Laserfiche WebLink
�,..� ^� <br /> � � <br /> /.'/� O,�`� - <br /> ;;� ';���, CITY of OIZON� <br /> �,�; ,� �; f `, �li <br /> `,\� `;; , ��,;,; Municipal Offices <br /> � � � Street Address: Mailing Address: <br /> ��9,kE '�p4�'G 2750 Kelley Parkway P.O. Boz 66 <br /> s Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner of Address / 3 �C7 �: � �'� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes =�No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Ident' ed as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 � <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No ► <br /> The City recommends the septic tank(s) and/or lift tanlc be serviced and pumped <br /> out every three years. City records indicate the tanic(s) were last pumped out on <br /> t� - `�,-�� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> .. � �.� � � <br /> Inspe r• � �� 9 "� ' Date of Inspection <br /> �� n <br /> �'elepa�one(.95?)2�9-4600 � �'as(.9��) 2�9-�61� <br /> 66'�i'i4''.C9.0!'QI30.i1381.ti5 <br />