HomeMy WebLinkAbout2010-00080 - escrow fee . CITY OF ORONO PERMIT NO.: 2010-00080
� 2750 KELLEY PARKWAY
, ORO , MN 55356- DATE ISSUEn: 02/12/2010
952 249- 00 FAX: 95 249-4 6
ADDRESS . 2655 SHADYW D RD �L,.�}� $�-X�
PIIV : 21-117-23-2 023 �'�
LEGAL DESC : PHEASANT LAWN
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RES[DENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: ESCROW PAID 2/12/10 CHECK 8147
BUILDING PERMIT 2010-00069
APPLICANT ESCROW FEE- BUILD[NG 2,500.00
HADDEN,JULIE& TIM TOTAL 2,500.00
2655 SHADYWOOD RD
EXCELSIOR, MN 55331-
(612)669-5602
OWNER
HADDEN,JULIE&TIM
2655 SHADYWOOD RD
EXCELSIOR, MN 55331-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and docs
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenccd.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revo any time for due c s
r �
r � I� i Co
� �
ppl�cant Permitee ignatur� � Date Issued By � nature
SEPA TE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOV .
' ORONO BUILDING PERMIT ESCROW AGREEMENT
Demolition Permit#2010-00070 and Buiiding Permit#2010-00069
i
A�REEMENT made this ��- day of �C.br�a^'y , 2010, by and between the CITY OF ORONO, a
` Minnesota municipal corporation ("City')and Timothv&Juliann Hadden(°Owners°).
' Recitais
1. Permit applications have been filed for demolition of the existing residence and construction of a
new principal structure located at 2655 Shadvwood Road the ('Subject Property"), legally described as: That
parf of Lots 22 and 23, `Pheasant Lawn"tying northerly of a straight line drawn from a point in the southeaste►1y
line of said Lot 22, distant 27 feet southwesterly of, measured along said southeaste�ly line of said Lot 22 from the
northeasterly comer of said Lot 22 to a point in the northwesterty line of Lot 23, 'Pheasant Lawn", distant 30 feet
northeasterly of, measured along said northwesterfy line of said�ot 23 fir�m the mosf westerty comer of said Lot
23, Hennepin County Minnesota.
2. Owner requests the City to review these applications.
3. The City will commence its review of the applications and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owner shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owner would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the worlc is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the woMc(inGuding planning,
engineering, or legal consultant review) associated with permits 2010-00069 and 2010-00070 if compliance with
the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owner. Owner shall be responsible for payment to the City within 30 days of the Owner's receipt
of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owner does not make
payment to the City within the timeframe outlined in#3 above,the City may draw from the escrow account without
further approval of the Owner to reimburse the City for Eligible expenses the City has incurred. The City shatl
noGfy the Owner the Owner of such draw and the nature of the expense for which the reimbursement is being
made. If the Escrow amount falls below 75% of the original escrow amount the Owner shall deposit additional
sums as directed by the City,or the City shall discontinue review and post a Stop Work Order.
4. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be retumed to the
Owner wrhen the review has been completed and written notification is received from the Owner requesting the
funds.
5. CERTIFY UNPAID CHARGES. If the project is abandoned by Owner, or if the eligible expenses
incurred by the City exceed the amount in escrow,the City shall have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat.§§415.01 and 366.012.
CITY• ITY OF ORONO OWNER:
By: By: � Z
Its: ��.r�_..rL. .� ��[..c�-o,r B '
tMtism&1 Use O�ly� :',�';.. O Qriglnal,to'Fina�tce DePs!rtiner�t ;:�: KI.�oPy�a!St�bet.File