Laserfiche WebLink
. .� I �r �i � S�l�c�� l�v � �� <br /> . o , <br /> , <br /> � � <br /> 0 0 . <br /> � CITY of ORONO <br /> a� '�` , r��_• �„ <br /> �, � `,�r . ; ,� Municipal Oftices <br /> '�' , , ; �;`� G <br /> � ` ': .� Street Address: Mailing Rddress: <br /> `4$'Egg04' 2750 Kelley Parkway P.O. Box 66 <br /> - - " Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> I�iarch 13, 2003 <br /> Dear Nei�hborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Lon� Lake East neiQhborhood. This project consists of <br /> di:ectional boring a pressure se�ver line north of the existing houses, and the provision of a <br /> se:��ice stub for each house. Directional boring of the se���er should result in minimal disturbance <br /> to �-our property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There may- also be minimal <br /> disturbance in the areas where the coztractor sets up the directional boring machine. All <br /> disturbed areas �vill be restored as par of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the se��-er is not requi�r�d, but the system �r-ill be available for future hookup upon <br /> pa�-ment of a connection fee. The current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for i�flationary increases. In addition to the City connection fee, <br /> there is also a Service Availability C�TQe (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> se«-er capacity that is included in the metropolitan interceptor sewers and�vastewater treatment <br /> plants for hzture se��-er connections. This is a pressure se«-er system, and each property owner is <br /> required to install, operate, and maintain their o�vn private residential grinder pump station. <br /> The City will need to acquire a 20-:aot ���ide permanent se��-er easement acro�s your property for <br /> the installation and future maintenance of the sewer. We �vould like to obtain a "Right of Entry" <br /> to allo�v access on }�our property to complete the project construction. After the sewer is <br /> in�talled, the exact pipe location«-ill be surveyed and a leaal description developed for an <br /> easement document. � <br /> Page 1 of 2 <br /> Telephone(9`2)249-4600 • Fax(952)249-4616 <br /> Rww.ci.orono.mn.us <br />