Loading...
HomeMy WebLinkAboutRe: survey Christine Mattson From: Christine Mattson Sent: Tuesday, September 01, 2015 7:45 AM To: 'Mark Way' Cc: Mark Gronberg; 'Timothy and Joan O'Donnell'; Melanie Curtis Subject: 559 Park Lane/#2015-01001 Attachments: Survey Requirements-August 2015.pdf; ROW Permit App.pdf Mark, The City Engineer has reviewed the survey dated 8-12-2015 and has the following comments: 1. The plan proposes 2 driveway connections to Park Lane. City Ordinance allows for one per property. The larger of the curb cuts is depicted at 29 ft wide. The maximum width for a driveway connection at the street is 20 ft. 2. Plan proposes work within the right of way to place a new culvert. The old culvert should be removed at the same time. Any work with in the Right of Way must be coordinated with Public Works via a Right of Way permit (copy attached). The planning and zoning department has the following comments: 1. The survey shows the average lakeshore setback measuring from a deck on the house to the south of 559 Park Lane. Is this an upper or lower level deck? If it's a lower deck,the average lakeshore setback line must be adjusted. Please clarify. 2. We have recently changed our survey requirements, copy attached. One of the new requirements is to show the point or spot where the top of the foundation elevation reference elevation point is being measured from; we expect this to be consistent with the measurement on the foundation as-built. Please show the measurement point on the survey. 3. An egress window is shown on the building plans, but not on the survey, please revise. 4. The survey must also show all proposed exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining walls,etc. We need the final landscape plan to be submitted and approved before we will issue the building permit. We also need the name of the landscape contractor performing the work. Please address the above comments and submit two updated full-size copies of the survey. If you have any questions, please don't hesitate to contact me. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ '� 952.249.4620 � 8 952.249.4616 � cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us Summer OfFice Hours: (Monday, May 18 through Friday,September 4,2015) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015 1 Christine Mattson From: Joan ODonnell <odonnell.t.m@gmail.com> Sent: Tuesday, September 01, 2015 9:24 AM To: Christine Mattson Cc: Mark Way; Mark Gronberg; Melanie Curtis Subject: Re: 559 Park Lane/#2015-01001 Morning Christine Thanks so much for your email! Both houses on each side of the lot have decks on the upper level. Their bottom walkouts are concrete patios. I hope that helps with the line of sight question. We will work diligently to get these items back to you quickly. Thank you again for your help! Best Regards, Joan 0'Donnell 309.361.9302 On Sep 1, 2015, at 7:45 AM, Christine Mattson<CMattson@ci.orono.mn.us>wrote: Mark, The City Engineer has reviewed the survey dated 8-12-2015 and has the following comments: 1. The plan proposes 2 driveway connections to Park Lane. City Ordinance allows for one per property. The larger of the curb cuts is depicted at 29 ft wide. The maximum width for a driveway connection at the street is 20 ft. 2. Plan proposes work within the right of way to place a new culvert. The old culvert should be removed at the same time. Any work with in the Right of Way must be coordinated with Public Works via a Right of Way permit(copy attached). The planning and zoning department has the following comments: 1. The survey shows the average lakeshore setback measuring from a deck on the house to the south of 559 Park Lane. Is this an upper or lower level deck? If it's a lower deck,the average lakeshore setback line must be adjusted. Please clarify. 2. We have recently changed our survey requirements, copy attached. One of the new requirements is to show the point or spot where the top of the foundation etevation reference elevation point is being measured from;we expect this to be consistent with the measurement on the foundation as-built. Please show the measurement point on the survey. 3. An egress window is shown on the building plans, but not on the survey, please revise. 4. The survey must also show all proposed exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining walls,etc. We need the final landscape plan to be submitted and approved before we will issue the building permit. We also need the name of the landscape contractor performing the work. � Please address the above comments and submit two updated full-size copies of the survey. If you have any questions, please don't hesitate to contact me. