My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1992 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1992
>
08-24-1992 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 3:42:12 PM
Creation date
4/29/2019 3:42:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />MINUTES OF THE REGULAR ORONO COUNCIL MEETING <br />HELD AUGUST 24, 1992 <br />ROLL <br />The Council met on the above date with the following members <br />present: Mayor Barbara Peterson, Councilmembers J. Diann Goetten, <br />Gabriel.. Jabbour, Edward Callahan and Mary Butler. The following <br />represented the City staff: City Administrator Ron Moorse, <br />Building & Zoning Administrator Jeanne Mabusth, Assistant Planning <br />and Zoning Administrator Michael Gaffron, City Attorney Thomas <br />Barrett, City Engineer Glenn Cook, Chief of Police Stephen <br />Sullivan, and City Recorder Teri Naab. Mayor Peterson called the <br />meeting to order at 7:00 P.M. <br />( #1) CONSENT AGENDA <br />Goetten added Item #6 to the.Consent Agenda. <br />Butler added Items #12 and 13. <br />It was moved by Jabbour, seconded by Goetten, to approve the <br />Consent Agenda as amended. Ayes 5, nays 0. <br />Motions for all items adopted by consent agenda will b,e included <br />in the minutes in their respective numerical order. <br />( #2) LEAF STREET RECONSTRUCTION TO MSA.STANDARDS <br />Mayor Peterson noted she had received several calls from residents <br />unable to attend the last public information meeting regarding this - <br />issue. She informed them to attend this meeting to express their <br />views. She opened the public information meeting at 7:03 p.m. <br />Goetten stated that her main concern with the project was saving <br />as many trees as possible. She advised because of the excellent job <br />being done by the contractors, there have been fewer trees lost <br />than anticipated. She stated in light of- the area residents', <br />opposition of widening the road, she agreed with reconstructing the <br />road outside the standards of MSA, but.asked.that the roadway be. <br />brought up to City standards. Butler concurred. <br />Cook noted he would rather not reconstruct the street at a 24' <br />width, as it would be wider than the project specifications. <br />Jabbour said his concern at the last meeting was that the street <br />was diverting from City standards, but since that meeting has been <br />infor ed.that the previous sewer project reconstructed the streets <br />less th an required by City standards. He stated a concern that the <br />Community only pay for the road once, and noted the City may be <br />forced in the near future. to upgrade the road. Mayor Peterson <br />agreed with the majority opinion'. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.