HomeMy WebLinkAbout1997-009420 - 12x12 shed PERMIT
CITY OF ORONO
PERMIT TYPE: c= ,;• ��N62750 Kelley Parkway- P.O. Box 66 -s•4•_-
Crystal Bay, Minnesota 55323 Permit Number: '�!���t s
(612) 473-7357 Date Issued: =, F=1' 7
RSITE ADDRESS: ORONO Ji!HARa D`c
CH
. N . ' Eft-i
17-'7'3-22-000,,c
.e...
DESCRIPTION:
•-_X 1 i:: SHED
Building Permit Tye SF-HCC STRUCTURE
Building Work Type SHED
uBc: Occupancy t1--1
;onwt.rui t.i on Type VN
Zoning RR-18
Cen..us Code ade _2 OTHER NONRE S •
REMARKSf'':
t=r =;4siH E a`_- ti! f REQUIRED FOR ELECTRICAL ( _TATE)
FEE SUMMARY:
VAi-i}AT_ON a.2, 7..r.,0
:_:=e FJ.-_ $74 . 75
P a n Re i:.,=w $4S. E._
u1'a,ildi'' e1
Total Fee $124 . 72
^TOR7 n t.
C1-1 CO ,:D - .i:.6C ;`r 17,11i _ ^ =_ �
.=='v'i ,.if tl j ; i MN . S 4•42 O^t'l:INO mN 5.5:391
THE..c NDER 1 GNED HERESY i s •E'E:T- ` ER 1,=S I � To mita' E � REAL- R r EM
SPE I'FIED AND AGREES TO 00. ALL WORK ' IN"' TR;ICT CO ANCE !I TH ,.L 'CITY F
11�ORC iND OR I`F # N(�ES AN w7� ` TI `IF I#I INE:.t ' I'► DUING `EQ I R, MENT"x.
t_
iee
Ara - A/. ;ice r
A�PLI'ANT/PERMI SIGNATURE ISSUED BY SIGNATURE /
-
Total Fee: $ Date Received:
Entered By: (J:. Permit#: �f,2c)
CITY OF ORONO - BUILDING PERMIT APPLICATION
All information must be submitted in full before plan review will be started.
(please print all information)
THE APPLICANT IS: (circle one) OWNER O CONTRACTOR
JOB SITE ADDRESS: C4u9 SM&F CatieSe' ZIP:
2.4.5 to(-07'o on-c f-harw)
NAME OF OWNER: O16.!oi'JO 671 PHONE: (home)
(work)
MAILING ADDRESS: CITY: ZIP:
CONTRACTOR: 4D(- n t[,`i PHONE: �j00 rp
CONTACT PERSON: TEegy cetuotE MOBILE/PAGER: •
MAILING ADDRESS: Sb(5 taw' /6'7 /v, CITY: fix/wept-Ai ZIP: s544-2..
STATE LICENSE: # -
ARCHITECT/ENGINEER: PHONE:
MAILING ADDRESS: CITY: ZIP:
NAME: REGISTRATION#
TYPE OF WORK: New Addition Accessory Structure
Move Remodel/Alteration Land Alteration
PROPOSED WORK(describe in detail): / Z {/2 9/E GJ/Ty( T " act/
Iry got/5 /jMo
STORIES: / SQ. FEET OF EACH FLOOR: /4-4-
NO.
4-4NO. OF BEDROOMS: GARAGE STALLS: ATT. --e- DET. _
ESTIMATED CONSTRUCTION VALUATION(excluding land): $ 27S 2
I hereby apply for a building permit and I acknowledge that the information above is complete and
accurate; that the work will be in conformance with the ordinances and codes of the City and with
the State Building Code; that I understand this is not a permit and work is not to start without a
permit; and that the work will be in accofdance with tag%approved plan.
APPLICANT'S SIGNATURE: DATE: /�
NOTE! Parade of Homes events require separate permit approval by Police Department and
City Council 60 days prior to the event. Non permitted events will not be allowed.
