Loading...
HomeMy WebLinkAbout2012-01206 - new structure 1 '� CITY OF ORONO 2750 KELLEY PARKWAY * 2 0 1 2 - 0 1 2 0 6 * DATE ISSUED: OU10/2013 ORONO,MN 55356- (952)249-4600 FAX: (952)249-4616 ADDRESS : 2789 PHEASANT RD PIN : 21-117-23-32-0005 LEGAL DESC' : REG.LAND SURVEY NO. 0310 : LOT 000 BLOCK OUO PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SINGLE FAMILY ACTIVITY : 101-SINGLE FAMILY HOUSES,DETACHED VALUATION : $ 1,500,000.00 NOTE: SEPARATE PERMITS REQUIRED:PLUMBING, MECHANICAL,SEPTIC,FIREPLACE,WATER CONNECTION,SEWER CONNECTION,LAWN IRRIGATION,ELECTRICAL(STATE) NOTE: A FOUNDATION SURVEY REQUIRED PRIOR TO FRAMING INSPECTION. INITIAL�� NOTE: CITY APPROVAL OF AN AS BUILT SURVEY REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL:� NOTE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT THE TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MA BE ISSUED UPON RE(�F A$]0,000 ESCROW TO ENSURE COMPLETION OF THE AS-BUILT SURVEY AND ALL SITE IMPRO�MENTS. INITIAL: NOTE: BOATHOUSE RESTORATION REQUIRED SEPARATE PERMIT.INITIAL`_,�� r—'��,Q'- , NOTE: EXISTING DETACHED GARAGE&TENNIS COURT MUST BE REMOVED PRIOR TO C.O. INITIAL: v X� / APPLICANT pERMIT FEE SCHEDULE 7,956.75 STONEWOOD,LLC STATE SURCHARGE(VALUATION) 700.00 7407 WAYZATA BLVD MINNEAPOLIS,MN 55426- S.A.C. 0.00 (952)697-5590 TOTAL 8,656.75 Minnesota State License#: 20594315 OWNER TEYNOR,GAIL&JOSEPH 13225 CARDINAL CREEK RD EDEN PRAIRIE,MN 55346- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and beco null and void if construction authorized is not commence hi 180 days of the date of issuance,or if construction is suspen r riod of 180 days at any time after work has commenced. The pl' a 's ponsible for assuring all required inspections are re te co f ance with the State Building Code.This permit may be o ti e for due cause. l � (� � I � � lD � A t Permitee Signature Date Issu By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. ` / • �. —� � �� �.�. � ,. .�.�, � � �_._ �.. City of Orono Building Permit Application for New Structures or Additions Mailing Address: Permit number: �C�/� -�/ O�o ���O,j� PO Box 66 O Crystal Bay, MN 55323-0066 Date received: //- �Ll � u�` Received b +�,a '�{� ' �. , Street Address:' y� ��'� ,�y�.�G��'/ 2750 Kelley Parkway Plan review fee: 1 7� .� «5�,3 ,gESHo�`,// Orono, MN 55356 ao,a -a,��,o� �--_--� Total Fee: Main: 952-249-4600 Fax: 952-249-4616 v��ww_cl_ororc.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (P/ease print) GENERAL INFORMATION: Job Site Address: �� �f �J /`���GS a„ � �R � Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes No If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: S�v�,� w a o.�,� 1. L � State License# � D S9 �3 ! 5 Expiration Date: Phone: - �9 6 office 2 Z cell Mailing Address: �y G✓ � v . Cit : ZIP: ' Z � Contact Person: ,.$� v l Applicant is on ra tor / Homeowner (Circle One) Email and/or Fax: PROPERTYOWNE NFORMATION: ' '����� l 1� � `r\tr3� Name: D� � 1L �a �•l �P ti o F- Phone (day): � - � - /1 Address: /� 2 Z.r C., ,� � rM ,.� (��{�� /Pr.t� City:��l'+h �ra rh�'r ZIP: S,5�3`f,G Email and/or Fax _L� 1"c v..� ; :='f � � ,•�t,�-.;,-� . ti��.� � ARCHITECT/ENGINEER INFORMATION: Name: A/��a., �r.� /�p r:s� Gr�u � Phone (day): �f 7 ? J Address: v ,c�'a t r ,f��. �f Cit : ti 7' t ziP: SS 3 9/ Email and/or Fax: r P PROJECT INFORMATION: 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal 8� Water Supply New Construction �Single Family with �Residence Addition attached garage ❑ Garage/Accessory Bldg. �Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑Storage ❑ Public Water **Any earth movement may require ❑ Commercial ❑Other(specify) MCWD review 8�permits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ � �f � +;� ,,-:�-• �- .� ` STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= �� Number of bedrooms= r ($�Wood/Frame b.Width(ft.)= /D/ Number of garage stalls: ❑ Masonry Areas in square feet Attached= / ❑ Metal ❑ Pole Bldg. c. Basement= ��0 Detached = ❑ ICF d. 15f Story = �7 � � ❑ On-site Prefab e.2"d StOry= S�l�1 ❑ Off-site Prefab f. '/z Story = ❑Other(piease specify): g.Total Area= �L REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed A licable ❑ Permit A lication ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ Surve meetin all re uirements ❑ Stormwater Pollution Prevention Plan ❑ Hardcover Calculation s ❑ Se tic S stem Site Evaluation Re ort ❑ Access Permit ❑ Wetland Buffer Im rovement Plan ❑ � En ineered Plans for Retainin Walls 4 feet or above �ZJ ❑ Plan Review Fee ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; . Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; . Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refyse to supply the information,the application may not be issued. . Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. 'i : ApplicanYs Signature. Date: � �'Z�'�Z Owner's Signature: Date: , , , � �J O�v H o� �a. Address: � � � / / � N�' S � h- � �o � � Date: I/ 20/ 2 Prepared by: � h � HARDCOVER CALCULATION WORKSHEET SETBACK ZONE: (CIRCLE ONE) 0-75' � 75-250' �250-500' S00-1000' EXISTING HARDCOVER IN ZONE _� A. House x ��}OO S.F. Length Width x = S.F. x = S.F. B. Garage x = � �{ S� S.F. C. Driveway x = �/ 5`a S.F. x - �,fD S`D S.F. D. Sidewalk x =� /SST� S.F. x = S.F. E. Patio/Deck x = S.F. x = S.F. F. Weed control x = S.F. weed barrier x = S.F. of any kind x = S.F. G. Retaining Walls x = S.F. H.Other / �ti:s ,.. x =� L f>O b S.F. TOTAL HARDCOVER IN ZONE - �'S dd S.F. A TOTAL PROPERTY AREA IN ZONE - /d SOb S.F. B A 17 SCJU + g 2� Op 0 x 100 = % PROPOSED HARDCOVER IN ZONE (including existing hardcover to be retained) A. House x = � 4 G � S.F. Length Width x = S.F. x = S.F. B. Garage x = S.F. C. Driveway x = S� pd S.F. x = ' S.F. D. Sidewalk x = Z.U G S.F. x = S.F. E. Patio/Deck x = (e /O S.F. x = S.F. F. Weed control x = S.F. weed barrier x = S.F. of any kind x = S.F. G. Retaining Walls x = � ,3 D S.F. H.Other /��jG�I I'�mWS ! - /_-j`�.'�� x = /�/p S.F. TOTAL HARDCOVER IN ZONE - Co 2 3 S' S.F. A TOTAL PROPERTY AREA IN ZONE - �t 2 �8 S.F. B A �,s-r�n = B _2, 1 0 0 o x 100 = 2;� . 1 % - 13- � � � / ) � � 'Vt. `�6 G S'�`� 1 f 1' � � �U O .I C i �as , � i ;" �' ,- ,�. . � , ��- , ,..__ �, ��// � ..__.............� Q yf� � �.�� 5!G7!'1C f 11MD7 0 a9 Q i � ' � ryi �,�"�„��8 -...�. ,r' _.. �,,�0• ' , / ��_� __._ ,�� BI URN',1 �.1 : r.? _ • _ti,.. —.��,.� _, __ ��� V,�.,�. % '+d�' 1� ��� -_ -__.�,fq' V.t,�a -� �.. Yt.a'P,, � BENCHMARK i �,� � '-- i , ,v u-• � � ., �,� TR SAN FH � }�Y.- ,�� �. v��{�y �,`r 'Q ELEV = 945.3 ' I �I . i i' q�� �` 1U�\�O � �� ��}� i��1� I (� I � u� � � '�l � I � � I , • nll ' I ��, � I� i (� � �r' , 5 q. ', I / � f r i:<" ! � ��`�� i �� � � `� � " , i I1 ' � � � I � A i I ; �,� I "�� `,;� ` ' I \,o°', ,� y �i ,�%' i i ; i r � �� � � �v" o I! � �I I ,'� ' ii �g ��, // �%� ,.\, •. � ; i ' � � i . �� / 'm � I+ i � �p, I •,"'' /', . .3 i; ��qry 1 d � I ..._�.. ....._..._..,�h���^ . . N . � I �I � � I� 4 r� _ � 1b��' ' / , � � I ..( ;' ��... \ � �` '..�w��.0�•� O. I ��,� }� i ��' i__ � �N .p'-�'�4..� �1 f J' � `'�'� � I : .:_:. '-"--! { ' PROPO�D£LEVAT/ONS \ •....I!� i'' ..._.....�rH��•. 'V � f ' ` �� . i ° I I,.. �' ,!' .,�r,o CARAGf FLOOR= 950.9 � �'� . �M TOP OF FO[lNDAT/ON= 95/.2 �� ��4' � �" ?� ;;''��V NAROCOV£R MAAIO�LOOR= 951.69 \ �� �+�a° �\ �9 y, . , i LOWfST FCOOR=941.0 � � I�G:"*'-,�.� ��� i�� j` PROPOSE� \ � f--—.:,� sso sei-._ ..1'�' ....�`��•..,` i, 3�` HOus£= 4os 1 .Sf \ I �.. '� •,s ' � D£QK = 6l0 SF \ � , o��;�� �� � FPOR= 1B5 SF k, .�ze.o , ? �;* avv£=s.aoo sF "�' � (., a�2 � r i_ °" WALKS=200 SF I � ,� -•Pt o�,�" k'� ,�6�,� / RTWLS= 130 SF �� I �' � p o � BOATHO. = 140 SF � `\/ I � ,p y��2O�, __ h� ,i � TOTAL = )0626 SF"/23.lx t � W �� 5 ' ,��- e�.s sf Nc rr£�sa�c ��\ � � i ..N __. .,.' �t ,i � � I �• I ' ; ' ' • s` _'.. ����\ ^i .^' 7"{ � � I. \ ' � ,' I Z .. � . �• O l.yl- � .__. _... '� h �v \'�,iU : � �._..._�._._... . � ��......�.� ' � �A' 26�lN .i�--�.X.._._.s'�::�_. .�6.fi % /�p. I ^4 ' 'C'950.0�'FF..9?'1.0� 1 i \....... � M f.�tY:�;' �'Qr `�,d Lr�'s!C'�,rrJ:_ !'a�5i!:.G ��� i 1 .._... �aUU`.:i: ...._1 I� • . I r -�� �_-•oi_..{J 4 � .3+' T \� >°. ^_J 7 � .� ' ��i s � �°.r , \ / o '� ; �.°� � '_._;..J °"��:�(�t,•e � � � �-— -_�".J_� 6�> ! j , cN�iv � � � � i � '1� .��i&y t �.� ��' _'�:r� I � � � .°.a�3 _._ ' _}a��'__....___'__'"_'.__ � �;5. i� �I I I � � : �� m�� " i .°<�' �gl� .t o? � a� °'� �� � \ V�"' y . � (dF)SI�I�C•lY�I.0 U .�.�. :"TW-441.0 j �' � �M �1+ Z�wsr:Ta���� i.is�l ' � BW-939.0 '� i j C���� dio � I �4'��< �1 �'.i w�� �� i "1� � ���' i� ;' + qoz�' _ � ! !� �� �i i "w• i i 1 Emb�'� __ � (� . --_. i ;i _.. !� � i i i-�tr .. , �s . ,. : i o� +- w�.y�w .. i ' � - . ... ,�'� --`��r� �1`��j4'p((- r ... . ` _ � Z '_ '_ ' � A+ ; /]}, .... �, ._ ��`��A ��hi� ,,i.. - . r. � — -r . \ ` � ... .._. ..: � ... .._.�. _- __ _ "— : -�.. �_ __a�.,.,� =__�.__:''_ _.._- -- j O� ..�95HORELNE�929.OHW 89 9.4"� V � W O �O LEGAL DESCR�TION: Z � j� LAKE MINNETONKA� TRACT A, R.LS. NO 310. 4� ��1 HENNEPM! CO.. AkJ. m� �O ADORESS - 2789 PHEASANT ROAD �ll~ PDy27-117-23-32-0005- �(� LOT AREA = 46000 SF/ 1.05 AC 0 30 60 90 X 257G = 11500 SF HC ALLOWEO k SCALE IN FEET pF'' � EXlSTBJG SPOT FI.EVATION. � ��`�< X(998.0�PR�OSED �OT ELEVATI�7 yERIF'y q�L DIMENSIONS AND �N F s � � ..� =DREC710N SURFACE DRAINAGE ELEVATIONS WITH HOUSE PLANS �i mo� �� COH � CANTILEVERED OVERHANG ; N a � OHL =OVERI#AO UT�ITY LNJE N �a GFE =GARAGE FLOOR ELEVATION w Q � �;� TFE = TOP OF FOIRdpAT10N ELEVATbN ` � � LFE a LOWEST FLOOR ELEVATION � ��' �s � / r �� n , '49�v 9�'6. . / �� \ / h�/' ��9s,6•',��.Md`.' S�/ME/ �Y7q e� ` .�...—_".�$� b O . 9'/ � �. _�}a i /y � o�p .' �__".� �L�i .uA" BITUMNOUS . _'..�E � �l , " �_' _�ry_ _�� p�� i��a/ ,+��1�'I� - - --- - i'Y' ( +� °' \ " �'�'o I�1� /•�'' f �I. '� ' ,_� N oxe�re•r roR3i— '� '�'' � Z .�'� � ' � �� 1b ,����y`\1 �o�� �0�&, ;;���9� �I I(Q� � 6 / Iv/ I I ' I e�9 �i I I ,�� I I I y� h - �� ! �' � � �jkfA� f� � �� �ia. I � � �I�� � ' I I � � ' ~ 9�.-,. � ; � � ; i\b,r, � ; y� � � I I *��. i t4'�'�i I '� i�� ' � , . I , i' � W \� � II � I � //.� /� +0b \��.,� { •, + � �� �'�6� i ' ry� �P 1' /i�' i- +a'? ��°' !I I^�� ^�" ti, d'�.° + � N ,. /�� 250+ ` 21000 SF X 30X = 7000 SF HCA ; / �`b, 6�!�qy EXISTING HARDCOVER '�j I P� _ 1 a � , EXIST HC I I � � � GPp " �,d ,� �' bi ,�efl' GARAGE = 450 SF �,__� { ��� ,�+.1„��� ��P TEM�ISCT = 6000 SF ,'� � (' i DRIVE = 4050 SF I} r �. ,�'9 TOTAL � 10500 Sf/50.0 7G � i I I�,p'� +¢'�^ y�'p '� VrQ'P 1, I I 6 � � I p�' � �y�:� q - � \\ / I t �-��iV4��� �' * �\J�4 . zse se� � \ � �//J �� ���� � \ � /: 9� � 00 I �� 4 / �� � e�" m•° Q, �j'�.a'9� °� It / / 75-250 i R �' ` {' ° � 17500 SF X 257G � 4375 SF HCA �, I � \ 9;8.�t i9p EX�ST HC � � / � HOUSE � 2800 SF �� PATIO/WKS = 1550 SF �� � � °� +^'', `�� i DRIVE a 4150 SF , 1 , ,� � ; �-; i � TOTAL = 8500 SP/48.5R \'`.\ g� �� � � Ae i�' ,,,� f ' :' ,� ,,; ) ',a9 � —�..4' _ - �.e o, -�3 �., x x = r••, 4� GFE 95J.G FFE=952A �.`,I �- -� EXISTWG HOUSE EXISTMJG I�� ' EXISTWG HOUSE li ��'�.. FKK15E t �'� � tP a�acu � ' qyy ! ,�} lFE=947.5) �—pe- 1 �q�M1 6 y } ' �.�, f�` S � ��� ��i�' � T f� / ___� .� ��n6J:a��i � ,: I � � dy a°' /' l�—_ i i gy � / ,p.� P i J�7j _I +°�' ____ ' sgO+s'° ' � �' ' ; 0-75 �+� �- a� +"' �— 7500SF X 0 $ �'� �_ �� �� � !� n: � � ___.i i �\ � EXIST HC °�"vi _ y+ �� _g32._- � BOATFIO� 130 SF J a" '; J,! /�' . o i' I! i ���0 _ "� I 1 y If ` ` . . I ��+ � ���a _ % ;?O1 � ! .9*9' +� -I ' _'� �\;\.. ��.._ �8� _ i .. ` .� . 9 M77 E pq� '}' _ '""J. � �"„ � . �b' � '�.��___'_ . ... \��..,�. , �_, �9- ' . . . / \ c� %.. �'.0 5�`'_ � . (^ �{�{,p4�'yy �-. T 1'A_"'�{ I .t_._ '_- . � I.,(\` __ —__ _ —_ =_' �' r_r_r _ '___— W Z� . .�yM` lME.929.OHWB9 9.4� �l � JOO rj L AKE MINNETONKA ���� LEGAL DESCRIPTION: ' O TRACT A, R.L.S.NO 310, `� O HENNEPIN CO.. MN. ADDRESS - 2789 PHEASANT ROAD m W�O PID�21-117-23-32-0005 � �� LOi AREA = 46000 SF/ 1.05 AC 0 20 40 60 X 25X = 11500 SF HC ALLOWED � SCALE W FEET SURVEY IS SUBJECT TO CHANGE PER �¢g� � � EXISTINC SPOT ELEVA7�L TITLE OR EASEMENT II�ORMATION �a�� X(998.0} PROPOSED SPOT ELEVATION �b � = DIRECTION SURFACE DRAMAGE VERIFY ALL DIt�NSIONS AND � � 4 EIEVATIONS WITH HOUSE PLANS $E� y� COH = CANT�EVEf�O OVERHANC � �{S}n OHL � OVERI�AD UT�.ITY LII� VERIFY ALL SETBACKS WiTH CITY p GFE � GARAGE FL�R ELEVATION � r !� TFE � TOP OF fOIIJDATION EI.EVATION � 6i'� r lFE � LOWEST FLOOR ELEVATION �Y� DATA PRIVACY ADVISORY In accordance with Minnesota State Statute 13.04 Rights of Subjects of Data, Subd. 2, "Tennessen warning", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under Minnesota State Statute 13.04 (see following page) to review private data on yourself. 6. Your full name is required to process this application or permit. SV�-t r � V Gr �a j�'�.