Laserfiche WebLink
� <br /> # � <br /> I <br /> �O� • <br /> O � O <br /> ����_`�;_� C , TY of ORONO <br /> r�1 j���, :;,.°,.- � � Municipal Offices <br /> �� �, a y Gti <br /> Street Addres Mailin� Addrou: <br /> �9jr°�xp 2750 Kelley arkway P.O. Box 66 <br /> Orono, MN 5356 Crystal Bay, MN 55323-0066 <br /> � <br /> Apri128, 1998 <br /> Dear Project Ar�a Residents; <br /> The City of Or�no has scheduled a Neighborho d Informational Meeting to obtain resident <br /> comments on a roposed sanitary sewer project serve the Webber Hills Neighborhood. A <br /> project area ma is included with this notice. This eighborhood Meeting will be held at 7:00 <br /> P.M. Tuesday, ay 19th at the Orono City Co ncil Chambers. <br /> i <br /> � <br /> Introduction � <br /> , I <br /> This area was in�cluded in the recent MUSA expa ion for sanitary sewer installation because of <br /> the smaller lot s�zes and older septic systems with 1 'ted replacement sites available. Installation <br /> of new code co' pliant septic systems will be dif ult on some of the lots in this neighborhood <br /> and system reg cements will result in the loss o numerous trees. Approximately 75% of the <br /> existing septic ystems in this neighborhood are on-conforming with several sy'stems in near <br /> failing conditio . This area is one of ten neighbor ods included in the recent MUSA expansion. <br /> Sewer projects ave already been completed in fou areas with an additional two areas scheduled <br /> for completion 's summer. We are beginning th planning process for possible 1999 projects. <br /> At this time, in rest rates are low providing for ore affordable projects. <br /> Project Assessments and Costs <br /> A feasibility study has been completed with an estimated project cost of $961,000 in 1998 <br /> dollars. This re�ults in a proposed project assess ent of$26,000 per unit payable over a fifteen <br /> year period. Options for prepayment of the asses ment are available. Based on several projects <br /> recently compl�ted, the estimated interest rate is 6 25%. Based on a 15-year assessment at 6.25% <br /> interest, the an�ual assessment payments will be pproximately $2,700. These project costs and <br /> assessment pay+rnents may vary dependent on fu re construction costs and interest rates. <br /> Telephone (612) 473-735'/ � FAX 473-0510 <br /> � <br />