Laserfiche WebLink
LEGAL DESCRIPTION: <br />Lot 6, Block 5, including that part of the vacated Southwesterly 34 feet of Kelly Avenue lying between the extensions across it of the <br />Northwesterly and Southeasterly line of said. Lot 6; <br />That part of Lot 7, Block 5 lying Northwesterly of a line drawn parallel with the Southeasterly line of said Lot 7 from a point on the <br />Northeasterly line of said Lot 7 distant 62.5 feet Northwesterly from the most Easterly corner of said Lot 7 to the shore of Lake <br />Minnetonka, including that part of the vacated Southwesterly 34 feet of Kelly Ave. lying between the extensions across it of the above <br />described parallel line and the Northwesterly line of said Lot 7, All in Townsite Of Langdon Park. <br />The Southeasterly line of that part of Lot 7 described herein marked by Judicial Landmarks set pursuant to Torrens Case No. 5858: <br />SCOPE OF WORK & LIMITATIONS: <br />I. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include <br />determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent <br />legal counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be <br />included on the survey have been shown. <br />2. Showing the location of observed existing improvements we deem necessary for the survey. <br />3. Setting survey markers or verifying existing survey markers to establish the corners of the property. <br />4. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies that <br />may have jurisdiction over these requirements to verify they are correctly shown before proceeding with construction.. <br />5. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a <br />benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the benchmark <br />provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other <br />elevations for use on this site or before beginning construction. <br />6. While we show a proposed location for this home or addition., we are not as familiar with your proposed plans as you, your architect, <br />or the builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match <br />your plans before construction begins. Also, we are not as familiar with local codes and minimum requirements as the local building <br />and zoning officials in this community are. Be sure to show this survey to said officials, or any other officials that may have <br />jurisdiction over the proposed improvements and obtain their approvals before beginning construction or planning improvements to <br />the property. <br />7. Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and or stucco of the <br />building. <br />DenotesSTANDARD SYMBOLS & CONVENTIONS: <br />•noted. <br />• Install silt fence/bio roll around the perimeter of -the construction area.. <br />• Sediment control measures must remain in place until final stabilization has been established and then shall be removed. <br />Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next rain. <br />• A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of 1 to 2 inch rock <br />extending at least 50 feet from the street into the site and shall be underlain with permeable geotextile fabric. The entrance <br />shall be maintained during construction by top dressing or washing to prevent tracking or flow of sediments onto public streets, <br />walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent unprotected exit from the site. <br />• Contractor shall install inlet protection on all existing storm sewer inlets in accordance with the city standard ; -tails. Inlet <br />protection shall also be provided on all proposed storm sewer inlets immediately=-ollowing constructioe inlet. Inlet <br />protection must be installed in a manner that will not impound water for extended periods of time or in a manner that presents a <br />hazard to vehicular or pedestrian traffic, <br />DURING CONSTRUCTION: <br />A <br />When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff <br />and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be seeded with Minnesota <br />Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch. <br />• A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be serviced regularly <br />to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with <br />Minnesota Pollution Control Agency requirements. <br />• A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with <br />MPGA requirements. <br />• Concrete truck washout shall be in the plastic lined ditch shown on this plan for "CW" and dispose of washings as solid waste. <br />• Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as <br />necessary to provide downstream protection. <br />• Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly be removed. <br />• If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas. <br />• Moisture shall be applied to disturbed areas to control dust as needed. <br />• Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained. <br />• If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the <br />double silt fence around these areas can filter the water before it leaves the site. <br />• Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall consist of broadcast <br />seeding with Minriesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray <br />mulch. <br />• Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary <br />earth dikes, sediment traps or basins and additional silt fencing as deemed necessary to control erosion. <br />SITE WORK COMPLETION: <br />• When final. grading has been completed but before placement of seed or sod an "as built" survey shall be done per City of <br />Orono requirements to insure that grading was properly done. <br />• When any remedial grading has been completed, sod or seeding shall be completed including any erosion control blankets for <br />steep areas. <br />• When turf is established,, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent <br />streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and clean. Ii <br />• Contractor shall maintain positive drainage of a minimum 2% slope away from proposed building. <br />FOUND IRON W/ CAP - <br />\ , -INSTALL ROCK <br />CONSTRIC RON <br />ENTRANCE PER NOTES <br />0 •� <br />APPROk/,WAS fpoE or W <br />A 7E7f? <br />r , to\ 'I \ city gond <br />Planning & Zoning <br />Plan Review <br />_N- <br />7111 > IV Site Pian Review Date: J vim, <br />(� <br />—INSTALL SILT AP ODD VViTH REVIS <br />/ �/ PPROVE IONS see ) <br />959- FENCE/BIO ROLLI DENIED <br />96 <br />461 <br />Staff: i _. �✓ <br />i , `% — F�ROR-OSED <br />RE AINONG J4 ALS, r l <br />'-MAX IlE`IGHIT <br />INSTALL SIL T '' \ \ \ \ ` , / ' < - 9Q/V, <br />r \ FENCE/BIO ROLL ` <br />CITY OF ORONO <br />�� �� ��o/�, vis , �� �� VA\ I�� 'i ; SITE PLAN _GRADING PLAN <br />0 APPROVED <br />APPROVED WITH REVISIONS see A,1 <br />❑ DISAPPROVED €"`� `° "� 4-3 <br />DATE 16 oc.7 <br />I <br />- ORONO COPY <br />RECEIVED <br />sa4) <br />9 <br />v <br />+7,L.OCT 16 207 <br />CITY OF ORONO <br />E,1YS'T11Vt ' MW7OUR 925 <br />PROPOS:9 CONTOUR 19,25 <br />sr <br />s , <br />PR41%5[ i.T, , l4R O#r — l'LOK <br />s s s <br />/ r r <br />1g1?r ' <br />®Vans <br />r' 1g = SILT FrL�rff/sTR4 Lacs S <br />s s <br />r <br />lot, <br />rr <br />rr <br />s r <br />s <br />ti''✓ rs'r <br />qts- ,' rrr <br />s ss <br />ti� Y r <br />rss <br />�9 <br />cy <br />C0_1VCRff7F #,r4 0brT ARE4 <br />'USTINC� TREE' TO RERL' OY�P <br />SurveyingAdvance <br />& Engineering, Co. <br />5300 South Hwy. No 101 <br />Minnetonka, Minnesota 55345 <br />Phone (952) 474-7964 <br />Web: www.advsur.com <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION <br />OR REPORT WAS PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION AND THAT I AM A DULY <br />REGISTERED PROFESSIONAL CIVIL ENGINEER UNDER <br />THE LAWS OF THE STATE OF MINNESOTA. <br />Ja a S. Rinke <br />52716 <br />LICENSE NO. <br />AUGUST 3, 2017 <br />DATE <br />DRAWING ORIENTATION & SCALE <br />0 40' 80' <br />'IYI <br />. 91 <br />At 2 JP f <br />t'REVISION <br />WIMOVED HOME & REGRADED <br />1 <br />SHEET TITLE <br />� Pi`SITE PLAN <br />SHEET 1 OF 2 <br />2ek2_5 Ke11V A -VP-- <br />2017 -° 010-15 <br />N w }u- <br />