�d First Middle Last � `t" � � C`'J 4, h R ✓ �i f���"d', Address �.r �h �s y 2.. � �'�Z- ��7� s.3'�o City State Zip Phone I under d ights as stated above. � i Packet Last Updated: 03-06-2012 - 19- Sec.13.04 RIGHTS OF SUBJECTS OF DATA Subdivision 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd. 2. Tennessen warning. An individual asked to supply private or confidential data concerning the individual shall be informed of: (a) the purpose and intended use of the requested data within the collecting government entity (b) whether he may refuse or is legally required to supply the requested data; (c) any known consequence arising from his supplying or refusing to supply private or confidential data; and (d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data, pursuant to section 13.82, subdivision 7,to a law enforcement officer. Subd. 3. Access to data by individual. Upon request to a responsible authority or designee, an individual shall be informed whether the individual is the subject of stored data on individuals, and whether it is classified as public, private or confidential. Upon further request, an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge and, if desired, shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning, the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority or designee shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority or designee may require the requesting person to pay the actual costs of making and certifying the copies. The responsible authority or designee shall comply immediately, if possible, with any request made pursuant to this subdivision, or within ten days of the date of the request, excluding Saturdays, Sundays and legal holidays, if immediate compliance is not possible. Subd. 4. Procedure when data is not accurate or complete. (a) An individual subject of the data may contest the accuracy or completeness of public or private data. To exercise this right, an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (1) correct the data found to be inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data, including recipients named by the individual; or (2) notify the individual that the authority believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the Administrative Procedure Act relating to contested cases. Upon receipt of an appeal by an individual, the commissioner shall, before issuing the order and notice of the contested case hearing required by chapter 14, try to resolve the dispute through education, conference, conciliation, or persuasion. If the parties consent, the commissioner may refer to the matter to medication. Following these efforts, the commissioner shall dismiss the appeal or issue the order and notice of hearing. (b)Data on individuals that have been successfully challenged by an individual must be completed, corrected, or destroyed by a government entity without regard to the requirements of section 138.17. After completing, correcting, or destroying successfully challenged data, a government entity may retain a copy of the commissioner of administration's order issued under chapter 14 or, if no order were issued, a summary of the dispute between the parties that does not contain any particulars of the successfully challenged data. Packet Last Updated: 03-06-2012 -20- PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address/Permit Number: ��O"� �V�t��� � � he�/ISI � � Z��Z "' ���� Description of work: `'���`����� ��� , ��� � Septic review by: Date Approved: Zoning review by: Date Approved: " ` Building review by: • Date Approved: �--' �'� Grading review by: Date Approved: Zoning District: Zoning File#: Reso#; Reso Date: Zoning: Lot Area: SF/AC Width: Lot Coverage: SF _% Survey Submitted: ,O�Yes 0 No Date of Survey: �• � '�3 Revised date(?): Proposed Setbacks: Front(Lake) Rear(Street) ( N S �E W ) ( N S E �) Other Buildings Wetland Side Side ,"l ' 1 I ' Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet) = 50% _ #of Stories Ok? � YES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: The distance between the lowest FOR A BUILDING ON A SLAB FOUNDATION: START WITH proposed floor(of the basement or crawl space)and the highest point of the roof. START WITH The distance between the top of slab and If you have a... the highest point of the roof. If you have a... • GABLE OR HIPPED ROOF(no . GABLE OR HIPPED ROOF(no windows): Subtract half the windows): Subtract half the distance distance between the highest point between the highest point of the roof of the roof to the low point of the to the low point of the corresponding SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof (BASED ON ROOF . GABLE OR HIPPED ROOF(with (BASED ON • GABLE OR HIPPED ROOF(with TYPE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance distance between the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof • ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. mansard,etc:No subtraction. ADDITION Add the distance between the top of slab SUBTRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to (BASED ON EXISTING basemenUcrawl space floor and the EXISTING the foundation. GRADES) highest existing grade adjacent to the GRADES foundation OR 10 feet(whichever is less). EQUALS Defined building height EQUALS Defined building height Shoreland District MCWD Permit Received Avera e Lakeshore Setback Met? Bluff � Yes 0 No � N/A 0 Yes �No �Yes 0 No �Yes 0 No � N/A Permit Number: Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overla District Tier Hardcover Hardcover 0 Yes No 0 Yes No 1 2,3•�� Type(s): Type(s): Updated: January 2013 v:\forms\plan review checklist 2013.docx " REMARKS (in-house): � Fees to be Charged YES NO Permit Plan Review State Surcharge Investigation Fee SAC—Number of SAC Units Other (specify) Square Foota e $ per Square Foota e Basement X = $ 15t Floor X = $ 2nd FIooI' X = $ Garage X = $ Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate Permits Required State Permits � Site 0 Plumbing 0 Grading/ Filling 0 Well 0 Hardcover Removal � Mechanical � Fire � Electrical � Footing 0 Septic � Water Connection � Poured Wall � Fireplace � Sewer Connection 0 Foundation Survey � Masonry 0 Lawn Irrigation 0 Radon Rock Bed 0 Mfg. � Framing � Other(specify) 0 Insulation 0 As-Built Survey 0 Final 0 Wetland Buffer � Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access: Existing: 0 YES � NO New: � YES 0 NO OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED Updated: January 2013 v:\forms\plan review checklist 2013.docx Christine Mattson From: Christine Mattson Sent: Friday, February 01, 2013 11:34 AM To: 'Gustafson, Sven' Cc: Melanie Curtis; Lyle Oman Subject: 2789 Pheasant Road Attachments: Building Permit Application Packet for New Structures or Additions 2013.pdf Sven The city received a new set of house plans and surveys for 2789 Pheasant Road. I understand from your conversation with Lyle that a different porch is being proposed from the one that was approved with permit #2012-01206. The plans submitted also include plans for the replacement of the boat house. The porch changes will be a revision under the original building permit (#2012-01206), however the boat house will require a separate building permit application. Attached is a copy of the building permit application packet. If you have any questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical addressJ PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ �? 952.249.4620 8 952.249.4616 � cmattson@ci.orono.mn.us � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday, February 18, 2013 1 ,' ' � Plan Review Checklist for New Structures / Additions Address/ PID/ Legal: _____ _ `� � `���} � `� ���� S� n "� � �� ��� � � Description of work: �� � , Septic review by: Date Approved: � J'" �� - �� Zoning review by: '� Date Approved: Building review by: Date Approved: � ' '� - ��3 Grading review by: 5�-�- Date Approved: l� �{ "– � 3 Zoning File#: Resolution#: Resolution Date: Zonin District Fire Department Post Office School District Zoning: Lot Area: _SF/AC Width: Depth: Survey Submitted: es ❑ No Date of Survey � `����� Pro osed ack : Front Lake) Rear(Street) ( N S E W ) ( N S E "W Other Buildings Wetland Si Side . , � � ' — Building efined Height: ' Building Peak Height: ���Z- #of Stories Ok?: YES R A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATIO . ��,V TART WITH the distance between the basement floor/crawl START the distance between the slab and the highest space floor and the highest roof peak, the top of WITH roof peak,the top of the cornice of a flat roof, /�.�� the cornice of a flat roof,the deck line of a the deck line of a mansard roof, or the 1��J mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type or other arch-t e roof roof SU R half the distance between the highest window and SUBTRACT half the distance between the highest window �ll hest roof eak of a itched roof --� '-'-�^^^����+f no�4 nf� nitchAri rn�1f SUBTRACT the distance�tw,e�the b�sement floor/crawl ADD st i � space floor /.tl�� ght�st existing grade within I � ' foundation or 1b feet,whichever is less. EQU/ c � � i EQUA ned buildin hei ht /`�� � �� � � �ot Coverage: G�1 �� � SF � ; Shoreland District MCWD Permit Received Avera < 0 Yes ❑ No � N/A �� � � es 0 No � • Permit Number: I"�U ���, -- Hardcover Zones Existin Proposed Va � � �I,t,��`�� � rn� � 0 75' ❑ V�" '�tiG�' ���� 250' Type�s ' �� � � 25 ��� 2 �� 500 1000' EMARKS (in-bouse):��� � . �(�t" ^►� (/ �� � I(��� �� � ° Q � �(� L . ^ �����t��ti �� � ��� I C�f �; l�� ��l'�, Updated: 09/11/2009 z:\forms\plan review checklist.docx , Fees to be Charged YES NO Permit ,�- Plan Review ' State Surcharge ,/ ` Investigation Fee ,�- SAC— Number of SAC Units Sewer Connection � Water Connection � Park Fee � � Site Inspection � Other(specify) � Miscellaneous Fees � ' Calculated By: Square Foota e $ per Square Foota e Basement X = $ 1St Floor X = $ 2nd FIOOr X = $ Garage X = $ Estimated Construction Value: $ 1�500,000 °O Orono Inspections Required Work Requiring Separate Permits Required State Permits � Site ,�Plumbing ❑ Grading / Filling � Well 0 Hardcover Removal �Mechanical � Fire �Electrical ,�'Footing 0 Septic �'Water Connection ,�Poured Wall ,�Fireplace �d'Sewer Connection �Foundation Survey � Masonry ,0'Lawn Irrigation �Radon Rock Bed .0�Mfg. ,� Framing � Other(specify) � Insulation ,�As-Built Survey ,�Final 0 Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: 0 YES 0 NO New: ❑ YES � NO REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) T�1 1"�%lX,c�ll�1�LS�' Y�S1�j'y2l��I�?� ���GGI!-�' ���l�lt-���'h'�!� (� ��lC!S�f1/-�G�el�tC�2o el�j�%IZ�G,�-c �{�F�/t�S'C�].L r,F- ����iLt Gi1�% l�' y��tt�c�v�r�l p�i J►� fO �';C� Updated: 09/11/2009 z:\forms\plan review checklist.docx Melanie Curtis From: Kathryn Alexander[kathryn@alexanderdesigngroup.com] Sent: Friday, December 28, 2012 10:02 AM To: Melanie Curtis; Sven Gustafson Subject: Re: Teynor- Revised Perimeter Diagrams- 12/27/2012 Yes.That is correct. Kathryn Alexander Alexander Design Group, Inc. 401 Lake Street East Wayzata, MN 55391 Phone: 952-473-8777 Email: kathryn@alexanderdesi�n�roup.com www.alexanderdesi�n�rou p.com From: Melanie Curtis<MCurtis@ci.orono.mn.us> Date: Fri, 28 Dec 2012 09:33:39-0600 To: Kathryn Alexander<kathryn@alexanderdesi�n�roup.com>, Sven Gustafson <sven@stonewood.com> Subject: RE:Teynor- Revised Perimeter Diagrams- 12/27/2012 Kathy -Am I to understand from this that the basement floor elevation remains at 943'and the of foundation elevation will be dropped to allow for a first floor elevation of 953.6'? If so, it appears yo ill ma e the��basement" definition and the survey should be revised. Please have your surveyor identify the existin 947' ntour so this is clear on the survey. Thanks. Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us From: kathryn@alexanderdesigngroup.com [mailto:kathryn@alexanderdesign4roup.com] Sent: Thursday, December 27, 2012 4:49 PM To: Melanie Curtis; Sven Gustafson Subject: Fwd: Teynor - Revised Perimeter Diagrams - 12/27/2012 Melanie Main floor elev. is 953.69 See attached.This should clarify how we measured it. I had my cad person draw it on the basement perimeter and on our elevations. Let me know if this is ok. Kathy Sent from my iPad Begin forwarded message: From: "Alexander Design Group" <alexncorp@AOL.com> Date: December 27, 2012, 2:41:04 PM PST To: "Kathryn Alexander" <kathryn@alexanderdesi�n�roup.com> Subject:Teynor-Revised Perimeter Diagrams-12/27/2012 1 Kathy, The calculations look to be good, if my interpretation is correct. I get a Total Perimeter of: 383'-5" (divided by 2 = 191'-8 1Z2" allowable exposed lower level) The Perimeter below grade above 6' main floor offset is: 237'-2" (146'-3" exposed lower level) Approx: 45'-5 1Z2" linear feet over 50% minimum. See attached diagrams. Alexander Design Group, Inc. 401 East Lake Street Wayzata, MN 55391 (952) 473-8777 www.AlexanderDesi�nGroup.com z i� � i i� � Melanie Curtis From: kathryn@alexanderdesigngroup.com Sent: Thursday, December 27, 2012 4:49 PM To: Melanie Curtis; Sven Gustafson Subject: Fwd: Teynor- Revised Perimeter Diagrams- 12/27/2012 Attachments: Teynor_Perimeter-Diagrams_2012.12.27.pdf; ATT00001.htm Melanie Main floor elev. is 953.69 See attached.This should clarify how we measured it. I had my cad person draw it on the basement perimeter and on our elevations. Let me know if this is ok. Kathy Sent from my iPad Begin forwarded message: From: "Alexander Design Group" <alexncorp@AOL.com> Date: December 27, 2012, 2:41:04 PM PST To: "Kathryn Alexander" <kathryn@alexanderdesi�n�roup.com> Subject:Teynor-Revised Perimeter Diagrams-12/27/2012 Kathy, The calculations look to be good, if my interpretation is correct. I get a Total Perimeter of: 383'-5" (divided by 2 = 191'-8%:" allowable exposed lower level) The Perimeter below grade above 6' main floor offset is: 237'-2" (146'-3" exposed lower level) Approx:45'-S%" linear feet over 50% minimum. See attached diagrams. Alexander Design Group, Inc. 401 East Lake Street Wayzata, MN 55391 (952) 473-8777 www.AlexanderDesi�nGroup.com i Melanie Curtis From: Melanie Curtis Sent: Thursday, December 27, 2012 10:54 AM To: 'Gustafson, Sven'; kathryn@alexanderdesigngroup.com Subject: RE: 20121210 2789 Pheasant Rd -2012-01206 Kathy It appears this will be a three story house as the lowest level appears to be a defined'�story"and not a"basement". Without a First Floor Elevation shown on the survey I used the TFE and added 2'for trusses— if this is not correct please provide first floor elevation. This results in the 949.2'contour being used for the basement determination (6' is subtracted from the first floor elevation...). The lowest floor is therefore not a basement. If your intent was for the upper level to meet the half-story definition I will need more detail —cross sections, wall heights, etc. The half-story definition is below. Thanks - Melanie Basement means that portion of a building that is partly or completely below the existing ground level. A basement shall be considered as a story for purposes of determining the number of stories in a building, when the finished surFace of the floor above the basement is more than six feet above the existing ground level for more than 50 percent of the basement's perimeter. The perimeter of the basement does not include portions of the house or garage that do not have a lower level but are merely "unexcavated". Artificially raising the grade adjacent to the foundation of a structure (by filling or by a combination of filling and retaining walls) above the surrounding natural terrain shall not be allowed as a method for converting a defined story to a defined basement, regardless of any other benefits to the property of such action. Finished grade that increases more than one foot from existing ground level shall be considered as artificially raising the grade. However, artificially raising the grade when such action merely restores a previously excavated site to its original natural grade may used as a method for converting a defined story to a defined basement. Building height means the vertical distance between the highest adjoining ground level at the building or ten feet above the lowest ground level, whichever is lower, and the top of the cornice of a flat roof, or the deck line of a mansard roof, or the uppermost point on a round or other arch-type roof, or the median height of the highest gable of a pitched or hipped roof. Topographic changes which elevate the adjoining ground level above the existing terrain shall not be considered in determining building height. For a pitched or hipped roof situation, regardless whether the highest living space in a building is a half-story or full story, if the highest living space contains windows (excluding skylights) the upper measur ing point for defining building height shall be the median height of the top of the highest window and the highest peak of the roof. Story means that portion of a building included between the upper surface of a floor and the upper surface of the floor or roof next above. It is measured as the vertical distance from top to top of two successive tiers of beams or finished floor surfaces and, for the topmost story, from the top of the floor finish to the top of the ceiling joists or, where there is not a ceiling, to the top of the roof rafters. A story that meets the definition of a "basement" shall be considered as a basement and not as a story for purposes of determining the number of stories in a building. Half story means the uppermost floor of a building in which (i) the intersection of the exterior wall and the roof is not more than three feet above the floor elevation, and (ii) not more than 60 percent of the floor area within the exterior walls of the uppermost floor exceeds five feet in height as measured from the floor to the rafters. Floors exceeding these parameters shall be deemed a full story. Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us 1 Melanie Curtis From: Gustafson, Sven [Sven@stonewood.com] Sent: Tuesday, December 11, 2012 9:39 AM To: Melanie Curtis Cc: kathryn@alexanderdesigngroup.com Subject: Re: 20121210 2789 Pheasant Rd -2012-01206 Melanie- I think the decorative panels is something the client dreamt up. Think vents. But they wanted them to look a bit more like windows,without being windows, as there is nothing behind them. They can simply be called out as vents—feel free to redline them. I do not have a photo, as it's only been a conversation thus far. I'll have the surveyor take a look at the other survey and drainage related items and will get back to you asap. Thanks, Sven J. Sven Gustafson Stonewood,LLC 7407 Wayzata Blvd. Minneapolis, MN 55426 612-267-2670 cell 952-697-5590 office www.Stonewood.com From: Melanie Curtis<MCurtis@ci.orono.mn.us> Date: Mon, 10 Dec 2012 16:02:52 -0600 To:Jeffrey Gustafson<sven@stonewood.com> Cc: "kathryn@alexanderdesi�n�roup.com" <kathryn@alexanderdesi�n�roup.com> Subject: FW: 20121210 2789 Pheasant Rd -2012-01206 Sven Can you or Kathy explain the��backlit decorative panels"as identified on the plans? Are these glass and/or will they appear to be lit windows at night? Also, would you please provide a photograph example of what these would look like at night? Additionally, please see the comments below from our City Engineer. These comments must be addressed by providing the information/clarification requested and/or revised surveys for our permit review to continue. Thank you - Melanie Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us From: Jesse Struve Sent: Monday, December 10, 2012 3:30 PM To: Melanie Curtis � Melanie Curtis From: Melanie Curtis Sent: Monday, December 10, 2012 4:03 PM To: 'Gustafson, Sven' Cc: kathryn@alexanderdesigngroup.com Subject: FW: 20121210 2789 Pheasant Rd -2012-01206 Sven Can you or Kathy explain the'�backlit decorative panels"as identified on the plans? Are these glass and/or will they appear to be lit windows at night? Also, would you please provide a photograph example of what these would look like at night? Additionally, please see the comments below from our City Engineer. These comments must be addressed by providing the information/clarification requested and/or revised surveys for our permit review to continue. Thank you - Melanie Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us From: Jesse Struve Sent: Monday, December 10, 2012 3:30 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20121210 2789 Pheasant Rd - 2012-01206 I have reviewed the building permit for a new residential property at 2789 Pheasant Rd and have the following concerns: • The survey shows a 6" PVC storm pipe extending down the slope ultimately discharging close to the lake. This pipe should daylight at or before the 75' setback.This would not be allowed without a Conditional Use Permit (CUP). • Additional grading needs to be shown on the northeast corner of the house to reflect the drainage being maintained on the existing property. The 948 contour will need to be adjusted and potentially additional survey will be required to show the proposed grading plan can maintain a swale down this property line. • I believe the intent of the drainage on the east side of the property is to drain to the low area south of the house. Has the proposed 6" pipe been designed by a registered professional engineer to make sure it can handle the runoff from a 100yr event(rainfall or snowmelt)without impacting the proposed structure? This will need to be signed off by a registered professional engineer. • The retaining wall on the southwest corner exceeds 4' in height. The applicant will need to submit plans and specifications from a registered professional engineer for the retaining wall. • The silt fence shows it is extending significantly into the 0-75' zone. Will this area be re-seeded or re-sodded? Is it the intent of the applicant to regrade to install sod or seed? If so this should also be included in the earthwork calculations. If the calculation exceeds 10 CY, a CUP will be required. • Are all the easements shown on the survey? Along the north side of the property there is an existing watermain and sanitary sewer, but no easement is shown. This should be included on the survey. 1 MINNEHAHA CREEK ;� WATERSHED DISTRICT QUALITY OF WATER '�'�'- QUALITY OF LIFE The Minnehaha Creek Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, Watershed District is maps, and all other supporting data submitted by the applicant, and made a part committed to a leadership hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek role in protecting, Watershed District. improving and managing the surface waters and Issued to� Joseph & Gail Teynor Permit No: 12-466 affiliated groundwater Location: 2789 Pheasant Road, Orono, MN resources within the purpose� Erosion Control- Sinqle Family Home District,including their Date of Issuance: 12/13/2012 Date of Ex iration: 12/13/2013 relationships to the By Order of the Board of Managers ecosystems of which � they are an ir�tegral part. � �"'�� Brandon Wisner We achieve our mission District Technician through regulation, This permit is not transferable without District approval, and is valid to the date of capital projects, expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the educadon,cooperative permit must be received by the District at least 30 days before expiration. endeavors,and other The applicant is responsible for compliance with all District Rules and for the programs based on action of their representatives, contractors, and employees. sound science, Conditions: Project to be completed as described in plans submitted to the innovative thinking,an MCWD office on December 11, 2012 according to the provisions of this permit. informed and engaged • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized constituency,and the . When the site is re-stabilized and the MCWD staff has cost efFective use of performed a final inspection, all silt fences must be removed public funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven, MN 55391 •Office: (952)471-0590• Fax: (952)471-0682 •www.minnehahacreek.org � Inspection/AnalvsislMonitorins� Fees A site inspection and monitoring by District staff will be perFormed where the � � � activity involves: • a commercial/industriaUmulti-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland � � • � dredging within the beds, banks or shores of any protected water or wetland � . • a violation • any project which in the judgment of the District staff should be inspected due � to project location, scope, or construction techniques � In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected . by the work, analysis of the work, and any subsequent monitoring of tlie work, which in the case of a violation shall be at least$35. . Standard Fee Schedule ' District professional staff - $ 57.74* ' District interns ' $ 36.44* � . District clerical staff $ 42.16* ' Consulting Senior Engineer $contracted rate . , . Consulting Engineer/Technician $contracted rate District Counsel _ $contracted rate ; Application fee $ 10.00 Copy costs $ .25+ actual staff time . Color copy costs $ 1.00+actual staff time * Hourly � � � � �` �� i �i�� .��•�� � � � ' � '� �''�� . ' , � � ��-- ., ° � � * �� A , 4 � ' �� ,��► ' •�:. : � `=. : � , ,. � �.�� � .r— , > ; . ,,� ,, N"" �` �, ` +a`# �`�"� by � �� \�� ` �.� , � � �. �� , �{ � � ;, , , � � . !��fwr� �,, ,;'� ��q ��(i. ` �` '+ ` Y �./� �� � , ,����,�,,�.��«�, '�� �/i�� r^L� d '+� .. � , � ♦ . �`�'��` _`��f\ . . ,`�' ,(�% �,. � `f M � \ i ��I �+F��ii �'�� ��� �,�'� �. J ` 1� '�} } .# 1 7`t /Q`y� a�� , � ��.,�1 ;.�'�,# �' ..�� ��"�!!!"T_'. ��+� �' , ',\ � i '. A � � �* . \-��• i *��� ����a �:���'f-��. J'.. .r"���. �, �` �� `,�l � �, �. �.��� , � � , t �t`� , _ 7 �� � �d � . �- , _ �A" � _y � �.� �- _ � �,�'"� a �y �`�z �, � '� � '�� ��..+f . �� �� - - � �� ��`^� r�`�f � .}� � d,. , _ , ' e � •r, � � �k�w,`�� ~ i ,,,�„�� � `•�! .. 1;� .� � �,� `� � 1 . � � ��� � �°���!��`�►'" F,�� �' r _� _ Na �i�y , r , � �` � � �• y �,� - ! ' h� � r /�' ,:�'� ,, ._ t�'�s<�'4' ``'ai' G t� - � �t , . �;� ` ; , ��� ��._ -$K.. � a" T�� �� i � . �� — , � � � _�-,,�, :� •� � `�t,�v � �, � f�� ,:,k% N. _� ?� ' � • ; ��� p; - �� —; �4� `�";� �� Y1 ��: ';�` : ; � , + ;`�` f`�r'� ♦ �R �iy' � � a j ', i �� . � � aUa��, Y ..� �1'N.,. �\ `: �;. Ar./* . '�r(�jt'��' ��' � s� �'�1 y yt �}!,�l�i�. ��✓'��"��., #� �i� � �'I ii ��, :�<��� ��.��.N �i. s; � ��'`r ,I �F � y . y'`` ,�.�.. �, p� . , 'u +��:� • � '1 ,d Y ��^ � � $t r; �` 1� � ��� "�� , iY�} "'� ° '�� `'s. � ��[ 4- } �_ t��� '� 1 �,�r � �� � � �! Y �� � ,�` .�, �� � - ��� �r,�`� 6 1 '� � �,� �� ' � �""`°ma•,c ,� - 1� 7 �j.. '..y �,� �. i.�� a ,, �� �i� � � .� s� '� �' 1,� til � } L� t 1 � " �- �. � • I� ���+ � ;�/ `�� -�,� v��� �. '`\ � � i � ��� � `�� `� � ��� 1 �(/�4 � �Li' � � �! ; � `•�,1�n��)�� �ti�� '{�',.�, :�� T�`` ''�. � ,i . �.� r���; +`.! q, ;.� � F1 � �� ��� •, ) , �{ � ,— ,� '�:� � ,i�.�� ;,�. r;�, � �' �;��.� '`�r 1���� , �-�_ .. ��=�� ;r€ -- ,� :, .� � �_ cN ;u.wc.�m� "� �S ,��,-/! .r1�?�,.�!'r i1.r�►�M-""'.� .� "�� � �' � µ��'"�� FY �+ ,�,. ¢ . _ �y i�1 'k . y '��� M�yy� �,.p.�:,��.��I r. ' : . ° c� i c � � . w� „�, �ir ".Y�c � � �j :� �' �', Y,t�t �xy,`�'��.'.,�"= �°�.��� ars `�U '� �`� � ' +l. � ��` �" y�'y�' .��' � �.w'^�1+f _ ��^�»i"'��-,,�`�" -�`"" _ ,�s'�4��`=i�� �� �"��., ,� �. �i �'i'� � �w'� _, � .� r ,.. � °-a�- ..�.�' � _ � '�` ��e,�< €� -�.. � �,.. . � � . , . .� .,.�la�- , «,� a s ,. k - . v � ��. k� : �t� ��'� i��- �� � l` , � � ,'� � . _ . �; '�'i . ' r ' .. �� _ v': ." p��y��� � � - .__ . .�v , . �'•% , . _ 4 / ' ;j , . � J � ����� �. f�, � .�3� y� �/l ' � � . . `� Ii�. / : � � . •.f �..� � � � % �. (j�� ��� �t/ •�' + : .,._ ' " ''� . . . � s � ,_� '^� �l ..i`- . r' r� . _, ��' � � �� .: -.ti a " � .�'+__ � _ . �.�1 � ;� `,y''i 'r' � , f. ' � ��V� Y W � +`•j o- e �� *' ` r i�' .. :y r9✓ ' - � �c z t �,1 � �� �; � �� "�r � _ � ' � �a� .f� ' ,�i �� � � �t �t ' ` . / jyy� �� � _,,,R, � , �, - ' +�, .r' � J ...�;; ���� � wfr� s`t � ' � �� N ~ � �I �k T"'i�,A3"�:. �� � '�.. �� • ,. �� r . - � . � {:, \ � � A 3 � , ; ��� ���s. ', � i , . „r.�.;�.- �n . .. ..- , i _ �,r.�.�ai ;� ( � � . ¢' 2, � � �:,� , ,.. �� -+..... �' f �� . X.: I�" '�f,;� . ��..-._�i— 4�8 ' � � "��� �� � �t � . .-. . :� �, .4 v �j �y� • , .�: �. , :... . `� ,. , , �� . _ � �.. .._� .., �. . �;, i .,. , � r ,, . � , �, , � . . ��. ' .., . � . �. f .., .>. . -- .. �. . . ...� iy . " �r .'4. ""�^'!� ,� ' .�.,� s� � I � �39l.. � � . .. . �. . I � � d � , ���`�,.:�, .. '.� `�T ��"� �� � L 1� �'i'1 i��t�'" � � �, 9M �#' -��� , .� '' .�, .. _ � _ . .� �.� ,� �, � • � _�: �'�'' _ ,� �r, °�� �c � ` — — � � � � _ -,�'�il ;��� � rf� , �^, � ,�, ,� , -i,� P r�h `� . �-' . �� _ � � ,'� , rl "� t t� ��_ � ♦ •� . . � �k' 31 `•�� , � � rw `� a� - * {,� i.. '^.�.s�"� ., $ '�. .. "► i:' „� � ^ �, � ,- '� � � � ` ,��' 1 � � '�. - '�& � :�. `1'" • ��� �. k /� 4�'," _.-- ''� `<� - � � _ , � . '. . ,. . ;. . J � � �� � � � - :� , ,;�.� � � . �� , �: �� �, " _ - � , ��� :�; ` `` ��; .., �_ � � �4 z. ' � , . �- ��� ,�, �`g���� ' . ...�', «.��..,, c: - c $' ��_ `�' � �.��i: 9 �'+' �" x. .. -=p �`Se>� ;�+ ���. „ ��� .. 1� .. a t .�� y•� �._ �, % y � F .� ��.i� .�„ k �' � � � � .y: .A ��! �, �_ �t�� � . ' ..� f, . ,� _�. � >��_ '' `s3�°`�: . �,_��,��� ., , �� � � ,. - i , . ' ; -� , �� _ y����' � '. yx��. � ��. ��,�' �„_ l �-��� �;° ` „�,�"�,�,�:� � ,.�t��r���� __�� i` � ' � i �Z S�y: . . �. ��- .. . ' 1^�` . 2at4 's""i"�Q'a.:>"° '�. � '� .� :t�_ ���" ..o., ---^ ` .�. . L !�. .+--� +1K1 �C ,'�i : .�� � �. ''�_..�w, 'r�"'�u�,..:� p"� ,13�` j r' _ j� --_y� "_ ... '-�+�M �.. `. :�.�'� . . . .� .�, � . '� ' � ' - : .., , � , . . . . ' �` � �, � � - . �^-�*� ,' - � � `�.nr... yw. _ c. �:.�' �,�� � � '" � � '"'� � � . �"�` ,�;� '� ? .� i�'".� . , � � � �� � � � . ,, �, , ,/'' ���� . � �� � � _ _ � '-n q ':1� . . � v y' � -'�,/r`��,� � ��� � �'� �'_ �I .-° �r ��,� w �'+r���' �» . • ���� j �- , o � . `\���. , `� '' �I��r� � •'��.. �" ,K ♦ l, aw r. �'��a � �� � ` y � ` 1 ��i��^ �� rS� � `'� � �� - " ,`y`�r ' �� �' '�� _ . .-�' `�'w���•,.�! Y} '�"~ ����:�. ..... �.�. '"•-� � �. r�'1.R �"F ti, � ' � •'�',�� ` p_', }k ��q, V � '< �` ..�'.Yio+'''�..«�°w�6 3S1�u� ``. _�. ;.5 � . . ` \�" � `..'R;C l ��� � �, _. � ■ _ � < � , W„ �i� „�e , .� , ',� =t�+. ,. _ � k�t� a W, � � � '� a � ��� ��4F�y � � � k y.. s� _. .;;,. �'•. ���.������ ..��c. � � � �, � 7lr�.,.,�.. ,"�'�A �. M . ._. �..ct � `' . .. ��y�Y� 4 �-`�* �k.� .��>' � .. . �... `' �r-.�i�'� ��.�.'r� '�-�e�s - �' � """T�,',��' .��-��y � ' . +��y�,��i r �,��`� �i�' ��'. � v } . , �; �,� �`G � �, �, � y N�i���:' _. , . i ` . �� �f L " � ' �c. � �'. �� � -. � ���' �*��• ; �. , , {LL . � � `�M'� � f��ht' , . ' � N.:n b%ri'� � t ���. �{..p�,.e.�:ri � : ". �. � , � �� �;' ;u+.� . �, r. . �,�t � : .� . . " r ."m#, N � �.... :^ f �� � ..,. . , ,. w+ �.. �,,�.g . ,-fi,` s; . '' A " �k�'r.i ����e'��AY3fYtl' . :�_...._.... �� �l�l `..._ . r" .. �� �1�-' Q Z�� �'1�D1.�►'t�" � �l� R� � � �� ,�," � �.{ � ` :;<�: � i �, ��� � � � ��� � p� � r�- �%,+�► '�''� �:.� / �� � � � � t��''- �-� # _ � ;�t r`�t �► <.. ! � ; ���;. �„ �� � ,/ ` ,�� '� `��; - . �' �-- ��' °� � -�=: �- - w. ' .; �, y q �. '"�.