Laserfiche WebLink
t _ -1 � S. <br /> 1 Z� � 1� -���, 1��� � <br /> � <br /> � � o <br /> � � � <br /> 0 0 � <br /> ` CITY of ORONO <br /> ,� �����, <br /> � � � <br /> �, r ,:�' .°` ' ti Municipal Offices <br /> 'C� - ' , j'� '..; Gti' <br /> � ' � , Street Address: Mailing kddress: <br /> 9�'EggO�' ' 2750 Kelley Parkway P.O. Box 66 <br /> , _- _____, <br /> --— Orono, MN 55356 <br /> Crystal Bay, MN 55323-0066 <br /> 1�larch li, 2003 <br /> Dear Nei�hborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Long Lake East neighborhood. This project consists of <br /> directional boring a pressure se�ver line north of the existing houses, and the provision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to your property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There may also be minimal <br /> disturbance in the areas where the contractor sets up the directional boring machine. All <br /> disturbed areas will bz restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the se�i-er is not required, but the system will be available for future hookup upon <br /> payment of a connection fee. �I'he current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Servicz Availability Ch�rge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> sewer capacity that is included in the metropolitan interceptor sewers and �vastewater treatment <br /> plants for fi.rture se«-er connections. This is a pressure sewer system, and each property owner is <br /> required to install, operate, and maintain their own private residential grinder pump station. <br /> The City will need to acquire a 20-foot��zde permanent sewer easement acro�s your property for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allo��-access on }�our property to complete the project construction. After the sewer is <br /> installed, the eYact pipe location��ill be sur��ey�ed and a legal description developed for an <br /> easement document_ <br /> PaQe 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />