Laserfiche WebLink
A <br /> gv 0� <br /> 0 O <br /> f1 , �, CITY of ORONO <br /> Municipal Offices <br /> ,1, <br /> ".., pj. Street Address: Mailing Address: <br /> 9kES13.- 2750 Kelley Parkway P.0. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> April 3, 2009 <br /> Michael Kuruvilla <br /> Orono Montessori School <br /> 850 W. Wayzata Blvd. <br /> Wayzata, MN 55391 <br /> Re: Municipal Sewer& Water Service <br /> Dear Mr. Kuruvilla: <br /> The City Council has reviewed your letter requesting re-guiding of the Orono Montessori <br /> property from Single-family Rural Residential Use to Institutional Use, to allow incorporation of <br /> the property into the Metropolitan Urban Service Area (MUSA). Inclusion in the MUSA is <br /> required in order for municipal sewer to be extended to your property. Per the comments of <br /> Metropolitan Council staff in November 2007, this change would allow the property to be added <br /> to the MUSA without being part of Orono's overall residential density calculation. Therefore, <br /> the City Council has directed that this change be presented to the Metropolitan Council as an <br /> element of the Orono Comprehensive Plan Update. The Update is expected to be approved by <br /> Met Council late in 2009, which would allow for potential construction of sewer to your property <br /> during the 2010 construction season. Note that provision of just municipal water to your <br /> property does not require inclusion in the MUSA. <br /> Sewer. The cost of a sewer extension to serve your property at 850 Wayzata Boulevard is <br /> estimated by the City Engineer at approximately $66,000. Because that extension would also <br /> serve the property across from you at 875 Wayzata Boulevard if/when it develops, we would <br /> expect that some portion of the cost would be attributed to that property. However, the relative <br /> proportioning of the cost between 850 and 875 has not been determined, and 875 would have <br /> additional costs in extending the line under Wayzata Boulevard. Also, it is the City's current <br /> position that final design and installation of the sewer extension to serve both properties will not <br /> proceed at all until 875 develops (which is expected to begin in late 2009 or early 2010, but is <br /> not firm at this time). Note that the sewer system serving your property is expected to be a <br /> pressure sewer system, requiring you to construct and maintain a grinder station to discharge <br /> your effluent to the City sewer line. <br /> Water. Regarding municipal water, the City Council has authorized the City Engineer to prepare <br /> final plans and specifications for an extension of the water system to serve your property, as part <br /> of the Myrtlewood sewer& water project scheduled for the summer of 2009. The cost estimate <br /> Telephone(952)249-4600 • Fax (952)249-4616 <br /> www.ci.orono.mn.us <br />