�. - ;'i �::� -+� � � �i ,, �' � � � "E'� `i ^.. \ �� •-�r '� ,` ,� y \' — �a ! ��. � �' '�Y'L� ��. �� {r�E>� { �+ � . .' . i . q �� �.y _� Z.. ,. ¢Y. , .'� �r^— ' .. � ' ' ` �,% �; ��.. I�� �, � ` .'� � * .;1 r , y� i ,� '� ��/ ` {.. w'.���. . ,�r,�.} i �� ;� �iJ>' ,,s/�. . �� °7 :7L, ~ '^���-� ��� �� // � �. , � e�jt �� � _ y� 4 y 1 . ' r '�+1�• �1��`=. ._y,a" ^���' "! ,I��h,` ` •Y ��. �� �.i . . .. ' �'�: �, a • f �1; . �', 1 ,1� � �� � ��'t� '��,'` �s� 'r ;�a'k.,".% `i\„ �'- �I� (tb� �' c�,a ' �..J . . � ` y '� .�a�� . ��'``.��'�� ./. . �, 'y 1 , �.f- .. ai",�r, `1��, ti, .:�1� ?�€ k�..�. * + N f �/ '� � i � ,; t � ��a�;,,• i', a����p "� �,U f � �_p � ;�' �y � /.7�.�x:�. � � �'� ./ I ��`f .� { Yy �� �:� �+�..� � 3 . al. ,n � `' �� � �� � � • ' ' fs �9 �> /" �' . +, . ' $ - � - . . . -��� �� � � i s . �,�,--'S' I-G ��Y �}r.�r ��.:.... ya. . �. W f I ��F % y!,i . �i'��e.� hKi,`s�t��Y� ,��' �, �' � �'� �i," � � . :%/�� " �r� � � � � ��i � .� � �M.��. P �"''f �, ���t,1, �� �J ��:'> a �. .� � '.'� ! �.'.�Y�� F'� � ���P T �y� ��! ,�_, �f� ,�� . . '� � < ��..'�'.✓e�i. q:'y Y, 3 L 1 ���� ` �,�.< r a. �, �.�, �,k �S ��� + ,t � �a: I '� �.h 5:,� -�«t.. ����. � �/�.,• k . ... � t� J i fi��y 1 `�) q 1.�. , tja �' ly��' /' 11 �i� i � �-� �' �� 1�' ��A�laj.. I, 1��,~ �a `, r ��s�.� �,; � � � � � � �� �' i 4� ` ,�jj � ,� � l,; 'w. � � � � ,_ * y ,i '�� a� ! J��.� . y Q �f�, 5 � ���� � � 1 + , l� - � ,� y y �, +� . „� i�. ; �a�, �w: s;��l , �� ,�.,' � ��„ a � ��. . .� , �• �_!�. � �% � .. ,��� , �A ��_ .� �` � "'" � � . . . � �� � ' A, � ar; � Y.�� y� `r �r�� .;9s � � � �4:.�, {' � `� ��3�� !'•_ �'�� �„�; �� �� ��� � � �'f'¢ +�� ���� �� p t,r,�� �,r'.. -�� • 3 �� ��.,�� '/ p;sv .' �. .q' , s M ,.s �h 'E' � , . �� �;Er,�'� �� + � '-�'y�' � ���.. � °1� � { .. �i , �•' .` ,� � ��_ ' �� � � . . � x�' ,_ , �.e i i i ':�'at:. � �.. . � �;,s �r�9' ' : i � �y�,�'� ,1►,'e .. 1 y i" '� ,� ,..���� -} # 7� " �% ' �:_ � �� �«� � � �' t '�' � " � a� .���i � •" �� _ �� ���� 13.' � � e. ,M � �.� � � i��� .:3'� j � ,�p � \ , �"��'i4}, � ;�'* = `� �'• • �, � ziiae"� :�- 5 .� � $ s� '�" _ 'r'.Y �.�� �� 7'�t 4 ��� � : � �,�T , '�`�X� q ii.� =�.� s*' ��L�'� ����` +�� \:t� . 4 �f�i � '`�'"9� I r �`. t ;R �.S+a�' �A� I ' � .. <�,. ; Y- ii`�� '�� .�� t� i � t�y �, � ��' � F,�._ s��w � 6 t;.� ! q ��}. y� � ' +�~' � ���i'�. >f� y �� "� Y �, r .G'�' �or�' � �I\�i�� - � . '���'. �3 � � '� ry� �� a '�:;k 1 � �Y"i+'�i 5y x'� � t ���il �. ��.p �y� ` .'Y� { d � � �' Y ;�S '.�"� 5t ,{�,;,' �3'�,� � r�w '���k��� �I �..� /. � ��k�� '/ .`!. x � �.. � ����� 1 f� .� � (-4.� ��� �N�� �! a.,�. k���M���N�� ` ;;' �. �+ ��.�:'� `t �`•. - � �1. *�� '* �'�; ��•�\"`' . , . , ��� y �. ,:'b, . :r. � .,� . ,� .�►. � � ��� �a,,'a. �� ,.-��.��� '�F�t �,� ef'�.. t � � i' � � � �� �� F � t�: ' � , , : # .'��m . .k^��, ; ' � �" �•��_� � � "` $ 3 s 4 �'�. � x A��� . . �� .. � T:� I � � Y ' � ��� �; {• " .. ;L.._ �k 1q: '�F . . .��� �_ ii.'< ��. >4 ��� � / ' � ' • � / � :�i,� �-,� '� ! ;� � ��`+t„ - �. i � # ''� � �'"T'�•�,.. � ' _r�`V �� t., �� �$ � R. �1 � �{,i? �a �+ '`.,> �, � G r„�' �h.� �t� ,. � . � � � �� �� 4, � i A� r`"^G7...y� '7� � ♦ i ' • � � � .1� �/. :.'�'� ''n g �`fy� .. ;.�_ �.r .,�, . �,� � ti.r aI `�i ;� � �'f'R � � j �.# � ..+ ' 1 _ °:, !�,', i� �.� .� $ �Fa � �:�r �� f. ` . r � , � . '�� �_ . >� '4 '+ f} `' +`�; c� �, i���, � ``�.e ,� "��� �.�, . � �'4 � � �' e��� '�"�'+:4,� �,.�,�,�, ,.- ,, . , . : , .� , � , . , . t �• �� �� I�'�"f �_ � � � . ^�' � �.'� ,�%�� � , � i` �1"��� fi�� ��� � : � � • � �.� .� �f'".� i '6. � ..-. ��y'��, �r.�".-�. �r � �, , .�� ' ,r� v�'.. -..�., , k ��i+ � �,i�t�;•�' y� , ,�, .t�♦ _ +, '.e+ Y ,. ` : '�v �' r ./�Y %` 7P' ! y l. �- f7'r . �� /' (�i } �F: r � �f'� � �` ,b„ka•" ' ,/ �i�� � . �� �F�I'i i �% 1 �� �f�:,� ',,v+� . '-t����,�1 ''�f f � /,. r s° �� ,� �- !�i �,��; •}�:• .�, � � �* ����' �,_ � '"�`�-� ,x '_'.. .� , � � � ��.� .. . , • �A � � �� + ' q''�' �.p� ,I , �� .����� ^..�� r�� � � ,yr Vi � � `u�K ti::: .,a..��� t. . ���� ��,i,�\'� (��� �� ��� � ��i� � w +Y 4:` A. .� �'��� � � - 1 e � ,d �^�i— '� ' 3r ���� � . �� ' ; �` .� ��i�• 1 ,. _ y� ' - ,���� �� i • .��,. � � ` �` � �� �� � • � v.� � . ; � 64 � - ,. �;�,� R �� µ; _r �,; , +, - ,_ 7�°'�-+� � , � � l � ,�" � '�`"�' � , �. .. � . $ � ?fi �,,+ ,�, .e ���i � , . � „{ �� . � , .� � � —,. ._. , _ , _� , � ,�„e P » �• . , �, ,r� � y � ;�,i�;;w� �,� . � �����=-r� � �� a�` �� ' � r, ��fi r _ -_ - _. - � � <1 `i y! if � y - ` � • t . �.,: -: r w i.'�'.,� ��� , / ���.. _ �� ;�. ry� , ,. �`�, ' � # � ' .�. .' /�� ��'! t 'x ' ti�t A � � ��� t .l �� ' . ' f �``1 ii. 1, l ' �.�1 �f` � , y��y�e_ �� ,��ri �IE�'�,�. . . . � � . ���±.� �s . N�.. .. ��" . � �Y3 r F ���`� �;� E.. �� � � ��S" .� .. .. �� "' ��� � �.� �r � `�"!.S ' s � � � � � d�' ��. J �h �. . _. , / � � , ry, .r-.�,�, �` f �•�+ �►-�►..... , ��� ��. �,_� �!h.� , ���� �, .; � ��,� ,, . _ r ��'. � , - < i � �� � t � � � F._ ,�4s P.f/��`'��.�.r �i "',;�. "� ��y� ��J k��. , . � � � , . ' . �� r . �..,�';� .ly„�' a N�4�����k ' � : � �f,, ���,� Cj�1,wfj. . � a � k `x ,:.. �� � w '�jy �. � k k � . s� � :.%�f t • . �" I v . � f'�. . . �s ; �"t' �� �c� ' �:.�,y ,�� ".��,-�i� t;ii�3 . . . . ;�� _1. •_ ,�1 �. � ��.�., ^��. ;�� � ."@�`-e ' _ � , • , i . " ; ���i�.� � .._ ��, . � � . . L . � , � ; , . • � : , ��;." �} -�r5;�`," �f J � d c �� � "�, +�� t.� � � �. - �y�`' �, a�' � '` �`{ �' � ��l ._. , � ak'� :� � 4y` � " �'t 5,� �" r.�hr�- ��.' �-,� .t y�:` ^^ :y.� '� �- "mf G :r... :J�'':'"' �:� ,p� - , y II��;�`' . . ,. .. � �}�' `!`�.*���." I y` 1 � .� i �; .:.}z ��,�/��".�A p� V F. �1 $ ': ./�_. � .���.:f� �, 'Q ` �� ; ��,��� � 11 ,� t��� , � ,i�; �;�w''�> s , �` � L�.-�� y��. -�j+ � \ � � 4 � r �f "I" �7{ c . Y��L... 5t . ' •.���..6 ... 1 .�'�,, � \ �. _ `�i f'�5', 1 �, , i �'.� t �'_'-� ��. . 1` �II �'��,�; �� ��f�" '�.�.`.;. T .. '..., ` ' I �. . �A ..( b . 4 3y �i � p � :.. . �Y t d`�/j _ .: �"Y r� ` �� i. �a ,�� P 'h � t �i. �' ���4� !.' `j-�" �' 1 , { $ � � J!i - a r` ` ,'� ��:�`�.� . 4 � �� ��� � ��`_.,s �r k �.�� �4^' � ''� � � ,' � , � ~�� .�� . yA 1� . .. _ .v..3l� � .�`�•. � .� `� � � ' �'��'/�� '� .� , ^� �.. , �` �,�_ '4' , �,'' _ .t� i , � ...1 ^ wµ '�?� r� ' v �� .;� � ", . , � �� �� � �,. n. ,,.�� ����� k� ��.-��6..., ..v ,iW� � �� �� __ � �t � �,,���+ ��-� � � � ,��� � � _ , , , , r �s � � ��- '�- } 7, y � _� �^�� -- . � �;. � '� " � � ., r' ' , � ,` p f� '���`"� �k�� , �k �< � �� d�� �`: � "�)��` � e t y,: _ � , a ,��� i �, � � %� i ,� f 1�+ ,� ri �..,�; ,� ,�a',w.^t.y }�� ` �� c, � �.�.`s lt S r �,'., �:�,,. . �",pw � ' . ''i �`'�F.�, i� a�;'�..'tfo�C• .:, . . ._u+l�:� .x ' _ �' ! ����1.lv�/�/ 1'�;�V\,JI��— � � !��� �! I�.JII�t'11� � �,�/" ~ " � . ����, yii:�� ., h�''a#�^TI'�. i.•^,.. . . . . � �ry'•< . �h 3 . `'µ� � . $t.�� s:..� ;}`��... :: sh Y NAy y,�- . � ,�,,W: i P44Y.' '. . . r.,..�,. <��.-...a, . � . . . � ���:� . .- -- ..�.. ., , ,. :.:.�w ._..,;. -�� �:: . °�,.",._ .e. . ,.,.,;.�w .. �,.�'i:; ; . , ' �� . �: '��,�� .�x;;� ' �,T� � � �: �Rkta 3,°�`'}°t� 1 f.�. : y " . d [ I � 1... �v-LYa.ra..rt�.i. �.�,�.,,�R-0�r.. Y L� ..� H ' , r , ' .. 'j .R.r�� '. ' , t', -r. � . � i .. . . .�I' �� . ` ,�.4 ., "n',,31 �&: - �� + ^ � ., '���� �:. ,.,. R • . . ... ' • . i a� - . . ' r �/ f 5. .��: w1 I � . ._,.,�5'srYLO�'.,'���+ � �'�,v � ��. � �� � � " ' , � .n� ' �.`�ri3r14 . .. *�. �$�" 1�. ���5 45�b'�- �� � : � ��� � . . ' � �. �, . - ��I , �. ,,,-�� � � �r , � y, �,' ��"''� �� . �. M;• � ���:� ;� _ , x` �..` ° ` .� _ �� � � � � . ---- ---,- _._.--�� 1 ��. �� �� '1�� . "�u�` �%,��-Y '��. � , ,� �I � 1 �� , �����` � I � +I I ��'� µ ����—�� o���, �I �,� �,� �� ��� q '�: , , r i'4f "Y�Ft,j�"'`�� � � ,. . �' :�.�:` I "�,-r�` ,, . �._'. . . �. �, , �;�r • • " , m • �� �� �, �,� .. � �� .�_.. � , a.}, s. � ;� ' . , �',s' � � � � �- � �� � �_._, � � ,�:,< . r �,�� � . -� T� .. � K .. �,�: :��<#,���� �� y .. . ,��� M b: , , , � , , .,� ; � � ��� : .�, _., .�,;� � � . � ,��. . �a . �._ ., �_ :_��. . � ���� � .,. �,` , � �- 6 � ,j "�: � °�x ` f � � �� ,� � k ��, r�� s' r y�;�� � ;. �, � � �.�� e- �� � ��f *� �� e �� � '� ,� � ��, , � ��h , �, ,; ,., „ „ �, � �� `r�� • „�.. � y , a:; a.. � � � �,. � : ���, v�� � �� ri—` — -- � F�-�Y� '�� , ' .. , r� *s i � � � ,-S:. �� V, �f', =��" .�5.�' ' � . ,,, � �a s .,a_ „ _ a-, , ___.,___�_... . �r, . � . .^�..�a'r.. ^.. �:s;:,., r .+:.:...:. . �a� �1��- � z�1�1 �I��uaa,��-� � `�lo ,�:� � ..: � s.�.,„�:;�i . � � r R,�, :s ti'r��^ ,r,. J" � '�. �� �� '����n„+�r�}. .��i1 +1 ���f��,�5 ���•�/� '��.����� \ k v'� � � i ,�y„�y �l.��.a�` ��'J/�`. ! �..� � f✓,�'�f'����-t. ""T3R .��jN.�. . t ,,� 1 �� � n 5✓�I .:f ��lr���:'a/��r �f�� `� i%� • � `� �� / �E '5' r ,�,� � �"�,�- . , ��� �� 5 � ��4�~ �'S�P:.,�°;f`.�r"�J' �`89��� ....r✓,:�� ���� .,} �'.��' ' w,, ,: < . :,�-�.�. ... . � " � �.f ! l ����ts rrr�. � r �y : .� Y� �i.e r-.:�R+{ ' �+��� � ��t R '�a ri ' �� �� � � �{'� a� . ��'� �` �� �`� 1 ' 1 ��Ni. ��I '� y'S.'M Y {k � '!'� . �. � 1� I ,�Z, Y 1 . y V�{I � !' : +� 4�'�i rY �.1.'. `.,�,'�N x�� rr� ' �f6i�/�"i � � j,-��/. . � qs � �F F'� r�� �� � .�:� ..,,�. y iM �� +} � � �j x.�!' �,. � W.M . / 'o ��+A �� � "f,��.� �j r ��-�vj , �„���� �, ��e: •'` °� �"� �����' � �`'."�f�''4��a� � �n� ��j �,�� ��°.�-�" �`'r �,y� ,. � �` ��y„ .�,��� ��, `� '.. �,R.� �l y F' 'n�S.°.�`k�1i �,Y/' 4'q�.T�� ,.r, 1.If !'%'� �;����.' '� �� -�:+;:• � ����:�,,�`'ws'i !;r� ^j�i' �� t� �� r� '�.r• .,t}��y./��,i 1. '.�` e:�r=�:. .xr+ �, e �� �;�'�a�' ��!,rA�,{�y�' �`�':�. �-�'�,�.��� a���`,�+�,� ��I��YT�j�y/G �.,�.�"�t- /y' - �q :�. �a°,'+�.�>��. c`"��'"���yiyE�� � �,� F. :;..,:'.�"M�� ,I�l'" ;v { t '� "` �.y-�`�.n� � �y }f� �fQ����V. �"k ,dl� �yr �� j� rp.x,� �� �i��. hq'f:$,7' � �Y� T,,.y4l" `.�I � .,£� � . �. �� �� b ���)1��t71'1��� '�'��,I'�h' ,q�� ( � o,�� �,�'r ��.�.��5���� � `."Ex �!�4 y :. /��,�t �* �µ �"' "��'�N���!'���r ��. ) �x�"' ��� �? l ���-' s %7� ���.. � �-�� � ��r. ���`��t�, �ra�� ��r�_y,. � , , � � s s r- � q , � �� �i� ����` ,:^y�y�i,��.��t7 11 �� 7: ,��� �� _i � �S �i � �� .�. s � r� i � r �� � � i, �"�� ',' ��,�a � � a�'.� �� �� � �. � � e „ �,7� 1 rr, ,r � ..1 ry' q` 1. f<. �� '`�� {- �� �.w,�`'' � ,`�y�; '���. �J+�T /,�..,�e� �' ,� y� �I;��� ���. r�l- ,.. � . i .�{ ' 4 y y � ���, ��'d �;i��� ��/ � / } S�i � � � f� 1�� M 4 �l, ���� , 1'1 ` ���� ak ,.�/ � ��� { � ,Y � � � � �� � ��,• r� .,,e �!� .. "/ ;�� i F+��! �. �� �'"y'� {1 � ��. .�, �� �. /! ��j���Si. .�j .'/ �, .1 y f �' �� `%;����J�/�,,,� � �� �I �� 4 � � i . �' ';i�7 , 1 � e �� � r l � .\I � / �� � '`. ��� �i� �'��� �1 ' � .� �� � �' �, �� � �� � ���� ' .�� �c� ��� � �� �• �;. �iy tr� I y4•' I ��\ .,�� ���- � -� ��! ��f:��r�l' ����. '� � �'J°"�,�3'� r' R � �� � ' T i 1 d� � / ,a >���'� ,'�` `4! '�' / ���} 'Q� ` �, I�I J �4 r �4 ' '� , � ��� '� �>� �;� � t � '!"il.� ���� �� r � y � L .��� $ �'f •�+� i.! "v�il��� \�� �p.s ` � � Y�... �� �( Y� �OGC 4-�- @ 2 �hea��f- f� Jesse Struve From: Jesse Struve Sent: Thursday, January 03, 2013 2:50 PM To: Melanie Curtis Cc: Christine Mattson Subject: 201301030 2789 Pheasant Rd -2012-01206 Melanie, I have reviewed the received on 1/3/13 and do not have any additional comments. Once the full size plans arrive I can sign off on the permit. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661 - Direct (952) 249-4616- Fax www.ci.orono.mn.us From: Jesse Struve Sent: Monday, December 10, 2012 3:30 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20121210 2789 Pheasant Rd - 2012-01206 I have reviewed the building permit for a new residential property at 2789 Pheasant Rd and have the following concerns: • The survey shows a 6" PVC storm pipe extending down the slope ultimately discharging close to the lake. This would not be allowed without a Conditional Use Permit (CUP). • Additional grading needs to be shown on the northeast corner of the house to reflect the drainage being maintained on the existing property. The 948 contour will need to be adjusted and potentially additional survey will be required to show the proposed grading plan can maintain a swale down this property line. • I believe the intent of the drainage on the east side of the property is to drain to the low area south of the house. Has the proposed 6" pipe been designed by a registered professional engineer to make sure it can handle the runoff from a 100yr event(rainfall or snowmelt)without impacting the proposed structure? This will need to be signed off by a registered professional engineer. • The retaining wall on the southwest corner exceeds 4' in height. The applicant will need to submit plans and specifications from a registered professional engineer for the retaining wall. • The silt fence shows it is extending significantly into the 0-75' zone. Is it the intent of the applicant to regrade to install sod or seed? If so this should also be included in the earthwork calculations. If the calculation exceeds 10 CY, a CUP will be required. • Are all the easements shown on the survey? Along the north side of the property there is an existing watermain and sanitary sewer, but no easement is shown. This should be included on the survey. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661- Direct (952) 249-4616- Fax www.ci.orono.mn.us i v • t / . � Load Short Form Job: -�- wrightsoft Date: Jun 05,20,2 Entire House By� Horizon Contractors, Inc. 8197 Horizon drive,Shakopee,Mn 55379 Phone:612-508-9226 Fax 952-445-4367 Email:michaelstng@yahoo.com � • • • For: � - • • • Htg Clg Infiltration Outside db(°F) -15 91 Method Simplified Inside db(°F) 68 75 Construction quality Average Design TD(°F) 83 16 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(gr/Ib) 51 32 HEATING EQUIPMENT COOLING EQUIPMENT Make Bryant Make Bryant Trade BRYANT Trade PREFERRED 16 PURON AC Model 986TA48080V17A Cond 126BNA042"""A*" AHRI ref no.4706934 Coil CNPV"'4217A"'+986"A48080V17"` AHRI ref no.4865325 Efficiency 96.2 AFUE Efficiency 12.5 EER, 15.2 SEER Heating input 80000 Btuh Sensible cooling 28350 Btuh Heating output 78000 Btuh Latent cooling 12150 Btuh Temperature rise 54 °F Total cooling 40500 Btuh Actual air flow 1350 cfm Actual air flow 1350 cfm Air flow factor 0.020 cfm/Btuh Air flow factor 0.056 cfm/Btuh Static pressure 0 in H20 Static pressure 0 in H20 Space thermostat Load sensible heat ratio 0.90 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Master Bath 279 5835 1943 114 108 His WIC 117 3176 745 62 42 Her WIC 213 1884 517 37 29 Laundry 108 1678 397 33 22 2 Mech 54 763 166 15 9 Master Bed 500 9912 4910 194 274 Bed 2 249 4281 1879 84 105 WIC 2 35 64 38 1 2 J J Bath 112 909 367 18 20 Bed 3 254 5118 1739 100 97 WIC 3 36 731 147 14 8 Bed 4 202 4314 1775 84 99 Up EI 30 609 122 12 7 W I C 4 36 66 39 1 2 Exercise 182 2728 1616 53 90 Shared Bath 105 1007 239 20 13 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2012-Nav-26 1738:55 � WC19IltSOft Right-SuiteO Universal 2012 12.0.07 RSU07800 Pa e 1 /�� 9 ers\Mike\Documents\Wrightsoft HVAC\Stonewood Teynor Budget.rup Calc=MJS Front Door faces: . � + � Up Stair/Hall 436 6220 1792 122 100 , Studio 520 14611 4279 286 239 Bonus Hall 125 4070 956 80 53 Exercise WIC 28 1057 525 21 29 Entire House 3621 69034 24193 1350 1350 Other equip loads 0 0 Equip. @ 0.96 RSM 23225 Latent cooling 2827 TOTALS � 3621 � 69034 � 26052 � 1350 � 1350 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. � � W�'1 htsoft 2012-Nov-26 17:38:55 9 Right-SuileOUniversa1201212.0.07RSU07800 Page2 /�� ...ers\Mike\Documents\Wrightsoft HVAC\Stonewood Teynor Budget.rup Calc=MJ8 Front Door faces: �' , � l�� ` , ' �}�.' T�.