Laserfiche WebLink
=�o�:���__ <br /> =-� ,,. <br /> ,�%p o``\ <br /> ►I �� �! CITY of OR4Na <br /> '�I�, � �',�'' r •' �;; Municipal Offices <br /> ,,�`;�,, t�;' ti, , <br /> `� '� �' " ,;`� G ', Street Address: Mailing Address: <br /> �;�9�E S�p'4��' 2 7 5 0 Kelle y Parkwa y P.O. Box 66 <br /> ,-� �— � Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address v27.3� S;- l cl� ✓'��c�-1 � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of tlie system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes ' <br /> No Z <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31,2010 <br /> Other ' <br /> Septic Tank(s) mp out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) ancUor lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �,2-�- q� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaninD. <br /> Comments: <br /> r. <br /> / <br /> Inspect��'" �f � Date of Inspection ��� � <br /> Telephone(952)249-4600 � Fax(952)249-461b <br /> www.ci.orono.mn.us <br />