Laserfiche WebLink
r <br /> CITY OF ORONO i <br /> �'�""'� 275�0 KELLEY PARKWAY * � 0 1 3 — P1 0 B 5 8 * ; <br /> DA .. SUED: 09/27/2013 � <br /> ORONO,MN 55356- � � <br /> �� � <br /> (952 249-4600 FAX: (952)249-4616 � I <br /> )DRESS : 2325 GLENDALE COVE LA I <br /> � : 34-118-23-33-0065 ; <br /> :GAL DESC : GLENDALE COVE i <br /> : LOT 006 BLOCK 001 ; ; <br /> ;RMIT TYPE : NEW STRUCTURE <br /> :OPERTY TYPE : RESIDENTIAL <br /> )NSTRUCTION TYPE : SINGLE FAMILY <br /> ;TIVITY : 101-SINGLE FAMILY HOUSES,DETACHED � <br /> ►LUATION : $ 373,951.69 � <br /> �TE: SEPARATE PERMITS REQUIRED:PLUMBING, MECHANICAL,FIREPLACE,WATER CONNECTION,SEWER CONNECTION, � � <br /> WN IRRIGATION,ELECTRICAL(STATE) j i <br /> � ; <br /> �TE: PRIOR TO THE START OF FRAMING, AN AS-BUIL��'f�d'NDATION SURVEY MUST BE SUBMITTED AND APPROVED BY CITY } I <br /> A STOP WORK ORDER WILL BE ISSUED. INITIAL: 6�—� � <br /> TE: AN APPROVED AS BUILT SURVEY IS REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL: v" "—' ' <br /> I <br /> TE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT � , <br /> E TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED ; I <br /> �N RECFi$T OF A$10,000 ESCROW TO ENSURE COMPLETION OF TI�AS-BUILT SURVEY AND ALL SITE IMPROVEMENTS. <br /> TIAL:���— i <br /> � <br /> i , <br /> i <br /> I <br /> i � <br /> F <br /> APPLICANT � <br /> PERMIT FEE SCHEDITLE 2,700.75 � <br /> NYEA HOMES PLAN REVIEW 483.60 <br /> 2 OLSON MEMORIAL HIGHWAY � <br /> LDEN VALLEY,MN 55427- STATE SURCHARGE(VALUATION) 186.98 � <br /> 2)741-9069 S.A.C. 2,435.00 � <br /> mesota State License#:2459 TOTAL 5,806.33 <br /> OWNER <br /> ryea Homes ;; <br /> 2 OLSON MEMORIAL HWY � ' <br /> LDEN VALLEY,MN 55422- � <br /> 3 <br /> AGREEMENT AND SWORN STATEMENT <br /> work for which this permit is issued shall be performed according to � <br /> approved plans and specifications,applicable City approvals,and the <br /> e Building Code. This permit is for only the work described and does <br /> grant permission for additional or related work which requires separate i <br /> niu. All provisions of laws and ordinances goveming this type of work <br /> I be compied with whether or not specified herein.This permit will � <br /> ire and become null and void if construction authorized is not ' <br /> �menced within 180 days of the date of issuance,or if construction is <br /> �ended for a period of 180 days at any time after work has commenced. � <br /> applicant is responsible for assuring all required inspections are j <br /> �ested in conformance with the State Building Code.This permit may be j <br /> �k�d at y time for due cause. � ; <br /> �b i ��-� �� i <br /> ermitee Signature Date Issue y Signature Date � <br /> SEPARATE PERMITS'REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. <br />