�, Aec�i..d DM�r.w.M��r o.�r br E�..�t 6�.4..�t�a.i� UM b Ccilwp b Efrlf FiD�e lu��fon Or�s ar�po�r nat otr ar a�i� Ons adnoepMdaip Yiipe�o�i�ic�y a�nect�+t apqfonces ar aeeisted�pi�ioeo aud v�errMed�e a d �sid�ar d no ooia0u�iae�pia�ae" power rent ar dNct wat app�enoo a ans soid ;piMo�s ar soid iuel � t�lor Qf5 0.08 0.06 QC3 b) �an�oned ba suo `,.�,� ��l5 �� '�'�°"`�': I 35 ,.x, 2 F�d�tM C�r'.i�r � ��edse�e� a�r rar�M�ion s�e � � �� a�fi as b cJo�ies 135 136 136 135 c) 8Q%d Ia�M mdwat �D t�►)�1� �g�Q 1uU ���4x .x.r�_ nlerlocJaed and h�� a�tled b � � 8096 cF neiQ M�ge�t uam�t raBno tr�r. (not�p�pYca6b i naar�6rg ay�1Nn ar �po�reied makeup ai b eleclric�lp iile�tori�ad snd rn�ld�ed b nut TCfa(E�iet CepeCiy a�: w• 8.�5 S 3. Mal��p Air � aj Ta��i F.�a�st C�dh 5� _5 S b, �� 3s� �ww�ar t�►.t�—� _ ��a�wA�w�ro - 5(�"� �� �. ��k �g�^�b �,�� TaDis 50t.3..2 ���ad��ar ffaw tie uooai�� � Uss f�e aoUmrt�tlnis et�a�ier 1ron tar�a�iM1d or�no�pl+Ric�r e lbs M�� oorwn�tl+en ie air��e'sled appfano�vr v�p s�.0�1a•����°�r�ds � Uee wis o0iu�n f f wis it one al�+opiwiah��{dAenlqn t�ariMdlgr ar d�PP`�P����o ar oa�add iNi o Ih�Uee��nn 1 has se m�liple s�o�p��d 9�a°i��s aoeam wat ar�f IMw aia� verNed gas ot d a�piot�oes ard soid fuel�s. 13 1 � � I • 1 Foyer 224 4546 1373 82 66 Pantry/Support 65 719 216 13 10 Butlers 49 1003 200 18 10 Stair/Hall 203 2595 1237 47 59 Gail Off 49 1673 629 30 30 Mud Etc 541 11361 2818 204 135 Entire House 5424 82508 30899 1483 1483 Other equip loads 0 0 Equip. @ 0.96 RSM 29663 Latent cooling 4196 TOTALS � 5424 � 82508 � 33859 � 1483 � 1483 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. „ wri htsoft 2012-Nov-2617:31:15 9 Right-SuiteO Universal 2012 12.0.07 RSU07800 Page 2 �� ...ers\Mike\Documents\Wrightsoft HVAC\Stonewood Teynor Budgel.rup Calc=MJS Front Door faces: � ' I • � Load Short Form �°b: �- wrightsoft Date: Jun 05,Zo,2 Enfire House By� Horizon Contractors, Inc. 8197 Horizon drive,Shakopee,Mn 55379 Phone:612-508-9226 Fax:952-445-4367 Email:michaelstng@yahoo.com � • • • For: � - • • • Htg Clg Infiltration Outside db(°F) -15 91 Method Simplified Inside db(°F) 68 75 Construction quality Average Design TD(°F) 83 16 Fireplaces � Daily range - M Inside humidity(%) 50 50 Moisture difference(gr/Ib) 51 32 HEATING EQUIPMENT COOLING EQUIPMENT Make Bryant Make Bryant Trade BRYANT Trade PREFERRED 16 PURON AC Model 986TA60100V21 Cond 1266NA048""*A"' AHRI ref no.5039826 Coil CNPV*4821A""`+986'A60100V21"' AHRI ref no.5114330 Efficiency 96.1 AFUE Efficiency 12.7 EER, 15 SEER Heating input 100000 Btuh Sensible cooling 31150 Btuh Heating output 97000 Btuh Latent cooling 13350 Btuh Temperature rise 61 °F Total cooling 44500 Btuh Actual air flow 1483 cfm Actual air flow 1483 cfm Air flow factor 0.018 cfm/Btuh Air flow factor 0.048 cfm/Btuh Static pressure 0 in H20 Static pressure 0 in H20 Space thermostat Load sensibte heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Media 420 4992 3075 90 148 Lakelounge 402 7880 3731 142 179 Bed 5 224 3238 1341 58 64 WIC 5 35 41 0 1 0 Game Clos 20 23 0 0 0 Lake entry etc. 245 3077 526 55 25 Wine 112 2180 193 39 9 Bar 154 1081 85 19 4 Game 594 4297 344 77 16 Mech 442 5350 456 96 22 Sunroom 402 9849 5434 177 261 Gathering 420 4964 3214 89 154 Kitchen 294 3128 2798 56 134 Ofice 169 3865 1469 69 71 Dining 320 4956 1458 89 70 Powder 42 1689 303 30 15 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. W rl htsoft 2012-Nov-26 17:31:15 �� � 9 Right-Suite�Universal 2012 12.0.07 RSU07800 Pa e 1 9 ers\Mike\Documents\Wrightsoft HVAC\Stonewood Teynor Budget.rup Calc=MJ8 Front Door faces: � B � b� � � � � � b �� � � $ � � � � � � � � �� � � � � � b � � � � � � � w - ��� � �� � � � � � �� -� � � � � � � � � � � � � ^ � � b �#� � � � � � �� �. � � � � � � . � � � � � � � � � � . � � � '�� "3 " � � � �.J v, � $ � � M ,�1 � � $ �� � � � v � r" oo ;m ' ► � �' � � �� � � � C .� .� � � �•� y: b'� g � � � � � � � '�� � � • ,. �. �,� � � � � � � � � � ���'.��• a �'� � �b � � � � � . � � � � � . a � a � � .t � � � � � � � P �$ � � � $ �. �i' � � ;E � � � � . W � �� . . � � � � � � � �� $ ���� ��� � ��3 �� v � � ��� ��� �.�. ���_ � .�. �� � � a eJ ui' a <^a 6 c•i .v o � < m o 0 ,' ��'Jew Construction Energy Code Compliance Certificate , � Ftt>:IJ�SB..r�1.��(m,r�atr -1h:/.:�_ �. ..j., ._.._ , _. m ;�:rsnc . _�_e��a����m�.ieeSc^�l.'.Js�x T?x Dau(�ere(katePmtcd :er;r�:a*c:hatl R:,wnp4Y.ei M�hr lw�i�•r�ai;�-a::!:it ir,:o�^u!:�r.ind�aiw�(tm�a:�.r.•s Istaf�n Tatie�i I��1 5 Nailie;.�ddmf of tM�wNfiet or Pwesist t'ni� Cih� '7`� �h��.�-; , ��i �ame of Residmtid fmtractaf NY Lice�e\�mbQ THERMAL ENVELOPE RADON SYSTEM Type:Check AI�That Apply Passi�e 1-\o fan 1 v � Achve(f�'ith jan/vui mnnnmerer nr — ,� orhrr sysrem ntat��oring dc�'ice ) — ? — � � J .7 < 3 � _ - � ' T Insulation Location � = Z � _ ^' Y , — ' - `�' =° E E � � - - - � � � x = � z = - - 5 z z C11hcr Picasc fkunbc Hcrc Below F.ntire SIaA Foundation�1 all T�rpe n acaoon.�ntenor exterior or integral Prrimrter of Slab oo Grade Ri m Joist(Fou oJ atioe) rype n iocaoon arerror extanor or x,caqrei Rim Joisi(I"Floor+) rype.,�orat,m �rr,rs«e�aena a�nteg.a� \1�11 c��i�H ,nA� Ctiling.�aulted Ba�N indoNs or cantik�•ercd anas Bonus room o�er�ars e Describe other insalated arcas Windows 6 Doors HeaUn or Gaolin Ducts Outside CondiUoned Spaces 1'.era�r C-t a�tor ksclu�les sR�liXhrs and one�a�r )t: �oc a. IFcablr,all diKts ickated in cnndman�i space S��I.0 Hr�t liem('�xflicient ISH(if 1� R-��alu2 MECHANICAL SYSTEMS S �:_ ' ! � - Make-upAir .Selrcia 1)� A p110nGe5 Heaun¢5�stem Ckmte;tic\4'a�rr I leater C�wli ��S��trm � Not r uired r mech.cude � Fuel T� � r..-�- �'t' N�:c�vr �laoufactorer ,�� � � ; t ,,� Puwrrcd Interlcxked�cith eshausr dccicc �lodcl ��b�G �-�, v .�• 1�C1���, Ucscrihc: Inpul in Capa:in m (hnpw m � (hhei.dCSCRhC'. RatinR or Siu BTLS. u�`{,�- Gallora. 7'oas 3• 7 Hea�Loce Heat c;ain I.ocation of duct or s stcm Strocturc'sCakulaled �,`�C )` �4�, .��E,x �F:F:I2� NSPF°o .j. '•• `I/ , Calculatat Efiicienc� �`� wolingluad ��G�� Cfm's 'round duct OR Meehanleal Ventlladon System 'metal du�:t Drxr�br am :xlditiun:ai ur cumbined htatms ur coolme s�stems if eru-talleJ Ir_.a+o furmaces or air CombusUon Aif Sdect a T}pt -�urce heat pump��ith eas back-up furnactl Not reqwred per mech-caiz Seletr T•t �s��z � Heat Reco�er V�ntilator 1}�RV) Ca c[n fn cfms Lo« Itigk �' (hhcr.drscnbe: f:ncr� Rcmccr�'cnnlamr�F.RV 1 Ca�x�tv in cfms Lo��- {{i¢h l�ckauon of duct or s�strm Continuoac c�haLLmn fa s ratcd ca cin m cfms I.c+canon nf farys).dcscnbc' ,.; rt h o� � ��- ,=�l Cfm's Ca acin cnntmuoat�ennlanon rate m cfm; � (� fO�����R Tota1 semdation�intennutrn!-�un[uiuuusi:atr in c[m� �-( j �metal duc! Created by BAM version 052009 L � . � ' New Construction Energy Code Compliance Certificate ?:t�I 1�il 8 F3uiluaa l atdw�e A buill:n¢cat�fxstc slall bc�vaN m a R*rrunently�n�bk:w.v>�n�.�sx1t�x bwl�Lna f tk Date f-rrtifraa Pocted .m�tute;l�al!6e c vnplaed b�d�e Mnlda aa1 shtll list iofttaww�aoJ�alu�es oCcnn�ponmb lutai�n laAk�1101 S �(ail�=M/ree of be Dwei`t or Dwd�c l'si C�7 ,+ ' \ rl \ � � •� 1C. 7�l v��t, �, Yawe d Reida�dal Co�trrtir �L�Licasr\'uber THERMALENVELOPE RADON SYSTEM Type:Chedc A}I That AppIY P3,sn�1.1'n F'a�t) c = � ACUve(�i itlt 1an an<I nronomeld��x — l, Wher s��stem m��n�roring derrce ) _ � � ^ 3 c ; � — � � ? u c ° o `i =' X � ,� u 3 - � S 2 `� � � :. � _ _ L � - � C r r ,_^,� • � I�sulation Location _ z � � G : ;.; �- oe ' � � m E � � ' — � _ °' � C.. J y ,.,� .� _ � z s L " � � z Other Please Describe Hem Betow F.etirc SIaA Foundation N'all rype n�oa�tion iruuenor exter�or,rrteqra� Perimeter of Slab oa Gnde Rim Joist(Foradation) rype n acaua,mtenw ezrenor ar�rneqrai Rim Joist(1'Floor*) Type n bcaoon �ntenor exter�ar a trnega� ��all Ceili .flat Ceiling,c�ulted Rar•��'iodow's or eaeHle��erod arcas Fionas room m•er�artRe Deuribe olher insalated areis Windows 3 Doors Heating or Cooling Oucis Outside CondiUo�ed Spaces ,��rr•.Le l:-f actur lncludes sA�•li rs and une dWr)l' Nut a licahlr.all lucu I�kate�l in condiuoned space tiular Heat Gam CorlTKirnt�SHGC)- kt-�alix MECHANICAL SYSTEMS < L��,,, . - c.,, � Make-upAir .4d�•�rU rti� A IIanGBS Heati S�strm [k�mtstk Wattt Neater Ccx�lm¢S��stem Not r uired r mech c�x1e Fuel'1'c L /, � I'atisive �� n �lanufacro�er i�: . C' <1 R: , c' �H'�r� lntcrlcekcd uith cxhau�l dr�iut. �1ode1 (' L'f�C..�vC.1GL �(. ,N f�i: � t�rscnbe: (�ut in Capaciq�m (hn{wt m l�l}t�i.(�CSCtt�2�. Ratie�,or Size N R S (.Lt�� Galtmi To�s Hcn Loss Hcai Ga�n �,� „ Location of duct nr s stcm titrsctrrc's('alcolatcd `�S7 Si.�j 7��5' \F1'f or S[ER / HSPF°o �� � Cakula�ed 4:. Efficicnt� ax.lingload: yy��C. Clm'� 'fWDd�UCI OR Mechanical VentilaUon System �m2[a�du�� Dexribe am:nidiU�utial or comhinod hcahn�ur ccx�line s strnts if iruWlled (e� t��n fiimatts or air COrtlbuStiOn Ai�.Sdeet a T• 11_ rce heat pump unh gac back-up fimiace) Not reyuired per m�wh caie Sdect T � �avive fieat Reco�er Vrntilator(fIRV) Ca i in cfms Lo�s � Ili¢h � Chtxr_descnhc Gner� Rrcutitr�'rntilatur IERV)Capacm in cfms Lo�ti: High L�x-ation ofduct or s�aem Contmuous e�hausune faMs)rated ca nn m cfms /�C�l � Locauon of farNsl.dtscril+e. '"�c._-�`1' � �L. C = .�.� Ctin's C -m conunuous�enUlation race m cfms (�; "r��und d�ct OK Tota!�entilation t intennittent-contmuoas�rat: in cCms. _j '' 'metal di�ct Created by BAM version 052009 t ' . � ���� City of Orono �f%�� Hardcover Calculation Worksheet � y� �� Property Address: '�1 gj� P �}�/�s��(T Q-� l�kfSHn�� Prepared by: ��� � 5��� Date: � � `3 Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 • Step 1: EXISTING HARDCOVER . In the following table identify all items of existing hardcover on the property, keyed by letter to CeRificate of Survey(survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. Key to Hardcover Item(Descrlbe) Length x Width Total Surve S uare Feet Exam e Gar e 24'x 30' 720 S.F. A � x � � 'L oO s.F. B A fL('► G 2 x 2o O S.F. C i S '2 b p S.F. � O S.F. E L S.F. F 1 V ' � S.F. ' G T � S DOUS.F. H O S.F. � S.F. � S.F. K S.F. L S.F. M S.F. N S.F. � S.F. P S.F. � S.F. R S.F. S S.F. T S.F. � S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Existin Hardcover fl S.F. Excludable Hardcover See Cit Code Sec 78-1684 : S.F. <- L S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover OOS.F. 3 Net Existin Hardcover Subtract line 2 from line 1 ' �S.F. 4 Total Lot Area t�O�OS.F. Proposed Hardcover Percentage [(3)+(4)] L�-� ,� % (Proposed Hardcover next page) November 30,1012 1 . _�_--__ ... _ _ _... .. .... __...... ..._ _. _._._. .... .._......__.__-____....__- �%��'v� p Y '2� � 9 PF+� A S �,vT Q.p � Pro ert Address: Prepared by: � �N D y C�-��� Date: � � �3 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey(survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many • lines as necessary to accurately depict proposed hardcover status of the property. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet Exam e Gar e 24'x 30' 720 S.F. A /-1 o v 5 E �5 s.F. B v �2�G E .4� x 2� t 19 b s.F. C o2c.H 33 k' S .� I 5 s.F. � d �c�� 35 x i v �o � o s.F. E I� �2 I V E � x t'Z " '3�,c7 s.F. F w�L�s ►�a x� rax � �2�v s.F. G BG� Z'H�VSE I�- X �O � S.F. , �H E r w� �z s I 30 �x �i 3o s.F. I S.F. J • s.F. K S.F. L S.F. M S.F. N S.F. O S.F. P ' S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Pro osed Hardcover i O b 2.�o S.F. Excludable Hardcover See Cit Code Sec 78-1684 : S.F. D 125T �oo S F' oF D�C.l p p s.F. T v.i r.�-�� 5 I � O s.F. S.F. S.F. 2 Total Excludable Hardcover 2 3p S.F. 3 Net Pro sed Hardcover Subtract line 2 from line 1 D '39(o S.F. 4 Total Lot Area 4b o0 o s.F. Proposed Hardcover Percentage [ (3) = (4) ] 2�2 . (� % November 30,2011 DATE � CITY OF ORONO TIME CALLEDIN INSPECTION NOTICE SCHEDULED PERMIT NO. Z-�.Y Z— j� r�� COMPLETED —� � 1 ADDRESS ��� �h�(]<<7i1 f- (��� OWNER TELEPHONE NO. CONTRACTOR � DESCRIPTION ��� il��Y`-� � ' - ��. � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI � ❑ FRAMING ❑ �1KESHORE/WETLANDS � MECHANICAL FINAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE � TREE REMOVAL Q ❑ RADON SLAB � SITE iNSPECTION r ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. O FOLLOW-UP Q ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: W C p � Y�Yti� � � ` 0 � W � Q � Z W � W � � d � ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED � ISSUE CERTIFICATE OF OCCUPANCY � ❑ CORRECT WORK,CALL FOR REINSPECTION V BEFORECOVERING TEMPORARY ❑CQRRECT UNSAFE CONDITION WITHIN HOURS. PERMANENT INSPECTOR WILL RETURN � PHOTO TAKEN ❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cali for the next inspection 24 hours in advance. (J52� 249-46�� OwnerlContractor on site: r Inspector._ �:�;���%,�;�.k%r� � White Copy/lnspector's File Canary Copy/Site Notice ��U C� � z� f 3 ✓ rw.t.p�,, j/� TIME CITY OF ORONO CALLED IN � INSPECTION NOTIC SCHEDUIED � C? PERMITNO. � L ��~���� COMPLETED ADDRESS �� � ��'� /v�l�"�_,1 Q�rZ� �f OWNER �TELEPHONE N������'�� ����"^I� CONTRACTOR � �"�'l''- ��-`���� ; - >; DESCRIPTION � I �� �`YZ l r�� �I�C L C�`�� � lli ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SE T FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU YES_NO � COMMENTS: ,•�— � ►�s�r� � �r���t � ������ 5i.��-ur �a �� -�ls/�3 c���t, � J � � �G � (�-cJ,�4 /J �'�'9 � � � � JS.S �r Q ���T .1 � c?.� �'- � uti�' �rl�� � ,C��L Q� o-� h � � o �'c t � /�1 a'T' ��C � � ,-� ,9, S, - _ � GW ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O '6}'CORRECT WORK,CALI FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call forthe next inspection 24 hours in advance. (g52) 249-4600 OwnerlContractor on site: �, � � , � Inspector. White Copyllnspector's File Canary CopylSite Notice �—" � �(l " C DATE TIME � CITY OF ORONO CALLED IN ✓�9/3 INSPECTION NOT! E SCHEDULED 5'�-�l-1_3 � PERMIT NO. ����' ���� CO P ETED ADDRESS a OWNER TEL PHO NO.