My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
sewer info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1295 Sixth Ave N - 26-118-23-34-0008
>
Correspondence
>
sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:25 PM
Creation date
1/10/2019 11:44:51 AM
Metadata
Fields
Template:
x Address Old
House Number
1295
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1295 6th Avenue North
Document Type
Correspondence
PIN
2611823340008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .� I �r �i � S�l�c�� l�v � �� <br /> . o , <br /> , <br /> � � <br /> 0 0 . <br /> � CITY of ORONO <br /> a� '�` , r��_• �„ <br /> �, � `,�r . ; ,� Municipal Oftices <br /> '�' , , ; �;`� G <br /> � ` ': .� Street Address: Mailing Rddress: <br /> `4$'Egg04' 2750 Kelley Parkway P.O. Box 66 <br /> - - " Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> I�iarch 13, 2003 <br /> Dear Nei�hborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Lon� Lake East neiQhborhood. This project consists of <br /> di:ectional boring a pressure se�ver line north of the existing houses, and the provision of a <br /> se:��ice stub for each house. Directional boring of the se���er should result in minimal disturbance <br /> to �-our property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There may- also be minimal <br /> disturbance in the areas where the coztractor sets up the directional boring machine. All <br /> disturbed areas �vill be restored as par of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the se��-er is not requi�r�d, but the system �r-ill be available for future hookup upon <br /> pa�-ment of a connection fee. The current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for i�flationary increases. In addition to the City connection fee, <br /> there is also a Service Availability C�TQe (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> se«-er capacity that is included in the metropolitan interceptor sewers and�vastewater treatment <br /> plants for hzture se��-er connections. This is a pressure se«-er system, and each property owner is <br /> required to install, operate, and maintain their o�vn private residential grinder pump station. <br /> The City will need to acquire a 20-:aot ���ide permanent se��-er easement acro�s your property for <br /> the installation and future maintenance of the sewer. We �vould like to obtain a "Right of Entry" <br /> to allo�v access on }�our property to complete the project construction. After the sewer is <br /> in�talled, the exact pipe location«-ill be surveyed and a leaal description developed for an <br /> easement document. � <br /> Page 1 of 2 <br /> Telephone(9`2)249-4600 • Fax(952)249-4616 <br /> Rww.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.