My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1245 Sixth Ave N - 26-118-23-34-0007
>
Correspondence
>
Re: sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:25 PM
Creation date
1/9/2019 2:32:20 PM
Metadata
Fields
Template:
x Address Old
House Number
1245
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1245 6th Avenue North
Document Type
Correspondence
PIN
2611823340007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t _ -1 � S. <br /> 1 Z� � 1� -���, 1��� � <br /> � <br /> � � o <br /> � � � <br /> 0 0 � <br /> ` CITY of ORONO <br /> ,� �����, <br /> � � � <br /> �, r ,:�' .°` ' ti Municipal Offices <br /> 'C� - ' , j'� '..; Gti' <br /> � ' � , Street Address: Mailing kddress: <br /> 9�'EggO�' ' 2750 Kelley Parkway P.O. Box 66 <br /> , _- _____, <br /> --— Orono, MN 55356 <br /> Crystal Bay, MN 55323-0066 <br /> 1�larch li, 2003 <br /> Dear Nei�hborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Long Lake East neighborhood. This project consists of <br /> directional boring a pressure se�ver line north of the existing houses, and the provision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to your property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There may also be minimal <br /> disturbance in the areas where the contractor sets up the directional boring machine. All <br /> disturbed areas will bz restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the se�i-er is not required, but the system will be available for future hookup upon <br /> payment of a connection fee. �I'he current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Servicz Availability Ch�rge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> sewer capacity that is included in the metropolitan interceptor sewers and �vastewater treatment <br /> plants for fi.rture se«-er connections. This is a pressure sewer system, and each property owner is <br /> required to install, operate, and maintain their own private residential grinder pump station. <br /> The City will need to acquire a 20-foot��zde permanent sewer easement acro�s your property for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allo��-access on }�our property to complete the project construction. After the sewer is <br /> installed, the eYact pipe location��ill be sur��ey�ed and a legal description developed for an <br /> easement document_ <br /> PaQe 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.