LEGAL DESCRIPTION:
<br />Lot 6, Block 5, including that part of the vacated Southwesterly 34 feet of Kelly Avenue lying between the extensions across it of the
<br />Northwesterly and Southeasterly line of said. Lot 6;
<br />That part of Lot 7, Block 5 lying Northwesterly of a line drawn parallel with the Southeasterly line of said Lot 7 from a point on the
<br />Northeasterly line of said Lot 7 distant 62.5 feet Northwesterly from the most Easterly corner of said Lot 7 to the shore of Lake
<br />Minnetonka, including that part of the vacated Southwesterly 34 feet of Kelly Ave. lying between the extensions across it of the above
<br />described parallel line and the Northwesterly line of said Lot 7, All in Townsite Of Langdon Park.
<br />The Southeasterly line of that part of Lot 7 described herein marked by Judicial Landmarks set pursuant to Torrens Case No. 5858:
<br />SCOPE OF WORK & LIMITATIONS:
<br />I. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include
<br />determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent
<br />legal counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be
<br />included on the survey have been shown.
<br />2. Showing the location of observed existing improvements we deem necessary for the survey.
<br />3. Setting survey markers or verifying existing survey markers to establish the corners of the property.
<br />4. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies that
<br />may have jurisdiction over these requirements to verify they are correctly shown before proceeding with construction..
<br />5. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a
<br />benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the benchmark
<br />provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other
<br />elevations for use on this site or before beginning construction.
<br />6. While we show a proposed location for this home or addition., we are not as familiar with your proposed plans as you, your architect,
<br />or the builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match
<br />your plans before construction begins. Also, we are not as familiar with local codes and minimum requirements as the local building
<br />and zoning officials in this community are. Be sure to show this survey to said officials, or any other officials that may have
<br />jurisdiction over the proposed improvements and obtain their approvals before beginning construction or planning improvements to
<br />the property.
<br />7. Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and or stucco of the
<br />building.
<br />DenotesSTANDARD SYMBOLS & CONVENTIONS:
<br />•noted.
<br />• Install silt fence/bio roll around the perimeter of -the construction area..
<br />• Sediment control measures must remain in place until final stabilization has been established and then shall be removed.
<br />Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next rain.
<br />• A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of 1 to 2 inch rock
<br />extending at least 50 feet from the street into the site and shall be underlain with permeable geotextile fabric. The entrance
<br />shall be maintained during construction by top dressing or washing to prevent tracking or flow of sediments onto public streets,
<br />walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent unprotected exit from the site.
<br />• Contractor shall install inlet protection on all existing storm sewer inlets in accordance with the city standard ; -tails. Inlet
<br />protection shall also be provided on all proposed storm sewer inlets immediately=-ollowing constructioe inlet. Inlet
<br />protection must be installed in a manner that will not impound water for extended periods of time or in a manner that presents a
<br />hazard to vehicular or pedestrian traffic,
<br />DURING CONSTRUCTION:
<br />A
<br />When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff
<br />and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be seeded with Minnesota
<br />Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch.
<br />• A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be serviced regularly
<br />to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with
<br />Minnesota Pollution Control Agency requirements.
<br />• A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with
<br />MPGA requirements.
<br />• Concrete truck washout shall be in the plastic lined ditch shown on this plan for "CW" and dispose of washings as solid waste.
<br />• Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as
<br />necessary to provide downstream protection.
<br />• Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly be removed.
<br />• If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas.
<br />• Moisture shall be applied to disturbed areas to control dust as needed.
<br />• Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained.
<br />• If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the
<br />double silt fence around these areas can filter the water before it leaves the site.
<br />• Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall consist of broadcast
<br />seeding with Minriesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray
<br />mulch.
<br />• Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary
<br />earth dikes, sediment traps or basins and additional silt fencing as deemed necessary to control erosion.
<br />SITE WORK COMPLETION:
<br />• When final. grading has been completed but before placement of seed or sod an "as built" survey shall be done per City of
<br />Orono requirements to insure that grading was properly done.
<br />• When any remedial grading has been completed, sod or seeding shall be completed including any erosion control blankets for
<br />steep areas.
<br />• When turf is established,, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent
<br />streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and clean. Ii
<br />• Contractor shall maintain positive drainage of a minimum 2% slope away from proposed building.
<br />FOUND IRON W/ CAP -
<br />\ , -INSTALL ROCK
<br />CONSTRIC RON
<br />ENTRANCE PER NOTES
<br />0 •�
<br />APPROk/,WAS fpoE or W
<br />A 7E7f?
<br />r , to\ 'I \ city gond
<br />Planning & Zoning
<br />Plan Review
<br />_N-
<br />7111 > IV Site Pian Review Date: J vim,
<br />(�
<br />—INSTALL SILT AP ODD VViTH REVIS
<br />/ �/ PPROVE IONS see )
<br />959- FENCE/BIO ROLLI DENIED
<br />96
<br />461
<br />Staff: i _. �✓
<br />i , `% — F�ROR-OSED
<br />RE AINONG J4 ALS, r l
<br />'-MAX IlE`IGHIT
<br />INSTALL SIL T '' \ \ \ \ ` , / ' < - 9Q/V,
<br />r \ FENCE/BIO ROLL `
<br />CITY OF ORONO
<br />�� �� ��o/�, vis , �� �� VA\ I�� 'i ; SITE PLAN _GRADING PLAN
<br />0 APPROVED
<br />APPROVED WITH REVISIONS see A,1
<br />❑ DISAPPROVED €"`� `° "� 4-3
<br />DATE 16 oc.7
<br />I
<br />- ORONO COPY
<br />RECEIVED
<br />sa4)
<br />9
<br />v
<br />+7,L.OCT 16 207
<br />CITY OF ORONO
<br />E,1YS'T11Vt ' MW7OUR 925
<br />PROPOS:9 CONTOUR 19,25
<br />sr
<br />s ,
<br />PR41%5[ i.T, , l4R O#r — l'LOK
<br />s s s
<br />/ r r
<br />1g1?r '
<br />®Vans
<br />r' 1g = SILT FrL�rff/sTR4 Lacs S
<br />s s
<br />r
<br />lot,
<br />rr
<br />rr
<br />s r
<br />s
<br />ti''✓ rs'r
<br />qts- ,' rrr
<br />s ss
<br />ti� Y r
<br />rss
<br />�9
<br />cy
<br />C0_1VCRff7F #,r4 0brT ARE4
<br />'USTINC� TREE' TO RERL' OY�P
<br />SurveyingAdvance
<br />& Engineering, Co.
<br />5300 South Hwy. No 101
<br />Minnetonka, Minnesota 55345
<br />Phone (952) 474-7964
<br />Web: www.advsur.com
<br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
<br />OR REPORT WAS PREPARED BY ME OR UNDER MY
<br />DIRECT SUPERVISION AND THAT I AM A DULY
<br />REGISTERED PROFESSIONAL CIVIL ENGINEER UNDER
<br />THE LAWS OF THE STATE OF MINNESOTA.
<br />Ja a S. Rinke
<br />52716
<br />LICENSE NO.
<br />AUGUST 3, 2017
<br />DATE
<br />DRAWING ORIENTATION & SCALE
<br />0 40' 80'
<br />'IYI
<br />. 91
<br />At 2 JP f
<br />t'REVISION
<br />WIMOVED HOME & REGRADED
<br />1
<br />SHEET TITLE
<br />� Pi`SITE PLAN
<br />SHEET 1 OF 2
<br />2ek2_5 Ke11V A -VP--
<br />2017 -° 010-15
<br />N w }u-
<br />
|