Laserfiche WebLink
; __._.._ -_. <br /> � __O ~ <br /> i 7 �, <br /> ��O O��'; <br /> ;�� ; : �'� CITY of OIZONO <br /> �I ,� � ,,a ,�,1, <br /> �` ,- '�. ,; ��, / Municipal Offices <br /> `,�"�, + <br /> � Street Address: Mailing Address: <br /> `. t� � , r., G : <br /> �`� . 'g'� 2750 Kelle Parkwa P.O. Box 66 <br /> xE$8� y y <br /> - __. � Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address � S� � �-JA'� 2f�T/� f3�� �? <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A - <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. _ <br /> Imminent Public Health Threat <br /> . Yes �� <br /> No <br /> - If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic-systEm must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identifi as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 _. ✓� <br /> _ December 31,2010 <br /> Other , <br /> Septic Tank(s) Pump out Needed - - - <br /> Yes _�� <br /> No . . __ - _ <br /> � The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �/����p S . The tank(s) should be cleaned through the manhole and <br /> .. not through the inspection pipes,this allows for proper cleaning. ' <br /> Camments: <br /> � <br /> Insp r• Date of Inspection � t-d S <br /> Telephone"(952)249-4600 • Fax(952)249-461b <br /> _ www.ci.orono.mn.us <br />