My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: grading
Orono
>
Property Files
>
Street Address
>
T
>
Tonkaview Lane
>
4685 Tonkaview Lane - 07-117-23-32-0065
>
Correspondence
>
Re: grading
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:08 PM
Creation date
5/7/2019 1:46:38 PM
Metadata
Fields
Template:
x Address Old
House Number
4685
Street Name
Tonkaview
Street Type
Lane
Address
4685 Tonkaview La
Document Type
Correspondence
PIN
0711723320065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � <br /> �O� <br /> CITY of ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> g0 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> March 19, 2001 <br /> Dennis Meyer <br /> 4685 Tonkaview Lane <br /> Mound, MN 55364 <br /> Re: Final site grading <br /> Dear Dennis: <br /> Last fall City Engineer Tom Kellogg and I visited your property to confirm that the conditions of <br /> approval for your site grading had been carried out according to the approved plan. Remember that <br /> the goal was to direct as much of your drainage as possible to the back of your lot. We took a <br /> number of spot elevation measurements and confirmed that the grading for the most part does follow <br /> the plan,but should be modified slightly to reduce the potential neighborhood impacts. We briefly <br /> discussed these items with you on the site, but I wanted to get a letter out to remind you of these <br /> items: <br /> 1. A low curb should be added to the west side of your driveway, in order to direct runoff <br /> toward the back of your property rather than toward the neighbor to your west. <br /> 2. When finish-grading the lawn area east of your driveway,raise the grade as necessary so that <br /> the runoff from the south half of your driveway will eventually run to the south rather than <br /> to the street(See attached sketch with notes). <br /> The small detention pond area in the back looked fine. Thank you for your continued attention to <br /> these final details on your new home. If you have any questions,please feel free to give me a call <br /> at 952-249-4600. <br /> Sincerely, <br /> Michael P. Gaffron - <br /> Planning Director <br /> encl. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.cLoronomn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.