HomeMy WebLinkAbout2010-00401 - escrow fee �
E CITY OF ORONO PERMIT NO.: Zoiaooaoi
2750 KELLEY PARKWAY
ORONO,MN 55356- DATE ISSUED: 05/27/2010
952 249-4600 FAX: 952 249-4616
ADDRESS : 915 PARTENWOOD RD
PIN : 08-117-23-21-0011
LEGAL DESC : PARTENWOOD
: LOT 002 BLOCK 003
PERMIT TYPE : ESCROW FEE-OTHER
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-OTHER
NOTE: PAID BY CK#35058 STEINER&KOPPELMAN FOR ESCROW FEE-CONTRACTOR PERFORMING UTILITY WORK IN CITY
RIGHT OF WAY
APPLICANT ESCROW FEE-OTHER 3,000.00
SAFAR,MARY TOTAL 3,000.00
925 PARTENWOOD RD
LONG LAKE,MN 55356-
OWNER
SAFAR,MARY
925 PARTENWOOD RD
LONG LAKE,MN 55356-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for on(y the work described and does
not gant permission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ / / /
Applicant Permitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�
ESCROW AGREEMENT
AGREEMENT made this 21 day of /�,� , 2010, by and between the
CITY OF ORONO, a Minnesota municipal corporation (` ity") and Steiner & Koppleman,
LLC, a Minnesota Limited Liability Company("Contractor").
Recitals
A. Contractor will be performing certain utility work on property located at 915
Partenwood Road, City of Orono, Hennepin County, Minnesota ("subject
properiy"), and will include disturbing the City's right-of-way with Partenwood
Lane and Partenwood Road.
B. The City is requiring this Agreement to guarantee the required site restoration is
successful.
C. Contractor has agreed to complete or repair the items cited above in a timely fashion.
Contractor has agreed to provide financial security for the completion of the items
cited above by entering into this Escrow Agreement.
D. The City has determined that this Escrow Agreement constitutes adequate
assurances from the Contractor, sufficient to protect the City from potential damages
and noncompliance with the City Code.
NOW,THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FLTNDS. Contemporaneously with the execution of this
Escrow Agreement, the Contractor shall deposit $3000.00 with the City. All accrued
interest, if any, shall be paid to the City to reimburse the City for its cost in administering
the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee that the
restoration requirements associated with the disturbance of+.he City's right-of-way are
completed properly in accordance with City Standards. The funds shall be spent by the
City if the Owner, for any reason, is unable or unwilling to honor the requirements of the
City Code. Construction costs may also include engineering assistance as well as labor and
materials for any repairs necessary.
3. DISBURSEMENT FROM ESCROW ACCOUNT. If the City suspects ar knows of any
matter cited above that is not completed correctly and in a timely fashion, it shall first make
demand of the Contractor to make any necessary repairs or to take other prudent remedial
measures within a 5-day time period. If the Contractor is unwilling or unable to honor her
agreement as determined by the City,the City may draw from the Escrow Account, as
necessary. The remedies afforded to the City under this Agreement shall be in addition to
any other remedies which the City may be entitled by law or equity or other agreement.
isi4io�oi 1
�
f
4. CLOSING ESCROW. The escrow, less any eligible expenses, shall be returned to the
Owner after one freeze/thaw cycle or as determined by the City Public Works
Superintendent. If plantings are a part of the restoration and if substantial portions of the
plantings are not successful after one planting season the City may hold the escrow for an
additional planting season. If substantial portions of the plantings are not successful after
two planting seasons the City may hold the escrow for two additional planting seasons.
5 ACCESS TO SUBJECT PROPERTY. The Contractor hereby grants to the City, its
agents and its employees, the right to enter on the subj ect property for the specific
purpose of inspecting or completing the restoration of the subject property should the
Contractor not complete the work by the specified dates.
CITY ORONO
By: `---'
Its
CON
��
Steiner&Kopple , LLC
151410v01 2