Laserfiche WebLink
TASK # 53712 Date Called in 05/24/2021 <br />Date Scheduled 05/27/2021 @ 10:0 AM <br />It j City Of Orono <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br />Inspector Information <br />System <br />Name: <br />/ 2$cev' <br />Fail <br />Company/ Organization <br />���� <br />License number: <br />Phone: <br />Email: <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />Inspection <br />System <br />Standard <br />Pass <br />Fail <br />Roof Drains <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />`l <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />�( <br />redirect the roof drains onto the ground outside the building. <br />Foundation <br />Foundation drains are underground pipes that collect storm water from <br />Drains <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building. Foundation drains should not be connected <br />to the sanitary sewer. <br />Sump Pumps <br />Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />y <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />/ <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service <br />Line <br />Sanitary Sewer Inflow & Infiltration (i/i) Compliance Inspection Sanitary <br />Sewer Lines, All sanitary sewer lines serving Property, fi•om the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. (Details on back of this sheet <br />Notes: <br />Toilet Removed <br />Yes o No <br />For Inspection: <br />Inspectors Signature: Date: ` 6" <br />Owners Signature: Date: <br />City Review <br />Compliant ❑ Corrective Action Required <br />Certificate of Compliance Expires: S—allo-z0bi Corrective Action Due by: <br />Date: <br />a.o a k <br />I Signature: <br />Name: <br />j <br />