MINUTES FOR MAItCH 6, i995 <br /> ATTENDANCE <br /> The Park Commission met on the above date with the following members present: Chair <br /> Richard Flint, Lili McMillan, Susan Wiison, Robert Howells, and James White. Sherokee <br /> Ilse was absent. Public Works Director John Gerhardson and Recorder Sherry Frost <br /> represerrted Staff. Chair Flint called the rneeting to order at 7:32 p.m. <br /> (#1) APPROVAL 4F MINUTES OF FEBRUARY b, 1945 <br /> �ritten corrections from the draft of the February 6, 1995 Park Commission Meeting <br /> were received. The minutes will be on the April meeting agenda for appr�val. <br /> (#2} CRYSTAL BAY PLAYGROUND <br /> McMillan reported that the playground plan was evaluated by Shardlow(Cathy) regarc3ing <br /> the location of the basketball cc�urt and skating rink. A letter was sent t� Commission <br /> members on her findings. The middle section of the park near the �razebo area is preferred <br /> due to several reasons: The nearby gazebo would enable spectators to watch the skaters; <br /> seating would be available for skate removal; poles are available for tighting; and na <br /> e�ensive grading of land would be required. Also, Judy of the post office preferred more <br /> contralled-type activities to eliminate balis and children from running into the parking lat <br /> area. The planner said as long as proper ctrainage is maintained, the ground could be <br /> seeded in the spring to allow for a�rassy area in the summer. Gerhardson commented <br /> that berms could be instalied around the perimeter if needed because the location was near <br /> a storm sewer and water could b�piped in. These costs would be figured into the <br /> operating budget. McMillan su,�ges#ed aerating the ground and seeding at the same time. <br /> The size of the rink is not yet determined and can easily be changed. <br /> McMillan said that David Owen of Earl Anderson Consuitants will look at the existing <br /> play equipment and report back in a caaple weeks with a plan incorporating the ideas and <br /> feedback given by the Commissioners. <br /> The development of the park will be completed in twa phases. The first phase wtll include <br /> the wood fence on the north and east sides, cleaning up the playfietd, plantings along the . <br /> post office, parking lot, and fence, and the ec�uipment improvements. The parking lot wiil <br /> be completed this year. Phase two will concentrate on the gazebo, basketball court, and <br /> skating rink in the mid-section area af the park. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).