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ '�' 952.249.4620 � g 952.249.4616 � cmattson@ci.orono.mn.us J � www.ci.orono.mn.us Summer Office Hours: (Monday, May 18 through Friday,September 4,2015) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015 <Survey Requirements - August 2015.pdf> <ROW Permit App.pd� z Christine Mattson From: Christine Mattson Sent: Thursday, September 03, 2015 11:20 AM To: Mark Gronberg Cc: Mark Way; 'Timothy and Joan O'Donnell'; Melanie Curtis Subject: RE: 559 Park Lane/#2015-01001 Mark, For additional clarification—the new survey requirement regarding top of foundation asks you to identify the top of foundation and show the exact location point of that elevation on the home's foundation perimeter. The foundation as- built should also show the as-built elevation in this exact same location for height verification. In an effort to keep this application moving along,the southeast corner of the home will be used as the measurement spot for the top of foundation elevation. If this location should not be used please show the exact location point on the home's perimeter and submit two copies of an updated survey. Please don't hesitate to contact us if you have any questions. Christine^' From:Timothy and Joan O'Donnell [mailto:odonnell.t.m@gmail.com] Sent:Tuesday, September 01, 2015 10:05 PM To:Christine Mattson<CMattson@ci.orono.mn.us> Cc: Mark Way<mark@atlashomesmn.com>; Mark Gronberg<markg@gronbergassoc.com>; Melanie Curtis <MCurtis@ci.orono.mn.us> Subject: Re: 559 Park Lane/#2015-01001 Hi Christine: Thanks again for pulling this all together! Just wanted to follow up from our discussion on the landscaping. The only landscaping that will be done on the lot that is currently not on the plan will be a berm. After our discussion, I went back to see Mark Gronberg. He said that he will include that in the updated plans along with the other changes requested and have them to you in the morning. Please let us know if there is anything further after those final changes that we may need to help with on our end. Mark Gronberg's team will be out on Thursday to stake the lot. Thank you so much again for your help!!! Joan On Tue, Sep 1, 2015 at 7:45 AM, Christine Mattson<CMattson(c�ci.orono.mn.us>wrote: Mark, `; The City Engineer has reviewed the survey dated 8-12-2015 and has the following comments: 1 ' 1. The plan proposes 2 driveway connections to Park Lane. City Ordinance allows for one per properly. The `` larger of the curb cuts is depicted at 29 ft wide. The maximum width for a driveway connection at the street is `: 20 ft. " 2. Plan proposes work within the right of way to place a new culvert. The old culvert should be removed at the same time. Any work with in the Right of Way must be coordinated with Public Works via a Right of ! Way permit(copy attached). � i '' The planning and zoning department has the following comments: `` 1. The survey shows the average lakeshore setback measuring from a deck on the house to the south of 559 "" Park Lane. Is this an upper or lower level deck? If it's a lower deck, the average lakeshore setback line must be adjusted. Please clarify. ' 2. We have recently changed our survey requirements, copy attached. One of the new requirements is to ':: show the point or spot where the top of the foundation elevation reference elevation point is being measured from; we expect this to be consistent with the measurement on the foundation as-built. Please show the ;'; measurement point on the survey. ' 3. An egress window is shown on the building plans, but not on the survey, please revise. ' 4. The survey must also show all proposed exterior/landscaping improvements, i.e. patios, grading, ' sidewalks, retaining walls, etc. We need the final landscape plan to be submitted and approved before we will '' issue the building permit. We also need the name of the landscape contractor performing the work. ; Please address the above comments and submit two updated full-size copies of the survey. If you have any `';' questions,please don't hesitate to contact me. ".". Christine Mattson ' Planning Assistant City of Orono i 2750 Kelley Parkway � Orono � MN � 55356 (physical address) PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing address) I � � 952.249.4620 � g 952.249.4616 z '' � cmattson(a�ci.orono.mn.us � '^ www.ci.orono.mn.us � Summer Office Hours: (Monday,May 18 through Friday,September 4, 201� Monday - Thursday: 7:30 am to 5 pm ; Friday: 7:30 am to 11:30 am '' OUR OFFICE WILL BE CLOSED: Monday, September 7, 201 S 3