CHECK OFF LIST FOR ISSUANCE OF PERMITS
FOR OFFICE USE ONLY
ADDRESS OR LEGAL: Z(S C)12-4)Ar'D Q
PID:
DESCRIPTION OF WORK: (2x 2
ZONING REVIEW BY: c:4)54., ' DATE APPROVED: l'� -110-4 7
BUILDING REVIEW BY: DATE APPROVED:: f 6
7 - 7
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMIT Yes t/' No
PLAN REVIEW Yes y '" No SEWER CONNECTION
STATE SURCHARGE Yes _ No WA1'bRCONNECTION
INVESTIGATION-FEE Yes No PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC Units OTHER (specify)
ZONING CHECK LIST Zoning District: 2 R •t
Fire Department: (t rN-J5 V1-t.(.c" Post Office: School District: (}n s� .9
Lot Area: Sq.h. #1A, (7941),ter Acres Width Depth
Survey Submitted: Yes No e< Date of Survey:
c.J270n
Proposed Setbacks: s �
Front (4 aice)-: Sb t Right Side: . COD i '�
Rear(Street): 515'0 4'. Left Side:
Adjacent Structures: N A Wetland: i
Building Height: Def. Hgt. 12 ` Peak Hgt. i t
Lot Coverage: J 'A
Grading: Staff Approval Date: By: Council Approval Date:
Septic: Staff Approval Date: By:
Zoning File: # Resolution: # Resolution Date:
Shoreland District:
1).s Avg. Setback: Bluff Setback: Lot Coverage:
Existing Proposed
Hardcover: 0-75'
75-250'
250-500' •
500-1000'
Hardcover Variance Required: Yes No Date of Council Approval:
REMARKS (in house):
• 26
BUILDING REVIEW CHECK LIST
UBC: U - CONSTRUCTION TYPE: \//"
• Sq Footage $ Per Sq Ftg
Basement x =
1st Floor x =
2nd Floor x =
Garage x =
x =
TOTAL
•
Estimated Construction Value: $ 2 7 SID
Inspections Required: • Work Requiring Separate Permits:
Site Plumbing Fire
Hardcover Removal Mechanical Water Connection
;x Footing Septic Sewer Connection
Framing Fireplace Lawn Irrigation
Insulation (Masonry) Other
Wall Board (Mfg.) Well (State Permit)
K Final Grading/Filling K Electrical (State Permit)
Other
REMARKS (IN HOUSE):
•
-------------------- -REVIEW BY OTHERS: DATE:
Access: Existing New
Access Approval: Date By:
REMARKS(TO BE NOTED ON PERMIT): w �_
•
•
27
I.
I
7-:------__
,...,
___, , _
\i„
___....... - N
-)%
-C.
-- ...._..... __ ._
---..... P
. ,._.
_....
,. ...._
• i_
, _.. •
!
; .
---..........._..., ;--h.
-11-
QS ,
• •,,--
_. ,.
C 71
V .,.....
....
'r..-=-. ••••\---
i... —..‹..:,_
,.....
... . !.•;',:. 'ilj '?, "" lia
.• g. -.,h
v•I te, :. '-', --I -a,
± F: it-i :..-4 ,-• (7: i , 44
55 g--g -,:--i- 4t; ',5i ",-• - i 4. ,
..--6 . ..;,•, ...... ,,...., os„... ‘
1; •="1. . ''', "Ir. C.' L-4 4 it. ,
rn r-i,n :-;. •-t-.., ..., , '
.?. ;.7;-I•6- :,-;--, ....:: 1:,-) I-0 \M,,.:
0
--..:_-_-:•w.---:.--,,,----- 1
77"
C=1)
70P,... .
• Ara
........ .....„, ....
...,. ..,.._.. (i. cn ,"'.
le :I'24 i 16 2
-• -i N• c0 0 •
\ CC^
Ca
,i• i
I ,f
--ro. ..:
.....<
r,
7--------
i 13:i
52
....E:, \.....4i,.\, ,
_jz
-"- )
cs—
a �
\N c-: =' ..V
ty,
d c;* ." .7
\--74.,,„ '''. r% • \., / f Z
Q
. .:C. ..\,....\,_(
1.
/ ..e\-\,..
i i - _____ . , •
/ 15) ?
----
/
/ C'
cz.is. 7%
aia
oZ
.... ...ir 2 j
z NowaN
G.
3
// ' b�_t • \ / /
/ , / e\ ,1 . -
---\_/ 1--
cl „,
I.. /4.0 f-A, 7,, ,
,S, \ ,f
4!"' ,r/I; ...- —7:-/' r i cl i / p,
. -f (4._/YAIP" \ r/ • i -r ct'''' /;y7 il 6-1 r't'. i7 9-h )
„c ,, ,V' / •,. ,...,, ,ci.,, ,
0
/ .
rc-r Or r ‘ '..-... ---\-? c ;/ --
•
ViSIC-(11 1 •
‘v 11.( 0 • ..11..
'1NIt/W ��1 S-i N-4 r sr-r
I
, ,..,_,
�� I h ri
•
9 ,,r ,
r-1 E ; �” %p/.41q-h oC-h hl
81-t c__,
9"c .9
�,j / j /„cii3
I %r �,r"h �,
�.i" e_t
/
) /
..,...'''''.---'..,.__.---___.----;...--2
IP .0-
Ql'£ L
"E - ,- ,1-r ORO COPY
.........„............
o
.f /TT:
CITY OF ORONO
•• ID
(I)
qr
- _K SITE E. , LAN GRADING PLAN
9/ _51-£ •.,• 1 •• ,• �Y 4•• ' ,°=: t' i 1-?.y,`_J'flLt9 Os�c.Q 1'Zjc 2_ QTY 4o
E I' DISA.417‘16L
{ ,/ it f,,P r, ED ''ITN REVISIONS
•
BY
... ,,_c. ....„
81 £ J DATE d?-ti, S 7
ti�
, e ,
......:
i
•. e