Laserfiche WebLink
Lighting Ivey <br />(18) SPJ Uplights <br />(1) SPJ Uplight <br />(1) Hadco Transformer / <br />Photocell <br />I NT <br />�11JL CL U C,S <br />All existing plant material $ rock <br />in the construction area will be <br />demoed and disposed of. Any <br />transplantable plants will be moved <br />t re -located at a later time. <br />Pool company to be responsible <br />for setting the correct grade of <br />the pool$ concrete surfaces, Impact <br />+ Nyhro Design •Group will be responsible <br />for any additional excavation for the retaining <br />wall and grading of the drainage Swale. <br />Ae recommend that the pool <br />excavator do the additional grading <br />$ excavation when they dig the pool <br />will be project managed by Impact + 1 Iyhra, <br />o <br />Grass <br />oeoNocopI <br />ORONO COPY <br />Pro os d Grade <br />�ainage of Swale @ (-52")� <br />(5) Glossy Black <br />Chokeberry <br />0 _— Pool Equip, <br />Pad 44") <br />0 <br />Light Box <br />Connection <br />-ON @ (o") <br />M @ (-44") <br />mented Retaining <br />Anchor Diamond <br />�e Cut <br />Ornamental Grass <br />Wono <br />'oning Plan Review <br />view Date: <br />:D <br />D WITH F- VISIONS (see notes) <br />This landscape architectural rendering <br />contains proprietary information and is <br />protected unde U.S. copywright lain and <br />may not be duplic ted / implemented <br />without permissioH from Impact + f 1yhra <br />design Group. 1, 1 <br />2-(c6s, Coun*yw4t- P' w <br />206- 00t4Y Pwria <br />2,01 S - 0017(9 <br />4= <br />Z <br />0 <br />O <br />W <br />a <br />n <br />RECEIVE® <br />JUL 15 2015 <br />CITY OF ORONO <br />Powered by DynaSCAPP <br />V <br />S <br />9 <br />Z <br />0 <br />O <br />W <br />a <br />n <br />RECEIVE® <br />JUL 15 2015 <br />CITY OF ORONO <br />Powered by DynaSCAPP <br />