My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-06-1992 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
1990-1999
>
1992
>
04-06-1992 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 3:20:40 PM
Creation date
1/13/2020 3:20:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, , <br /> .� � <br /> MINUTES OF THE PARK COMMISSION MEETING OF APRIL 6, 1992 <br /> ATTENDANCE 7 : 13 P.M. <br /> The Park Commission met on the above date with the following <br /> members present : Chairperson Dick Flint , Susan Wilson , Stephen <br /> Johnston , Sherokee Ilse , and Lili McMiilan . Robert Howells , Phil <br /> Bradley and Alex Vongries were absent . The following represented <br /> the City staff : John Gerhardson , Public Works Director; and Teri <br /> Naab, City Recorder . <br /> (#1 ) APPROVAL OF MINUTES <br /> Chair Flint clarified that on Page 11 , second paragraph , it should <br /> read as follows, "Chair Flint stated that OBA has let the <br /> Commission know they plan to request funding from Orono for the <br /> ball field" . <br /> It was moved by Wilson , seconded by Ilse , to approve the minutes <br /> of the regular meeting of the Park Commission held on March 2 , <br /> 1992 , with the above noted amendment . Ayes 5 , nays 0. <br /> (#2) BIKE HIKE TRAIL OLD CRYSTAL BAY ROAD <br /> Chair Flint explained that the City has been working on a bike <br /> trail for a long time , but it was difficult to build a bike trail <br /> because the City was missing the following : money, land and staff <br /> familiar with developing a trail . Therefore the County was asked <br /> to participate with the venture. <br /> Chair Flint introduced people from the County as follows : Jim <br /> White , Hennepin County Park Board Commissioner ; Don King , Chief <br /> Landscape Architect ; and Del Miller , Land Acquisition Officer for <br /> the County Park Board . <br /> White explained that the Hennepin County Park system has 25 ,000 <br /> acres of parks throughout five Counties . Many of those parks have <br /> been trying to get traits . He noted that there has not been a lot <br /> of expenditure of the Park ' s budget within Orono. He noted it <br /> would be desirable to have a system that would tie Baker Park with <br /> the Schools system, the Luce Line Trail and Noerenberg Park. White <br /> explained their options for a trail were to use the existing right- <br /> of-way or use land not a part of that right-of-way. He stated that <br /> County funds wou I d be used to bu i I d the t ra i I , of wh i ch much of the <br /> funding is reimbursed from the State through Open-Space Grants. <br /> Miller handed out a fact sheet on the trail . He stated that the <br /> County has agreed that the route proposed for the trail is the most <br /> viable . The trail has been proposed for the east side of the road <br /> because of a power tine on the western side . Also, it appeared to <br /> be easier to develop the trail on the eastern side because there <br /> are fewer residential properties on that side . The following <br /> options were studied : <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.