My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: pond clean-up
Orono
>
Property Files
>
Street Address
>
T
>
Tanglewood Road
>
1520 Tanglewood Road - 26-118-23-32-0010
>
Correspondence
>
Re: pond clean-up
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:17:08 PM
Creation date
4/17/2019 10:07:00 AM
Metadata
Fields
Template:
x Address Old
House Number
1520
Street Name
Tanglewood
Street Type
Road
Address
1520 Tanglewood Road
Document Type
Correspondence
PIN
2611823320010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gustafson design, ince <br /> 4{..�:5trrsl.t...Zw+A.:...7r5..<tfnT...l..i...i'c.•d:..E...S....3...".......- <br /> November 18, 1994 <br /> Mr. Andrew Syverson <br /> Wenck Associates, Inc. <br /> 1800 Pioneer Creek Center <br /> Maple Plain, MN 55359 <br /> Dear Mr. Syverson: <br /> As per our c=yersation on November 15, I am writing to summarize our pond <br /> clean-up project a 520 Tatte�rs�e2 <br /> Orono. I have met with the city of Orono and <br /> their main concern is t is OK with the project. <br /> The project begin because of a need to replace an old culvert under the drive that <br /> would freeze up every winter and cause the runoff to drain over the drive. At that time <br /> we felt it would be a good idea to do some pond clean up. The pond was originally dug <br /> by one of the previous owners and was a small berm or dam was formed on the marsh <br /> side of the pond. It was made with the existing soil and did not hold water at a constant <br /> level, but would fluctuate with the water in the marsh. This left long periods of time <br /> where the mud bank were unsightly and would wash into the pond. We determined that <br /> we could hold the edge better by placing boulders around some of the perimeter of the <br /> pond. <br /> Boulders were placed around part of the perimeter of the pond and the "berm" that <br /> was on the marsh side was regraded to allow us to set the boulders. The soil was so wet <br /> that it could not be graded very well this fall. We plan to smooth out the soil and seed the <br /> area in the spring as soon and conditions allow. <br /> If there are questions or concerns please call my office. Thank you for your help. <br /> S' ce ly, <br /> Dale A. Gustafson <br /> alj/dag <br /> cc City of Onono <br /> Post-it-brand fax transmittal euro 7671 M°t P 9e0 ► <br /> To for <br /> Co. ° <br /> Dept. hone x <br /> Fsxd �/ exM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.