My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00152 - plumbing
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0725 Sixth Ave N - 26-118-23-44-0006 Spring Hill Golf
>
Permits/Inspections
>
2010-00152 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:10 PM
Creation date
1/9/2019 11:20:20 AM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
725 6th Avenue North
Document Type
Permits/Inspections
PIN
2611823440006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ! � <br /> CITY OF ORONO PERMIT NO.: 2010-00152 <br /> 2750 KELLEY PARKWAY <br /> ORONO, MN 55356- �ATE�ssuE�: 03/17/2010 <br /> 952 249-4600 FAX: 952 249-4616 <br /> ADDRESS : 725 SIXTH AVE N <br /> PIN : 25-118-23-33-0004 <br /> LEGAL DESC : iJNPLATTED 25 118 23 <br /> : LOT 000 BLOCK 000 <br /> PERMIT TYPE : PLUMBING(>$500) <br /> PROPERTY TYPE : COMMERCIAL-BUSINESS <br /> CONSTRUCTION TYPE : FIXTURES-MULTIPLE <br /> NOTE: (2)WATER}IEATERS <br /> VALUATION OF PLUMBING 15000 <br /> APPLICANT PLUMBING FIXTURE FEE 187.50 <br /> LEVAHN BROTHERS STATE SURCHARGE PLBG (VALUATION) 7.50 <br /> 12700 BASS LAKE ROAD TOTAL 195.00 <br /> MAPLE GROVE,MN 55359- <br /> (612)551-8990 <br /> Minnesota State License#: 003188PM <br /> OWNER <br /> Spring Hill Golf Club <br /> 725 SIXTH AVE N <br /> WAYZATA, MN 55391- <br /> AGREEMENT AND SWORN STATEMENT <br /> The work for which this permit is issued shall be performed according to <br /> the approved plans and specifications,applicable City approvals,and the <br /> State Buiiding Code. This permit is for only the work described and does <br /> not grant permission for additional or related work which requires separate <br /> permits. All provisions of laws and ordinances governing this type of work <br /> shail be compied with whether or no[specified herein.This permit will <br /> expire and become null and void if construction authorized is not <br /> commenced within 180 days of the date of issuance,or if construction is <br /> suspended for a period of 180 days at any time after work has commenced. <br /> The applicant is responsible for assuring all required inspections are <br /> requested in confor ance with the State Building Code.This permit may be <br /> rev d at any ti for e cause. � <br /> � .�� � _ � � � �7 /� <br /> pplicant er ' ee Signature Date Iss d By Signature Date <br /> SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.