��5- 7�I- � 2 CONTRACTOR ���� ��S ' >; DESCRIPTION <�� "' ��- � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � w a � � � ," ! C �� ', � -r �.�` t �' ��C'� .� ,� 0 � � ��� ��� � /�,ti r� ��; �� I-' � W � Q Z ����f'� �-��� '-�-�-'� �V�� i )��:N � `���. �c..J' �' � t'c-� .�/Lt ��? T' /��r' j �� ���- r� �� ,�s���fjf � �� �. ��� GW ❑WORKSATISFACTORY:PROCEED � �� CI PROJECTCOMPLETE � ❑CORRECT WORK&PROCEED r ISSUE CERTIFICATE OF OCCUPANCY W �/�C.QRRECT WORK,CALL FOR REINSPECTION TEMPORARY �j� BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WlLL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED C INSPECTION RE�UIRED.CALLTO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector. � White Copyllnspector's File Canary CopylSite Notice � � ��`� DATE TIME ✓ CITY OF ORONO CALLED IN S " 3 INSPECTION�OTICE SCHEDULED S -3a-13 � PERMIT NO. �� ����2�coM LETED ADDRESS a � � OWNER T EPHONE NO��5 ��3I-D � � CONTRACTOR�-���'t-� ��� . �; DESCRIPTION v` ` � llr ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOH TO MEET YOU:_YES_NO � COMMENTS: � W a j � lJ � �� 5 � Ci r� �,/L����!l�i,� O -T � /� c� ��� . �1� C' �, � y ���' . �c:.--�x � � t�v �' � f /'��<_'�t-1 a�N (f��C� t-�..C?ci w � Z �� � -�-- n,Q �;-� �N i��� � U(' �-���c' �; -� i t �� j�c� � �, ,�A � e �. � GW ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE � CORRECT WORK&PROCEED rl ISSUE CERTIFICATE OF OCCUPANCY W O � RRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� 249-46�� OwnerlContractor on site: Inspector. � �� � White Copyllnspector's File Canary CopylSite Notice �e�— L — � 0 �/ CITY OF ORONO CALLED IN I ��-/3 TIME INSPECTION OTIC _�� .��I�SCHEDULED � � PERMIT NO. � � Gt� COMPLETE ADDRESS �� OWNER TE EP,JiONE NO � — � CONTRACTOR Q, � A ( �; DESCRIPTION �v � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/F�LLIN ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS h O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL � SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOH TO MEET YOU:_YES_NO � COMMENTS: � W � � � Q �"'y /' 1 . �g ;� ��... /� �/ l. � � � W � Q � Z W � W � j C1 ❑ PROJECT COMPLETE W �„y[1 VORK SATISFACTORY:PROCEED � ❑CORRECT WORK&PROCEED `_-. ISSUE CERTIFICATE OF OCCUPANCY W TEMPORARY O ❑CORRECT WORK,CALL FOR REINSPECTION V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN -;CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �952� 249-46�� OwnerlContractor on site: Inspector. � /' � � White Copyllnspector's File Canary CopylSite Notice �� �l�^, l��ll�,if �J DATE TIME P�ssbie CITY OF ORONO CALLED IN � ��3 �/ INSPECTION NOTICE SCHEDULED —3 � PERMIT N0.aZC�I� ' a a'�� conn ETED ADDRESS ���� r�����-� � � OWNER TELEP NE NO. � L:_�L`�.�f-����� CONTRACTOR � ���%� ����' :� / r �.,��� >; DESCRIPTION � �,���e � w��"� �." ! ���' �i�� � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEP�FINAL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU: YES_NO � COMMENTS: � W a /- O ( � �� �U � � / � � � 1 �-} � i�-.t.,�'t' � U-� � �t l ( � __ � �, � �•.��� �� Q � z w � W � � GW �RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITION WITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED �STOP ORDER POSTED.CAIL INSPECTOR O INSPECTION REQUIRED.CALLTOARRANGE ACCESS. Call for the next inspection 24 hours in advance. �95Z� Z49-4600 OwnedContractor on site• - Inspector. �� L�� �' L--*-S White Copyllnspector's File Canary CopylSite Notice _ � �r` �� ��� � DATE TIME � CITY OF ORONO CALLED IN S � T� �� j,,,��p-� INSPECTION NOTICE C.'�Z�^SCHEDULED S �� LL� —L-,�—� PERMIT N0.��-�� �COMPLETED ADDRESS � ���� �J������ �,/:Z-ol�G'���(.F��L� OWNER TELE�ONE NO. CONTRACTOR � � �� ����� >: DESCRIPTION ��f/ 7 �ti��,' C f��C� '� ��t.J�fJ"�^f� � L� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINA� ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES NO � COMMENTS: � W � � -�.. p�,- 1 0��� C o ,, �! � � � 0 � Q �� � ��./��J � G ���, s c��-E-- � � r . � � �7- .�,, ) : (t L� .� -�C�d c_.�_J �J � � ' � � �' � � A ' ` � C GW ❑WORKSATISFACTORY:PROCEETI �� � OI�+�"PROJECT COM E v���� � �.R6A&ECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CAII FOR REINSPECTION TEMPORARY � � BEFORECOVERING PERMANENT � ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTOTAKEN � INSPECTOR WILL RETURN ,_,CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REal11RED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site- Inspector. / White Copyllnspector's File Canary CopylSite Notice ��� � apTE TIME � CITY OF ORONO CALLED IN � 3 �3 INSPECTION NOTICE SCHEDULED ��3 ��• � PERMIT NO. ��� a-b��0 COMPLETED �� ADDRESS � _� �� OWNER TEL PHONE NO.�`� 3 CONTRArroR '�� ��� �'"T a DESCRIPTION ���2'������G�� W ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � � J O � � O � W � Q � Z W � W � � d ❑ PROJECTCOMPLETE W ORKSATISFACTORY:PROCEED � ❑C�RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CAIL INSPECTOR ❑ INSPECTION REQUIRED.CALI TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-4600 OwnerfContracto ite- Inspector_ White Copyllnspector's File Canary CopylSite Notice ��DATE TIME V CITY OF ORONO CALLED IN � � INSPECTION NOFlTICE -7 � SCHEDULED PERMIT NO.(�//�� �D I�(/� COMPLETED ADDRESS a 78g Oh��..� ,�' OWNER TEL PHONE NO.��Z �� Z�7O CONTRACTOR � >'; DESCRIPTION ` ����� � ���n� - �c.�`��`� � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z p INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a o � . ��vC'� -�z��' 't � � C�v� '� '��-f ��� .���� � ( I�t� �-�_S � �— � .�C.� ����' �, C',- - f� +-� — Q -� ����.t .�� ..� - �,�: �� fi-�� � � L'�l�--,. •�-<,.� . z , � � � �'���' � �� �' • (� /���;�.�— � j 'L� � i u�?t�.,.�►�- �( / �f�tlr-1 a W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W �ORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT �CORRECTUNSAFECONDITIONWITHIN HOURS. C PHOTOTAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-46�� OwnerlContractor on site: Inspector. � � 1�1� � White Copyllnspector's File Canary CopylSite Notice � �^/`� _ DATE TIME `� CITY OF ORONO CALLED IN , Z i3 INSPECTION NQTICE�1 SCHEDULED —� 3' � PERMIT NO. oz(�I�`d��� COMPLETED ADDRESS ��� � � �� ��� �� OWNER TEL HONE NO.���►� ��-'��7� CONTRA^T^� ���� �C- �� / �: DESCRIPTION ��G�.�/l,(�`� - LO�i'VU LL L� � l� ❑ FOOTING ❑ PLUMBING FI AL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEEf YOU:_YES_NO � COMMENTS: � W a � J O � � O � W � Q � 2 W � W � � a W�j�1A(ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL FETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS. Cail for the next inspection 24 hours in advance. �952� 249-46�� OwnerlContractor on site: Inspector. � �� ` � White Copy/lnspector's File Canary CopylSite Notice �� p TIME CITY OF ORONO CALLED IN " --�� INSPECTION�NJOnTI E SCHEDULED ' � - —� PERMIT NO.Q((/I�-D la D� COMPLETED ADDRESS a�f 9 ����'"� �� OWNER TELEPHONE NO. 9`�L���"�sp� CONTRACTOR d � DESCRIPTION ��x��L�•�" ��'� �"Z� � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSUTATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLA�NT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMp-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � C� � ti � n c� <S 'f3�.e-���g �Q l d w JJ 0 � � 0 � W � Q � Z W � W � � GW�lQeK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN �NSPECTOR WILL FiETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. �952� 249-46�0 OwnerlContractor on site: Inspector. �-- �� White Copyllnspector's File Canary Copy/Site Notice �AT lU TIME v CITY OF ORONO CALLED IN ! INSPECTION NOTICE SCHEOULED _��� � PERMITNO��Z���� COMPLETED �' ADDRESS d 7�9 ��Ca'-f4�►�-� /`�r. OWNER TELEPHONE NO.��2 Z�Z 7�/� CONTRACTOR �J Z�7L�l,ltl9DG� � DESCRIPTION `a"��� 4~j ❑ FOOTING ❑ PLUMBING FINAL D EXCAV/GRADING/FIWNG Q ❑ POURED WALL O MECHANICAL RI ❑ LAKESHORFJWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNERIFIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � � FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT Q O DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: � W � J �O � O W � Q � � W � j � RKSATISFACTORI!PROCEED ❑PROJECTCOMPLETE CORRECT VIfORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECdVERING PERMANENT p CORRECT UNSAFE CONDiT10N WITHIN HOURS. ❑pHOTO TAKEN INSPECTOR WILL REfURN O CITATION ISSUED C]STOP ORDER POSTED.CALL INSPECTOR p INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca�l brthe next inspection 24 hours in advance. (g52) 249-4600 ch�rnedcontracto e: Inspector: White Copyllnspecto�'s File Cenary CopylSke Notfee �Q DAZE TIME V CITY OF ORONO CALLED IN /( INSPECTION NOTI E ,�/� SCHEDULED - - !O,'D'D PERMIT NO. "O/—`� �COMPLETED ADDRESS o?7t�9 (T�Q4 2,G� ,�{L OWNER TELEPHONE NO.�� a�07 o��1J CONTRACTOR � DESCRIPTION � IU � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING y ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS J �CFINAL ❑ SEWER HOOK-UP O COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP = O DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNbATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YpU:_YES_NO � COMMENTS: E��G. l�irl�s� � oZ - 11-' �� � 1- Sea/ Su�.,�J ��A tT,��a� ��,�,�{,�r4.�� � . � � Enar t ,. o , � . Prov !f� .��8✓ a r � ,� o . �'o v •��,rl G, �. �r e.a�� � Q - � �.r fi� W _ �'�Seal ��..,n •� IDw UO/�r � .� ,,�,,� ,�_ � _ e� w-s� W j �• F�htb� �ic���r �K�wo�k�-1� �/�// " O W� ❑WORKSATISFACTORY:PROCEED �PROJECTCOMPLETE RECT WORK 8 PROCEED ❑ISSUE CEFTIFICATE OF OCCUPANCY ;�QHRECT NfORK,CALL FOR REtNSPECTION TEMPORARY V�� BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WFLL RETURN �STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-46�0 OwnerlContractor on site: 5 V�n Inspector. � YVhite opyllnspector's File Canary CopylSite Notice S� DATE TIME � CITY OF ORONO CALLED IN a�v . INSPffCTION NOTICE SCHEDULED q���'� �:d� PERMIT NO.c�fJ/a��ld��v COMPLETED ADDRESS a7�9 p��� � OWNER TELEPHONE NO.��a a�ab�� CONTRACTOR �� � DESCRIPTION �`� ���U�'""� � � ❑ FOOTiNG ❑ PLUMBING FINAL O EXCAV/GRADING/FIWNG Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y O FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ip DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNbATION/REMOVAL 2 OWNERICOI�ITRACTOR TO MEET YOU:_YES_NO v�i COMM�ENTS: � W C � � O � � � � O � W � Q � � � ` ! 2 � W � j W ❑WORKSATISFACTORY:PROCEED ROJECTCOMPLETE � ❑CORRECT VYORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CdVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pH0T0 TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALI INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 2a hours in advance. (g52) 249-460� OwnerlContractor on site: Inspector: White Copyllnspector's File ary CopylSke Notke ��iIN�.� '�1'�►'�.�— f ""t� �20,2_ a�t.�� I +9�0 �6� � � �.�� /`/ / // � i / \\ /`� ---� �` b6// / ` �I 6�� O �� ��9i ., s ee�ra-e aoae�9 o a" � Q � 9. v"..�P`� -�� �� ,�y ;.yai O �.�,A � ;� 48 -�Y.>-�. — 4 ' .. !�. - BITUAIMOUS p. __ �1... 9 � "�'�9� 1_ _�——+ / �___ : i� 93�.�__.. _,�� gf °� — =. —'wIm y�_ }9e ___ __ BENCHMARK ; -- ,.��-._. -..._ _ o-„�.._m-.�.-: , +��. I � � . > __..�._��t �o � TR SAN MH � &I , � � I :�^.N+�te-w�� ra..n�^ lY� �' I ��- ELEV = 945.3 N � � � 1�b 55 0" � �0 �e}� I �9 I ") I �I � I I � ` � % 9' � � � A� I �sti�+ l ' � � �Q � R� I ` g� i � i� _�� I N� ��;`"° I I I 9� I� � '' �� � . , a � � � I , I ��� 9� �l'� � � ; � �b�;, ��, ; , � I; �� � � + a � � � / �\ > I in � � i q � . / �� �0. �, � � � N� �� ' k § ; � + l ,m � yry� � II �' I �..� //� / 4j O I � ry�___"__..__.�I_..__'___.�J+9y'�eg�/ � N � / � .�,9° `�a I� -_._.. ry�' � �/� / I I � 1 I.... _��/ ` 16 9� `�. ? O A,q� /� I I I � *'� .�'P�4 ��$--�.\� , 9 �,�7�� 9�/ ,� � I ! - _'—Jg�}�1� '�+9 y� � � o PROPOSED ELEVATIONS �- I C �(�^ 9y' j�� ' �� T�, �'��9a'' GARAGE FLOOR= 952.9 \ I ���,5 ,� ' ,f,. ,k � Qti � yqRDCO�ER TOP OF FOUNDATION = 953.1� � ` �e � �3. , r.� �+ MA/NFLOOR = 953.69 � i i 4' ��� 9� y. 9 � � F, PROPOSED LOWESr FLOOR=943.0 � � � � 3 ._ �' +�� � ��`, HOUSE = 4061 SF \ ��� zso se� • ,� . Q, � � sp � �� DECK = 6 f0 SF � i �. �b� FPOR = 315 SF . 2s.o o �� o � � / �,�5+ ORIVE = 5300 SF 1 WALKS = 200 SF � 9 ° 9' � `�9� / `�' � RTWLS = 130 SF `�� � 6,� „a.o 3°�+� � . o� � � °t� �y � 9� BOATHO. = 140 SF � � � � � Q' �*� � � TOTAL = f0756 SF/23.4X \� I I � ��2.0 --� �,: ��y�ss 744 SF HC REMA/N/NG � � !, W f i �5, 9, r= 3TW=9320 \ \ I n�' m i. '`-' -. � � `; I�BW 9�ld0 . `�\�� w� 1 . B.~ 4.0'? 2 � Q \\\' � ' � o �-7.9eF1 � I g �g . �, � H —_ �TF� � �947 i��..-.----- , j 1/ // v _PFf1PQ3EQ_.-_ �.e . /99Q+ ZfifS 'p FE 950.O���FE=95� � I ' % 1 �+,+�� � � �E=943,0 `p � EXiST!NG HOUSE EX;STM; � �'�Y � � F �TING SE �R^ I i1 HOU;E �-- (943.0)X � : ���� . �F o � IX _ _'�_' -I� I . T g w � �.0..... � H � I:�I � 9�.6. � v 0 e I 1 -'_ ,R�' � __. �, K S� I �_.�}-�-�--��5 0>> / � L , __}-iff � 4� � ,=��. � q� JN�' 4 d� Q� � ��� 9 I f 6� I�.. � �� � I vl� I I 40� 9� _��—� �— � � MA � � � ' �t�ti? � ���� � � �s � -I ' �I+ /I � I O t9�O �T � ry,F-75�OHW SETBA LWE� �I I � \ � � ��.Q'I �' � S � ' 1 '��a� i � , ^� , , � 1 I ,, � , � i o��' .atm Im o I' I m�wN `�-�- � �' �� IN k� I \ I 1 Cs�`,m.�i m --�"�„ %� �� al I '. �-�-'F� � �� �\' �..�� . �I OI 1 / _'-.L� -. � �..\ � � ���� � I I -8°9' � -. . . ' _.\�� \, �I-. `� � \� ���� / � $� I ��4.-- ���,�� � �` � --_ ---- ,. '-9� / C�' r?�`at- � 1�----- -'-- ��\. � ---- _ �-- � � (� /� �'�-�-- ---\\\ W V ��._ _ -- �'•• -- - � -------i-_ -- ------_-- ��;ry -- - �\ --._�_ � '-��._._ �.._� � ,-"� -�r BVI�I � N� � ry1 \ _.____-'____� —..- _-�- . -------------- __-T—�— � q� ''' � � Q J — _ —.�_ �. --�---�-------- � --_.._____—-----— ------- ---- i --------- ---------- ___-- � a19 SHORELME =929.1 7/28/OS- / � O OHW 929.4 V' � Q N LAKE MINNETONKA LEGAL DESCRIPTION: J � O �ll TRACT A, R.L.S. NO 370, HENNEPIN CO., MN. m � � O ADDRESS — 2789-PHEASANT ROAD �ll ~ PID�21-117-23-32-0005 � � ��� ���� LOT AREA = 46000 SF/ 1.05 AC 0 30 60 90 X 25% = 11500 SF HC ALLOWED � SCALE IN FEET ' � = EXISTWG SPOT ELEVATION. � � ;��� � X(998.Ok PROPOSED SPOT ELEVATION � = DIRECTION SURFACE DRAINAGE VERIFY ALL DIMENSIONS AND � � � � G � ELEVATIONS WITH HOUSE PLANS �S COH = CANTILEVERED OVERHANG �� � N a � OHL = OVERHEAD UTILITY LI� � ` GFE = GARAGE FLOOR ELEVATION 1�,�;¢ N a TFE = TOP OF FOUNDATION ELEVAiION �.�,\a r LFE = LOWEST FLOOR ELEVATION N C_�� �!!� ��0� �O� 1 +9M 0 9�� / / \� % / \\ / / � ! ' `�_ Q / _—__ / ^ �9tr/ � / S C8'3B'1d^£ 1A&97 y o 4�7g �� Q ' 9°�� A�O�/ � � .�� /" � O �� 1 ✓� a' �� , /�'�H'�� f>"M�yb�9h _ ' .�A °+ �L_ --�'LO' y�q__— __._J1 � �"'h4 �; � i^ry �' `esz + 9q�-- � _ 9 �+9` BENCHMARK , + � V'f o � TR SAN MH '�ay � + ,v e.rsa•re•w �os`..�—`-".�� .� �� ,`�,,,. ��°.a., .�., 2�`:' � � ZcT ELEV = 945.3 _• b�V �Ny�O`G' 10 G �0�,9 � � �y47 I `�1 V y .. � �0� I(� I I I � 1�� .