Laserfiche WebLink
• • • • <br /> e <br /> To: Rick Kreiger, Kevin Kamerud, Mike Gaffron and Bruce Vang <br /> Fnarr Willie Gibbs, ISTS Manager <br /> Datee May 16,2006 <br /> Ree 355 Stubbs Bay Road <br /> The proposed bam addition is to include plumbing. The septic system for the house is located approx. <br /> 150 feet or more away from the plumbing in the bam. This additional plumbing will also be adding to <br /> the water flow into the system. I am there fore requiring that the following be done: <br /> 1) The existing system must be certified as to being up to code and sized appropriately for the amount <br /> of current and proposed water useage. If the existing system is found to be up to code then a site <br /> plaNdesign needs to be submitted showing how the sewage from the bam is going to be hooked into <br /> the system. A secondary septic site must be identified on the site plan. <br /> 2) If the existing system is not up to code then a new design must be done. The new design must <br /> show how the bam plumbing is to be connected and must also show a secondary septic site. <br /> If the building perrnit for the bam is issued then it should be agreed that no plumbing would be allowed <br /> until the questions regarding the septic system have been answered. <br /> 1 <br />