My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-02-2015 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
2010-2019
>
2015
>
03-02-2015 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2018 3:28:58 PM
Creation date
9/19/2018 3:28:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PARK COMMISSION MEETING <br />Monday, March 2, 2015 <br />7:00 o'clock p.m. <br />ROLL CALL <br />The Orono Park Commission met on the above-mentioned date with the following members present: <br />Chair Rick Meyer, Commissioners Jan Berg, Brenda Johnson, Bryce Johnson, Paul Pesek, and Julie <br />Ruegemer. Representing Staff were Public Works Director/City Engineer Adam Edwards and Recorder <br />Jackie Young. Council Member Lizz Levang was present. <br />Chair Meyer called the meeting to order at 7:00 p.m. <br />APPROVAL OF MINUTES <br />1. APPROVAL OF JANUARY 5, 2015 PARK CONLMISSION MINUTES <br />Ruegemer requested the minutes be corrected to read Ruegemer rather than Rueggemer. <br />Pesek moved, Berg seconded, to approve the January 5, 2015, Park Commission minutes as <br />corrected. VOTE: Ayes 6, Nays 0. <br />2. APPROVAL OF FEBRUARY 20, 2015 PARK COMMISSION WORK SESSION <br />MINUTES <br />Brenda Johnson stated on Attachment 4 under the brainstorming category, three of the Park <br />Commissioners had mentioned specific links from neighbors to trails was a priority but it is not included <br />in that attachment. Johnson indicated she would like to have that included. <br />Meyer stated it would likely be covered under Item No. 11, which includes sidewalks from <br />neighborhoods to Orono trails or other connectors. <br />Berg stated she could add another number and specifically list it under No. 12. <br />Brenda Johnson stated the Park Commission was not talking specifically about sidewalks but links or <br />connections between trails. <br />Meyer noted the Park Commission talked about continuing the connection between Orono Orchard Road <br />and the Luce Line and that the City has talked about continuing the connection along County Road 19. <br />Meyer suggested the language "continued support for trail connections" be added at Item No. 9 under the <br />2015 final priorities and assignments list. <br />Berg indicated she will also create Item No. 12 to specifically list that. <br />Brenda Johnson moved, Berg seconded, to approve the February 20, 2015, Park Commission work <br />session minutes as submitted, with Attachment No. 4 being amended to include under 2015 Final <br />Priorities and Assignments the Ianguage "continued support for trail connections" as well as under <br />No. 12 under Brainstorming. VOTE: Ayes 6, Nays 0. <br />CHAIRMAN'S REPORT <br />3. REVIEW OF PARK ASSIGNMENTS <br />Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.