�'/// / I y� _- I f � /tGO�+� i/ I s �� . ��\ � I � �i�9 I �� � i f I f �b.�, � � / i� � I �`9,. \ '� I / / � �� + � I \ � I� �, 3 // +9�// \� \ ' � � l (�l� � �� �� �' V m � q /� ; y /� 9'y ,��o I I 9'0� \ /, . •�/� /. � � \�, �/�o,`(`y / i �"_..,,... �I � �\,/e ��-�,pi�, i� / �� � ��9"Q ; / }9,\ .� �� �0 � ASBUIL T ELEVA TIONS I i Q'1 9e'}� � �F, ,A�° GARAGE FLOOR= 954.5 5 � �p' / I rOP OF FOUNDA TION = 953.2/954.6 A'� c? ' HARDCO�ER MAINFLODR = 955.4 � � ! LOWESI FLOOR=944.5 � ii ,:'� � / ��`�PROPOSED o HOUSE = 4061 SF � � � I --' — � DECK = 610 SF 610 ^ ' oH l � / `s FPOR = 315 SF ` --- b o ; � / �A�YE = 5300 SF =� ' � 'DYALKS = 200 SF 150 � \ w .o � f g RTWLS = 130 SF � � � • o I � BOA IHO. = 140 SF ; N� i � �y'; �I, TOrAL = 10756 SF/23.4R 10 .1 \�� � � � � � �I i 3 744 SF HC REMAINING 1�. � �\ �` 5•f N � � i o �"' � ~ p „ WALK p \ \ STE�PS� 4. I }� � a \�\ / "��?� 2 .So y u1 • nj �,j 1h /.. ., \) - i o 9 _ +9._,__ �1/ / � �J `��- p+ 26.�3 � � �II 16.6 % �9 r 3 �`! �'9 I�9e^y 18.0 � s95 . 0.�i y� �T EXICTING HQUSE t�'STiNG s WAL aS �' WALL� HOUSE °f o ( � � PAVER PAT p � T '_. yw h � _ __ � I ' �9� -- 'O> . + I .. I —_' �'�� O`; � \ s E ; .� -- , 1 9 ��a� o° - 9�� �A_r—/— i i i � m�� vq°a�_�.�-� I I I � I � I 4piA � I a°/ I/' I I � �" �.—� � I �'4 U�M ��— I � a ~�,' I � I UZ�M + 75�.ONW ScTBA LINE �✓ �� q I �s�' / /I ,,J I I � \ I I Q'.Jd'" j a% � �j,j I ..��.. . �N � � � ��a� II / ol ....� ,� IN a� �^ ,I � tl�'4Z1N `�'�_��` I� I^ -.�. 1a,.p+R' I 1 64�pw O�i I I �—�� �� 1 - \`�� \ \�\ � / \\I �� � \�`\ \�\ \` --�__' ` '_~��� � 9 _I rA � I� 9 ��'�-`�._.�. —' \\`` � Z �J i==---�=`--,.—_-- ---��-- o�H , � W � __ �___ _—_'�____ ��,_ �.� 4 9}M1� I ?9�M1\.__._.__.----�—.__�� �__ �____'_�_� i . ------- `---- ----- / _�_-_------- � � J y1°'SHOREIME �929.OHW 8929.4 � � O � � N _ _ _ _ ,� LAKE MINNETONKA LEGAL DESCRIPTION: TRACT A, R.L.S. NO 310, � HENNEPIN CO., MN. J � O ADDRESS - 2789 PHEASANT ROAD m �U � PID#21-117-23-32-0005 � � � 0 30 60 90 LOT AREA = 46000 SF/ 1.05 AC Q � X 259� = 11500 SF HC A�LOWED `� SCALE IN FEET ^ 1 .09'' = EXISTING SPOT ELEVATION. a a� � ��a@�'� m q R < X(998.0� PROPOSED SPOT ELEVATION � �f � F VERIFY ALL DIMENSIONS AND � � = DIRECTION SURFACE DRAINAGE � n� ELEVATIONS WITH HOUSE PLANS � Q � oo � COH = CANTILEVERED OVERHANG ��� $ =' � OHL = OVERHEAD UTILITY LINE � <���� `� °�' �;�b GFE = GARAGE FLOOR ELEVATION � " �^8 N `0 �3 TFE = TOP OF FOUNOATION ELEVATION x �ynl� r �� � LFE = LOWEST FLOOR ELEVATION � x N���� �� y� � �>� I /-r— a �r-- ,� .�,��_�._._.__-- S�'t9"E ���7 a o �,�q�ry�( ' (((''���`• 9k5' �`..Ng� i 9• '1`�' .`�,y-"` ..�' / �.�. ��k� 9��,A � ��6 h8 --�A- - ��-.. BITUMINDUS_ _�b �.� . _ . .- 9� �� .: . - i / ��'.L P' 1' —�'4��s , � °' _� _ � ----+----._____�__�_�ti. y• -..,_. �?'+� p+9'`h BE __----�--i-----�_---�- - °` - a � e '�,`. �°i� � �.. � � �,� ,(I � � , ^N� a �8- w ioi.�:=�:�`� 9kyo TF � N I � � j�'�-;��. ,���y � �j ��� � � �; �* i � EL I�I I � I ` I I 6`Leb ��10, 1 ,O `O i.°, ;9a�9 � I _`� `A � � i �I �' I,yti`� � ' �Tf�ry { I � � �q + � �� � � . >� � � 9 � �� �; I % � X� I I 6 �� � I � �� ' _. � � � � �� � �' { � I ��,� I � / l� `; � 9 ( ► � .� � i , , , � � ..� � ' 1 r ��b�'',, i � � i.�, i �y� .. i �i ' � i I '' � �9��' � � � ��' I � �. / , � `,` u � I � � I � � f / . � � � I�� � �? � � � � �( � , � � , \�� ��\ � � �� � i ' II � _ � � �9A f II � i� � � I �I �I ( �/ � .� � � � � � ` H ' /,-/ � (. m � '� gh'�'� � ��� k.• ' � / � '� eo ; I �o �;_.____,---._...------�.���ti9��0 � � �► � , / �k �� i 1� i--•----.-___9�� � �' , 1 �6,�i y i I 1 � ' I t v���'`v �!�� �� ` ���/9� // i ! � I I�,�I,� � �Y� �:I$ ,��t�e6.�;� p'`i:f( % �.� 9��0 1 � ` f I �- =--=�AyT' „�.e� `�� tie j ( 1 � I � 9�,�;5� / � 9��0 I � � ` �1 f I�a � ��/ �F� � � � � O� h�� h � � �2 \ j � y �9�06 � o,�� �so r� �a l � HAROCO V,ER \ I �.� �+9. ��L�� , • �`��-�� ' ; J4. PR�OPOSED \ � - ��- - 9j � / Q' HOUSE = 4061 SF � ' ��:-r..�,, 2so sa� �� : �:. � ,� � DECK » 610 SF ` FP,OR = 1B5 SF ��- . ;" 0 \ ' <' 26.o c � ' � �' � i ,�y+ DR/Vf � 5300 .5F � �9 � ' ; ��, k � k� �� � 9 WAy�LKS = 200 SF '�� 9h 0• ^_,p1. � O ^,�x°'+9k0 0 �� i R/�WL� � 130 SF .,�� ��\ � � � � � 9 .: ` 9� BOA TNO, = 14d SF � � � �� � �o ',�_� � : . i � rorAt = 10626 SF / 23. � � � �T W=��9.5 8�4 SF HC REMAIN/MG .� � �y , � ,,,5 ` 9` . ' �' 3� 952.0 , � � � �� .i —� � �- i��BW— 94$.0 �_—____— � � ;, � ,� . � ' ,sy.'1.�J(?^��ZOC� ��� � , 8. !4. , k � � � � ��,� a ; �\ ,� � .. , � ._ ���' � �' '� `�) � i (� �._.,._ _ 2 5 _ _ �g4 i.°'��h.,-----"'_ � � `� - - - � __� _ , � _ � � �� by3 �k9q� 26 � � Fe sso'.oTEY' XFE=si.a*� 1^ `-6-- ��� �V � �� � . RE � i G�S � '� I k:��' � � Q T ��0 `� � � � EXISTItiC� l�i0;1�E / � 9 �' ��IN �J:;E" � / , � � . � i a°c� . �- � ' (94$.0)X o • :; ~��. Ir �,(.C�G� � I � �--� -�--� .�� I �y 35.0._.... N QEcI� :� I e�ti' /� �}�,��0���YvVv� .F9R � �n •,�yq3�jp,�\� � ,y�. ' I �9 {�_. ! � 9 � .. � ��� � � � 9k i�---���.J �, 9k1y r�ivl�td �tN�.�l ` �1 '�' b2 i J— � / 9 I t'� . / K�_. �j1 ' � ! � -----'"""_— I I Ci � 1 #� � � 1 �o o � I ; ' � � � � � I �� �O �9 � / � � '�9kry �..—.� � �--_"-- I � ./� f � � ! X . � / � � j ! � 75�4HW SE BAC LINE � 9a6ry � � � ( ( I \ � � � °�� O�,�� �� p��' � N I � I�' /"� '•-I N) ,�O J " I � 1 �/ ( � ��� 9p'� I 1 I ' � � p, \\ � `���"�� / %I. � I I _ , i —y.� \ �\ � � , I I Ig /,�g � � � '. \. � � � --i'4%a9r" �-�—_ _._.._____ � \. ��� -�. ����... ` �`�a"� \aC'. �JL l �+.. — �� +j@: -'"----�L.`--------- \\�`��` �\•. �.. - - - � �-'�� 9 � f � 7� �^ �1G4 ���� /: .-'S�� � ~�'`�'\ \ _ -- _.._ _ �� � � /�+ �g 9� -__�._ .—�_��` -_ —_�.� � •�'"�5'k---�-•-----�'...�---� BO�H' '1 � -,._..-�---�-- �..,� -- T -_ - — ---��r-�.T_ .:.. �= �-- �� 9"��'- �_��ry --`--`!"'� '-_----�- --_,���- ,�,���-��•�+�r�.-�w.��,,�ry.�} � "-�--• _—=_..�_ _.. `� g'�°j'SHOREUNE'�929.1 7/2$/08 —"/' —_ ^— OWW 929.4 L A K� MI�II�I�TONKA LEGAL DE5CI21PTION: T�ACT A. R.�..S. NO 310, H�NNEPIN CO., MN, ' -�f7'UYV�- �✓l1� i�� �,v`2— ����v 0 � +�k(� �0.61 � p6/� -._�_ � ��� � � a� ��; � �; S 89 58'18"E � 106.97 h `��� Q �' �9p�'J p�kG,�Q� / --9��9 kp�� ry a�O�b� / � '� � / 9a.�'' i ,'�t�,f, `b_�:950 �o���6�g`j SI(LT:F �_��.�.� _.. .� �-_ ._-BITUMIN�US.� � -��F s -..;�9a �. /���4 �m - ___�- __ � .. — �6 � ,' ,-_ ' ���s52_— � � � �`- r1' n , Q k L �,��� �-'-_ �5� S �5�: N a9 s •�e•� w �aJ.sa _ _ ���— ���kh BENCHMARK � ��� ' A � 9 +� / + i , � ' '� o � TR SAN MH [�E _ � �n � � ��� � ��� � � �'�;_ �°y� -� ��� ' � �,���°`� � � ELEV = 945.3 ; � I I� � �� I I I `LAO"� oih10��ft � ,o J� ,�+°� �9 i I Q I � , ��� � '��" (� ' ' I ��'' �b "9� °I�`�6 � � �C � �5�� ;�� ,�� , ����� �,�� I � �w ____ I i� -I III � I � � I 1���� Il. ��j I � //� I d�0. /�� \ I �� �� I � til ��d> I � i � � � �i I��9h r . (, '� uI� I�+� I,' � � �i . I � i ! i 1 I J n P � i � I I �� � ,I ' �`' � � I ; I '�bM�� �, �, � :+� � I; ; ' � '/� � � � ', '`� w ; ��� ; � , � ,i / � '�� > I� i " I m � 3 � ,ga� � �O � � co i �l �� (� a i� +9 i \ O� I 7 � + ,I N� � '' i � .'\ � j � $� i' �i �� . I I h I � ' O / /' , � 9h 00 � I '1. � " ��9 I � � � �o�l���- �-1-- --+�5ti�yy.� i i y � � -4°'a �dn I I 9�. . --- -. y�l,�" 1 j k i � �P�� '� I li � I I 'k�'� /�� �6�r� 95 � � t �� �e'gd � 4� I � �>r � �,'' -� � y��' � �` � �� I I �11 � �( I �� �4��6 _-Q� � I� � �= � 1;9h6 �I 5�� L g�� Q '�� �7�\ �� .._. . � ,� IJ / `. :, I I . � _.__ .,�9 L,Mp �" �' �� r , `�'.% ;� �`. .1 P RO P OS E D E L E V A T I O N S I ! ', � �h� �; ' �_9k GARAGE FLOOR= 952.9 �I 5 �� o� I ' �i � "' �/ �� � TOP OF FOUNDA TION = 953.2\ I F9ho 06 \�'h ,�,Q�.� o°� k � ' � � i HARDCOVER MAlIVFL OOR = 953.69 �� � ��,; � '+��' �'�; �j�°; a a '�ti��3_ ' � �, LOWEST FLOOR=943.0 I I i �� --- +� 9� i N � �' �� PROPOSED � I - � �"��zso sa� i'� •" o� HOUSE = 4061 SF \ _ '/ �'� � o S �� DECK = 610 SF \ i . �c� � N° 0 FPOR = 315 SF � Ih .0 2s.o o - ��` ' a�� DRIVE = 5300 SF � � , 9 WALKS = 200 SF �a�� ' �� ,�neY, o'`���"��5�' � RTWLS = 130 SF � � 6 � �2..o s�+ p e� � oQ � � I �k a BOA THO. = 140 SF \� � w ; m ,t�� m �� Q� `�9� :� � N TOTAL = 10756 SF / 23.49 �� � � '�' � �m Q �i�. � _ _ ����� � `' ��o � �20� �, ,rw=s5o.s 744 SF HC REMAINING � � ��, a � �' � BW= 949.5 V �. � W ' SA� � � 3 TW= 952.0 �� p __ �i v� i I�tiBW= 948.0 � v �� � q7 _ �_. - � v r \ i i � �' � � �11 8 � �4'�� � _E�o-P�(2GN_' i� � o .�� ��' ^ • �, & '� .. "?_�� o�2(3 5 0 ' � o ' `� ��� 2 i o \ '� �.0 c.i� �7.5 10� � h k�5 N ," ,lil � � �� a T� =g 2 _p �$ 9a7 �A o� o` � _-PROPO�EP� � �ee ' �90+ zs:3 a�; v ;F��So.oTEYNOR X�E=s zo� � I _ -- '� �� '. Q � o RESIDENCE� �, o � ��'�� � �� I ��� , LFE 943.0 •�y � 24 I�i� �U_t r �Ti�J�_; ��� � e�`� ': � i ��i f� 38'��_.,_ � �,.. ,I �a'i, � �'__ � rn :i, � . (943.0)X o .0 OJ� ��' _.,, �n � ti .PORCN � �b I �-� \ / �, Iw Z 35A '" H ECh� , i., � � a� 5 30: -� I ,, 90.� v> 9- � ��A � �, L°j�� �rFF,;'�1�ER��' Pos�9ay���I, � I —_ __ —`- �-`--9k ���a �� i, �ti1` �i �� c��i K2_�_-{ �r I � i. �o� " 9 ! =�+od- --/oEF � I �I� � i � �p� gh°� _ __�-- - �� ���� � � R �R� � �'I�� � I � j �p`n — _� _ � �'o� I I _Iati i aSJ -� ���k6� �� ,: t �y �=� , �'Zl U�� $ I I � � � ��' WO -S%L T F�N� � � i C�z�M L� 75�OHW�SETBAC.i LINE . 9d�.0 X�I I � ,\ �a � 6- O � �iJ�'d' �� �a�� I �� �I I � � '�� ��� I'� � � �� �Iao Ip� �� I � �d'W N __ ' � ' _. ! �I' �I�- I`V ' .a�le�N�- I , , �� ', ry��m � �; ti � ( !I al I _i-��� � \ ��,._, , � _ I � �` I ol I / L_--- \\� _ � _, � � � � j� I ,ol -�"4'"e�q� � _ _ � , ,_ a I � � '_'.__ n�� �= - �--�- - - -��� ��� �; - ---�- _._ _ ��� . ' , � v - "- 9 " �B9I2 E� � ( � -� �._.. .._. .... I . . 7' � � //�i t 34..�,9.��,._,._._.__� � __ �__ _.. \�� -_ � �) � - '_. - - , P� .. CON�y � . ._____. I 1 1 ... ... ------ . �����0��.- � -_. ,�y 8b�BOAYH .::��� �"'L� I +`��ry,. . _ .. �--- - .._ .. _ --- _. ' _. �1 - _ _ __ �i_ � � - -- � _ g� . � - �� � � p � �.=.=_=R,�A��-_��- .P --� - - -- ---. - - � �'t9 SHORELWE =929.1 7/28/08 � J � � � ,; O OHW 929.4 � `�I � � 0 �j LAKE MINNETONKA TRACT DESRRISTINO 310, O � O � HENNEPIN CO., MN. � � � O ADDRESS — 2789 PHEASANT ROAD �) � PID#21-117-23-32-0005 � � ��� ��'� LOT AREA = 46000 SF/ 1.05 AC o 0 30 60 90 X 25% = 11500 SF HC ALLOWED ''� SCALE W FEET ° w �` U a�wN �99ti`' = EXISTWG SPOT ELEVATION. � 3��� o � 2 '�', $ � X(998.Ok PROPOSED SPOT ELEVATION VERIFY ALL DIMENSIONS AND v a o � g = DIRECTION SURFACE DRAINAGE ELEVATIONS WITH HOUSE PLANS �a N m o a "� COH = CANTILEVERED OVERHANG ' � N ��" �O z u (V °' � OHL = OVERHEAD UTILITY LINE a��i � e r��� � GFE = GARAGE FLOOR ELEVATION �^�� g N w=aw �� TFE = TOP OF FOUNDATION ELEVATION ��;� r � m LFE = LOWEST FLOOR ELEVATION N��� '" � ; wmF� � o w �ao� o�o�� ___._. _ ___..r, ._, : .S V9�S8� lg�� E «�0�9� �. „- �� ���h�� o,h6,l�P�%� / �- `— �O�' 0� � -' � �`l' _ _ / � �" P�- .S/ �.. O ....__.._,�._..__. _ _ , --- _...... ._._ ._.. ... _ . _ . . � . �.: .___ _ _ _ � _ .. _�_._. .._- - -- ---- - ---_ ....._ _._ _ _ ._._ ___ :��� �}�, __. _. �. � 6���--=-= ,, �,-� �- �- �-T �, ..Y _ ._...... _. . :...�- �..�_= _. __ . _-�.�� , � ��`�' � / ,,;�.--•- �50 E �-��— _ ,��, �-•_ � BITUMINOUS �4�i ORIVE `.�_.` �,r� �r� — , � . r ��-�_.^— -___. ' / �/ �� h '- -- _._ __--- o�_ , ,, .�. rn _ � -^� - ��°�j °'�`h :' , , �_._.-- _�_:� � - - ._ ��- / � ,; �Q����� / ' ,i ( _._. ...._ ��h�'� S" �� - -- - �'_�: ---- . _ ��9���°`� o B R , _ - . __ _ _ -- , � �� ; ^ h�,. .� ' � i � �� � N 89 b�� �s�� w �a¢.�t_., _ �k�� � � ELI � � �i �� i � ' ' � �'' ���e�... ,`���� '� ,c�� ����� ,' � ' � �i I I �� � i ! ' 'r I I rZDc� o'�j1Q 1 10 10 �0 ` .i 9�1°� i � � ,! �; � � i I � I � � �' !�� !I � � �� °� 1.���. `i � � f ~ J i ; ' 'i � �2 , °`l5 Q; , �, � ; , � i � � ,, ! ; �' � � � ; I � ; � ; � If� � � ,,�..� � ' v�� � � % '� ; i �;� �'�� � (`' ' �� � �� f I ��, I� % : � � i,� �• , I � i ' � �. �� � � , !�� ; � ; ; � �; �+����:� ; r� i � 14. '�, ; W � � ti:� ; ; �v � �� ; 1 j ; I � `` Ji ' W,� � I^�' ' � i '� �%- , � � -- � w� ,�� � � ��; � ;; � j; I ,� ; ��'\b��� i �" ; .-, ; ' 1` i' '' '`� � i' ' '"�� f � � � r�� i ; ;� •� ;�` � t I �� i ��� 1 � .� � ! �! % � i `� � I Z` � � I � � i� � i �♦ i \\ i �(� + �`� � i ¢ � i �I �' / �J \ .'� \' / t ( Qj � j ln i i `�, � I I ;> ;i � i y, � � ! � �� 3 � / �o,D��j �'� ,. ` � I . Q ' � �i � ,:' / !,; i i i j� � N � � �, � i ^ /� / i, j �; : t`'� m ;i ; � j $� ' �l �'� /i �l' / �. � . � I ! h�'� � � �� �;� / ; �; / /;, i ; �i ;ii�g____----.._._._-- _ � �`����� '( � / � �, �� � 'V �. {___--- --._..--------�� � �,, , ; �h �o � � g�o., ��,. -� � �,. (F;' �, i ��` I; � I' i •7- -.._ -------�o,�'� -� .;� 1 �� ! ,Ap��'/ / i , � �� j 6`�'r� ��� �,, I / � 2 ; � II � � ..:'v � � %-�. �� O D��' 0 ! ; I �' i ��:.- -_ � ��y� _..� �` %� � � ;f � � � � �: i ; ` � I •.�.:' ; � � � I�`�:i� ... ` '��o � i ;1j1 ' 4�`.. � / ,\F� � ; I ��, '�.� �, j � ,�; __ _., �� 2 ,a.��,._....�Q� ; I;� , i ;, , • i � �� � , ' �� �-- - � � � __ _��5?� �p� '� �ya� �I __...__.._.__..� 1 �, I q ,' ' �..._ ' . i ; ' �`l 9��-y'� ' ,1'� / ;; � ,/i; 9k�O i� , t �„ / � _ \ I ;! I •, ; I�:.� �' ;� / p.-' �' �' �! 5 � �'� Q�. � � ! �,, � �3.2 � ��� � � �'`���' �, ��°Q '"� ' ' c:'� % i HARDC4VER \ I � �1 �°. ,�,P .y o�� ; , -',' �� �9 � � � �� � r` l f w PROPOSED � �: ,�. , ; ��-^ .� ' k ',, � � \ i: �--...__._.._. � � �. ___.��- ��;� �� + ��� ! ,,'� �` HOUSE - 4061 SF \ i / -� I 250 SBL ��`� � � :. ,� � DECK - 610 SF ::;��� , ,� �� _ i � i ► �i�-� ' ; °o•o '' �� FPOR = 185 SF ' ` Q ;: N h ' J �'+ '� i �� DRIVE = 5300 .SF �� .0 26.0 o Q� �. � �� f; I N , ,�� ;�.,. i� . � �°` WALKS = 20D S,� ., � a�� ,� ��: e � o'�'e�����' �l'+��°` � ��: r� ; ;' RTWLS = 130 SF �\ � � ��' �� °' �;� � � �� Q� � � � � : � � BOA THO. = 140 SF '^ N o 0 , :. �°` �, � � � �� �� "' � � � � ,� ���� N TO TAL = 10626 SF / 23. ,. I � I� �I � � ��;' N •'�_...._ _-'�' / i f � N � ', I '; Qi � Q ��-`� z�y � " ! � •�"� � ryy=g.5�.5 � n - a7�t .�r 'nC n�'�ii�iHiidii'vv �,` ; ; � ' �;� QW= 949.5 � ` � �`" ° ' �� 5A � � °� %" , ��i` 3 TWV-- 952.0 �. , '` �''� I = ` � ,>' - -----._.._ �= B - 948.0 _ ._____ _ -------------.� � � _-- � /"�/�,, �.r_...�i �.. \ \ N :? � � � +i:: I � �— OI (�V lY '\ \ � , , � i;' ! S'" s ;, ;�..��_ ... � � w � � { �� '�. t� � �� �'� � � ��� \ i �� !4.� pc �. p� ` y � � �� 1�. 8. { � i c� ' �� � i' � �\�` �'� '� �., ' r�'QS�? q ;2 �r� � � c� � ,�/"�/�/�;(�' / U' � ,, . � � � , , , , . ; ,. �, ,) � : a -ui____ �..___ _ _...__._ � �� � � , . � I , f �_ �..� .� _._._..��1'� �= �:2�=-=-- _ +.._._.... ----- �� . . . ; , .. r7 (.._.__.... ..ca �g47 °��` , � , , � ; -- .. . ._ ._.._. -.-. � � . , - -/- ' ' PROPQ � ���' � ------ ���._ �.� .. - ,,� � � =+ 26i3 � � � � TEYNOR x -----3:4�,:. - . �� ., � �JI�S �� �� �� ���� ; °� F� 9so.oRES/DENCEFFE=952.Os''!' � ,___._ i � ,�� ��1 1 0 _LFE=9��0 `S's Q� � .�'` I E::r.:l;:>�!ivC; ! ��;��;i:>�:: / ,, ( �o� � �; � F> �; ���C;38`. `..;'�;E:: � J , �,�2 . ; �a� .