My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: final inspect
Orono
>
Property Files
>
Street Address
>
W
>
Walters Port Lane
>
2709 Walters Port Lane - 21-117-23-23-0060
>
Correspondence
>
Re: final inspect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:04:42 PM
Creation date
7/15/2019 2:27:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2709
Street Name
Walters Port
Street Type
Lane
Address
2709 Walters Port Lane
Document Type
Correspondence
PIN
2111723230060
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2335 Highway 36 W <br /> St.Paul,MN 55113 <br /> Tel 651-636-460C <br /> Fax 651.636.1311 <br /> www.bonestroo.com <br /> May 14, 2008 Bonestroo <br /> Mr. Lyle Oman <br /> Building Official <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 2709 Walters Port Lane <br /> File No. 000139-08000-1 <br /> Plat No. 07-3333 <br /> Dear Lyle: <br /> On May 13, 2008, 1 visited the Dunkley residence at 2709 Walters Port Lane for the final inspection. At the <br /> time of the inspection the contractor was working on the following: <br /> 1. The North half of the East wall was fully complete and awaiting final inspection. Full completion <br /> includes installation of the tie-backs, 1'xl'x112" stainless steel plates and(2)3"x3"x114" painted <br /> angled-steel run longitudinally along the wall above the wafer.The contractor was unable to finish <br /> the South half of the East wall due to complications of moving equipment into the area until the <br /> back fill was complete on the North half. Therefore, I said the construction of the East wall was <br /> correct and they may proceed with backfill and finish the South half of the East wall the same as <br /> the North half. <br /> 2. The West wall, City side, was still under construction.The crew was working on the installation of <br /> the tie-backs, the stainless steel plates and the steel angle,therefore, a final inspection was not <br /> performed. <br /> The current construction and materials on site are within accordance of the plans and revisions submitted <br /> by Ulteig Engineering. I told the contractor, if they finish the remaining sections of wall in a similar fashion <br /> as the North half of the East wall, both the East and West walls will be satisfactory. <br /> In summary, the construction and materials of the East wall are correct but a final inspection of the West, <br /> wall is recommended. <br /> If you have any questions, please call me at(651)967-4567. <br /> Yours very truly, <br /> BONESTR00 <br /> OX-1t,� <br /> Brian Fleming <br /> Cc: Tom Kellogg <br />
The URL can be used to link to this page
Your browser does not support the video tag.