HomeMy WebLinkAboutTemp COO TEMI�"ORARY CERTIFICATE OF OCCUPANCY
City of Orono
Buildin� and Zonin�Department
DATE APPROVED: 5/20/2004
SITE ADDRESS 2800 Pheasant Rd. P I D. 21 1 1 723320004
OWNER James Echtenkamp BUILDER Robert Fitch Const.
MAILIN�ADDRESS 120 Birch Bluff Rd. BUILDINGPERMIT:
NO. P05975 DATE ISSUED 02/10/03
THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING.THESE MUST BE CORRECTED OR
COMPLETED AND REINSPECTED WITHIN 73 DAYS OR THIS CERTIFICATE WILL BE VOID.
Failure to correct these deficiencies will cause occupancy violation citiations to be issued.
By August 1, 2004
1. Complete Exterior Grading
2. Complete Walks and Driveway
3. Verify Hardcover
I hereby agree to make the above corrections and to call for reinspection within the time allowed:
Owner/Contractor Date
START BILLING FOR: City Sewer
�City Water
Buildin Official
Thursday,May 20,2004 White:Owner/Builder Green:Billing Clerk Yellow:File
o�°�o Ci o O�ono
� � �
�
�
�t�x'.Esxo4`�G
2750 Kelley Parkway
P.D. Box 66
Crystal Bay, MN 55323
(952) 249-4600
Fax; (952) 249-4616
FAX TRANSNIISSION COVER SHEET
Date: 5 2D-O�
To: r�i-t ch Co-ns f-ru�t� o�-��
F�: 7� 3 - 559 -.5803
Re: Te� C�c-/'1Li{� of �CGU�G+-� 280o f'�rea�s� /�
Sender: 8`'uCe V��
YOUSHOULD RECEIVE Z' PAGE(S), INCLUDING THIS COVER SHEET.
IF YOU DO NOT RECENE ALL THE PAGES,
PLEASE CALL (952) 249-4600.
P/�as e S� � �o c� �'�c �"
�` ��''�
�kzClc � �cs @ �S2 - 25�9- 5����
.� ; i ��
'' � <� � 11 �f ..k ji i � .
. �. . .l , 1 ! � ��� ':� :��. V .� .� .,. (4'1 �.7
y�,