� �... r,�, . ' �' � � (943.0)?C o .0 :, � ���,��.�C� �/l� -,_-.-, : ���,,. �_____ � , , ___ v� PORC�L----<o ...�--..1.-� :�� I h ;J Iw ` Q � � 35.0 '^ H pEdt��, E :, � ���y`� �� ;/� �2��0�� �✓�'�� ; � ( '•� `^ ��k�• ; i �� '...�..9k3 Qp,-��Qj� � �� .y�� �!� � I _.._--- ` � �'e'�/��c N �1?`�t,y I + ,-Q �. __ F�' � �; ___----- � ,,� a 1 � ... ..,-_*,ti �� ;� I � �, ____.-- � j �� I ��� + �..�:. �� a�� ;pE �--_ , �� � j '� - 9 � '-`.• - - -____:�p�... / � K ( J4; � i i ___-- _____. ;; i �6 ` 9� � �' I � i ; � ��� . ' ``^ �,�o � � ;I �.1 ati� r � '� �°;0,�6� � I � I I . :, +g , _�-__._._.,.. I � � � -� .- ---- -.. �1 � � ` ; `_�:-� � , ' ,-S%L T ffEIVC�'�� ;. '� - I . _ � ,.,_. ....: _-� -.�: . . , s� ��� �\ 1 t �+ 75��OHW SETBAC LINE ,i X �41. ~"' � f ; � � �� i � ,.� � i � �D� �y'' � �,, � � I � • I p'D`%Q) �D�� qQ� N� cv i t i I I I �,' �� �/ � � I r i � � �ti� E I t '� � f' I I 2�,Q�� I o1 ,\ `. 1. � � �� ., . � �......... � � ' I I I _.._- �., `�` 1 ._,-. — ���_... ' ! .. -- � , `.,.. � � I I I � � \ �. � _..,^ , �g�� _ .. __�--- �- ------_�---�- -- � ._ ' ' I I kg��.. _ _ -- , �.. � , ( 9��. �. _ - / . -_ �...-� '• , � ; 6 _.__..._ --�� _ _. .. . � _ ._ _ --. � ; I � , - `,� ;. " -.__ ...._-_..._..._____._, � . � ��o� —�-- — �- �— — � —. ����'- -�,/ �'�--.._ � 9, 7� �—, �j� _._..--- � � _� _. ,. L_.. _ _._- 2 1pp � � I �. _ .._---- - . ._ �._ . _,� ---_... _..�- I ��.,, ` _._._.... , � � -_._._°� �- � _.�.__ _�__.._.. , - _.___ : , : _ _ _.__..__... -_ Q� - ------._,_ �. --_ _-- - - . �..__--.-.. -- � _..._...__. ., . _ , _...--.._...___-- _._. �,�, ., _..._� . __�_.._.._. -� ...,_.._..... - - --- _, ..,_._._. — t� ..._I- �_.. N . , . - — '�:�_ ..__.---- BOA�H:.:� �� �,� ._ � __.. ,' .. ._.___..._.. ._. �___- ,, � ' �--��,.. ... _.�,.�;'_ _..__...__._ .__._. -- __..._. ...----._... ._.____... ._._,._.__._._....._.._ -- ---.._....._.__.. . --..._--_-...__.._.__.._...___.__._.-�' . ___......-- _ ,-l___._..�-��-� � _.._._.__ . . �� �.� . __ . --____..._...__.--.._......_..__. ��-- __ _ ______ � - .._. ___., ---__-_- --- - ----.._,._.._._ _...---...-- — .__ T T �. _ �� � - --�---- -__ . � .. __ RtRAP -- - --- � � — - - - - ` _--_....__--.....__ _....._......�._.._._...._._�.._:__ _._.._ __._.__------ ,.; .. � _ _._ � . .. � . _ .. ----.._..._..._--- — — — — — — — ,.�.._�-.�,.�..._-�.-��.��.�� _. _ � ..._ _ �`���SHORELINE -929.1 7/28/08 r OHW 929.4� � L.A K� MlNI�I�TONKA TRACT DESR RI ST'I�0 310, , H�NNEPIN CO., MN, ' . • : • • � • , en� o To: Finance Department From: Christine Mattson, Planning Assistant ��I R(� ��� �. CC: Stree#File Date: September 1, 2015 GIL: 101-22205 Re: Escrow Refund Building Permit#2012-01206 pertaining to 2789 Pheasant Road is complete. Please refund $10,000 to the property owner, Joseph &Gail Teynor. The following is attached: • Original�igned escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Jqseph &Gail Teynor 13225 Cardinal Creek Road � Eden Prairie, MN 55346 w:\street files�pheasant road�2789�escrow refund 2012-01206.doac TEMPORARY CERTIFICATE OF OCCUPANCY � ESCROW AGREEMENT Orono Building Permit#2012-0120B Land Use Applicatbn#12�3665 At3REEMEMIT made this�day of � , 20�, by and between the CITY OF ORONO, a Minnesota municipal corporation("Ci#y") nd C3ail M&Jose h T.Teynor("Owne�s"), i Recltala 1. Construction of the new residence located at 2789 Pheasant Road the ("Subject Property"), legally desc�lbed as Tr�t A, RLS No. 310 in Orono, Hennepin County Mlnnesota, is the subject of building permit applicatlon number 2012-01206 has been com�leted. 2. WiMer conditions currently prohlbit comptetion of exterior improvements, final grading, and vegetation establishment. An as-built survey cannot be s�ccurately conducted at this �me. 3. Ow�ners request the Ciry issue a temporary csrtificate of occupancy ("TCO") to the Owne�s so that the Owners may occupy the new residence. 4. The City wiil issue a TCO only if the Owners establish an escrow to ensure compietlon of exterior improvements, continua�on of erosion control and submittal of an as-built sunrey to the City. NOW THEREFORE�THE PARTIE8 AOREE AS FOLLOWS: 1. DEP�OSIT OF E3CROW FUNDS. Contemporaneousiy with the execution of this Escrow Agreement, the Owners shall deposit 510,000 with the City. All axrusd interest, �f any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is t� assure completion of any exte�or improvements, final qrading, establishment of vegetatlon as well as guarantee reimbursement to the City for aU ou#-0f-pocket costs the City has incumed (including pianning, engineering, in exc�ss of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is cximpleted in acc�ordance with the Stormwater Pollution Prevention Plan and the provisions of Orono Ctty Code Chapter 79. The financial security may also be used by the Ciiy to ellminate any hazarrlous conditions assocfated with the work and to repair any damage to public propert�+ or infrastructure that is caused by the work (including planning, englneering, or iegal cansultant review) associateti with bullding pennit #2012-01206 if compliance with the approved building permit is not accomplished. S. MONTHLY BILLING. As the City receives consultant bills for incumed costs,the City will in tum send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' recelpt of bilL a, DIS�URSEME�IT FROpA E3CROW ACCOUNT. In the event that the Owners do not make payment to the City wlthin the bmeframe ou�ined in#3 ebove, shall issue a Stop Work Order urrtil the Owners pay aN expenses invoiced pursuarrt to#3. The Cfty may draw from the escrow account without further epproval of the Owners to reimburse the City for eligible expenses the Cit�+has incurt�ed. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written ncrtification is received from the Owners requesting the funds. 155441 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid batance to th�subject property pursuant to Minn.Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY, The Owners hereby grant to the City, its agents, � employees, officers�nd contractors, the right to enter upon the subject property for the specific purpose of inspecting and completing any exterior improvemenfis, final grading, establishment of vegetation and the restoration of the subject property should the Ovmers not complete the work by the specified dates. CITY: CftY OF ORONO OWNER�n : �� By. �� � 0 - . I ►1' � 155441 � � � CITY OF ORONO * z 0 1 4 - 0 0 3 e 2� 2750 KELLEY PARKWAY DATE ISSUED: 04/29/2014 ORONO,MN 55356- 952 249-4600 FAX: 952 249-4616 ADDRESS : 2789 PHEASANT RD PIN : 21-117-23-32-0005 LEGAL DESC : REG.LAND SURVEY NO.0310 : LOT 000 BLOCK 000 PERMTT TYPE : ESCROW FEE-APPLICANT' PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-APPLICANT NOTE: THIS$7500.00 ESCROW IS COLLECTED FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY. APPLICANT ESCROW FEE-APPLICANT 7,500.00 ESCROW FEE-DEVELOPER 0.00 TEYNOR, GAIL&JOSEPH TOTAL 7,500.00 13225 CARDINAL CREEK RD EDEN PRAIRIE,MN 55346- Payment(s) CHECK 8050 7,500.00 � � OWNER � �it of th^onrr I � � N,el le�,Parl�aay I TEYNOR,GAIL&JOSEPH � aro� '10�t 553�6 g��qy,�r� � 13225 CARDINAL CREEK RD ; f�i� No: 3�4f�f -: 2;', �;4 1 EDEN PRAIRIE,MN 55346- � - �'� , j. � - , . . . . . I �+121 �E'}f3'lp�t' � F. I. _�'!�.a1i�t1.Y! c� Y�W�71 � RW AGREEMENT AND SWORN STATEMENT I, r�j,y C;�, �� ..��78g:. 7�;�,1.4� The work for which this permit is issued shall be performed according to ���" �; the approved plans and specifications,applicable City approvals,and the � '���� ' I �'� �f&rreti:����r;Il��sit � State Building Code. This permit is for only the work described and does ' , . not grant permission for additiona►or related work which requires separate 'E��{, �'.� ��� + rmits. All rovisions of laws and ordinances ovemin this �". Pe P B S tYPe of work -: , ..�,.:�.._�..�.,.:� � shall be compied with whether or not specified herein.This permit will �`: � expire and become null and void if construction authorized is not '� �� �°�£ t�� �s�a� � commenced within 180 days of the date of issuance,or if construction is : ,,��`4Y� suspended for a period of 180 days at any pme after work has commenced. � �' ` } �p �� �. The applicant is responsible for assuring all required inspections are �; "',+�A�� �p�X�Y�E�y '� �w*�,�;� � requested in conformance with the State Building Code.This permit may be i ; ` �� _ 'I revoked at any time for due cause. i;: �„i"'i�1fl�L ?���t'�d;. ��j(�w I �;� �� � ...,.,r,.�cY�_:. � �-. ,;�t���t�}�.�t �L:L3� " , � � . i � Applicant Permitee Signature Date '�- � , � i , � i , , . , BUILDING PERMIT ESCROW AGREEMENT Land Use Applicatlon#12-3565 Orono Building Permit#2012-01206 AGREEMENT made this �� day of Nl,�!'G 20f�, by and between the CITY OF ORONO, a Minnesota municipal corporation("Cit�')and Gail M.Teyno Joseph T.Teynor("Owners"). Rec 1 1. A building permit application has been filed for construcfion of a new home located at 2789 Pheasant Road, the ("Subject Propert�l'), legally described as Tract A, RLS No. 310, Hennepin County Minnesota. 2. Owners request the City to review this application. 3. The Ciry will commence its review of the application and incur costs assoaated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FO�LOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement,U�►e Owners shall depos�$2,500 with the City. All aaxued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow acoount. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-podcet costs the City has incurred (including planning, engineering, in exoess of $5�, or legal consultant review) or will incu� in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance witli the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The finanaal security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work(including planning, engineering, or legal cansuitant review) assoaated with Land Use Application #12�565 8 Orono Building Permit#2012-01206 if oompliance with the approved building permit is not acoomplished. 3. MONTHLY BILLING. As the City receives consuftant bills for incurred costs, the City will in tum send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above,shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approvat of the Owners to reimburse the City for eliglble expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if �ny, shall be retumed to the OHmers when the review has been completed and written notfication is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners,or if the eligible expenses incurred by the City excesd the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn.Stat.§§415.01 and 366.012. CITY: C OF QRONO OWNE �� �� By: i�: � � , 1rrt�mal tlse onlyr; '` G!'�rigin�to P#anMAg: D CoaY�:��►� ��PY�o str�ersc Fiie . . , , APPL)CATION ESCROW AGREEMENT Zoning Application���, - 35lp.3- AGREEMENT made this��"Z�ay of -JUI�J�E' , 20�� by and between the CITY OF ORONO, a Minnesota municipal corporation (`City")and �a,i I TY�l YLOY [a corporation-optionalJ ("Owne�'). Recitals 1. Owner has fil Zon'�plication#�v�, - fo ly reques' the City review plans for located at the"Subject Property")as more futly shown and described on Exhibit"A°attached hereto. 2. Owner requests the City to review said plans which requires City approval including � 3. The Ci#y is wiiling to commence its review of the application and incur costs associated with said review only if the Owner establishes an escrrnv to ensur�e reimbursement to the City of its costs. NOW THEREFORE,THE PARTtES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Cvn#emporar�ously with the execution of this Escrow Agreement, the Owner shall deposit$_� � with the City. Aii accrued interest, if any, shal! be paid to fhe City to reimburse the City for its cost in administering tt►e escrow account. 2. PURPOSE OF fSCRQW. The purpose of the escrow is to guarantee neimbursement to the City for all out-of-pocket costs tfie City has incurreci(including planning, engineering, or legal c�nsuitant review)or will incur in meeting with the er, rev+ewin the pfans, and preparing agenda packet materiat for City Council review of application# l - �. Eligible expenses shall be consistent with expenses the Owner would be responsible for under a zoning and subdivision application. 3. MONTHLY BILLING. As the City rer.eives consul#ant bills for incurred costs, the City will in turn send a bill to the Owner. Owner shall be responsible for paymerrt to the City within 30 days of the Owners receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUMT. In the event that the Owner does not make payment to the City within the timeframe outlined in#3 above, the City may draw from the escrow acxou�t without further approval of the Owner to reimburse the City for efigible expenses the City has incurred. The City shall notify the Owner of such draw and the nature of the expense for which the reimbursement is being made. If the Escrow amount fatls beiaw 75% of the original escrow amount the Ov►mer shall deposit additionat sums as directed by the City, or the City shall discontinue all review. 5. CLOSINQ ESCROW. The Balance on deposit in the escrow, if any, shall be retumed to the Owner when the review has been completed. 6. CERTfFY UNPWD CHARGES. I#the project is abandoned by Owner, or if the eligible expenses incurred by the City exceed the amount in escrow,the City shaA have the right to certify the unpaid balance to the subject property pursuan#to Minn. Stat. §§415.01 and 366.012. � CITY OF O OW R t BY� ` .. $ Its: ' Its: Varianc:eApplication Updated: January 31,2012 - 11 - ' �' ' •' � � CITY OF ORONO * 2 0 1 z — 0 0 5 s 7 * 2750 KELLEY PARKWAY DATE ISSUED: 06/20/2012 ORONO,MN 55356- (952 249-4600 FAX: (952 249-4616 ADDRESS : 2789 PHEASANT RD PIN : 21-117-23-32-0005 LEGAL DESC : REG.LAND SURVEY NO.0310 : LOT 000 BLOCK 000 PERMIT TYPE : ESCROW FEE-APPLICANT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-APPLICANT NOT'E: ESCROW FOR ZONING APPLICATION 12-3565 ESCROW CHECK FOR$2500.00#9l I S ALEXANDER DESIGN GROUP INC. APPLICANT ESCROW FEE-APPLICANT 2,500.00 TEYNOR,GAIL&JOSEPH 13225 CARDINAL CREEK RD TOTAL 2,500.00 EDEN PRAIRIE,MN 55346- OWNER TEYNOR,GAIL&JOSEPH 13225 CARDINAL CREEK RD EDEN PRAIRIE,MN 55346- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. T'his permit is for only the work described and does not grant permission for addidonal or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construdion authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at y ' for due cause. � � � ���� i i Appli t erm� igna e ate Issued B ignature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.