My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer project
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
110 Orono Orchard Road South - 02-117-23-21-0022
>
Correspondence
>
Re: sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:13 PM
Creation date
5/18/2018 12:41:43 PM
Metadata
Fields
Template:
x Address Old
House Number
110
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
110 Orono Orchard Rd S
Document Type
Correspondence
PIN
0211723210022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> --)4 1---14:„ O <br /> -41 <br /> 4• CITY of ORONO <br /> p,v', I�'0y ,. SFr Municipal Offices <br /> tE$I'iOO' 4G Street Address: Mailing Address: <br /> � *C ' 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> April 20, 1998 <br /> Dear Project Area Residents; <br /> The City of Orono has scheduled a Neighborhood Informational Meeting to obtain resident <br /> comments on a proposed sanitary sewer project to serve the Orono Orchards Neighborhood. A <br /> project area map is included with this notice. This Neighborhood Meeting will be held at 7:00 <br /> P.M. Thursday, May 14th at the Orono City Council Chambers. <br /> Introduction <br /> This area was included in the recent MUSA expansion for sanitary sewer installation because of <br /> the smaller lot sizes and older septic systems with limited replacement sites available. Installation <br /> of new code compliant septic systems will be very difficult on some of the lots in this <br /> neighborhood. Approximately 25% of the septic systems in this area are currently failing, with <br /> an additional 15% in near failing condition. This area is one of ten neighborhoods included in the <br /> MUSA expansion. Sewer projects have already been completed in four areas with an additional <br /> two areas scheduled for completion this summer. We are beginning the planning process for <br /> possible 1999 projects. At this time, interest rates are low providing for more affordable projects. <br /> Project Assessments and Costs <br /> A feasibility study has been completed with an estimated project cost of $518,914 in 1998 <br /> dollars. This results in a proposed project assessment of$22,562 per unit payable over a fifteen <br /> year period. Options for prepayment of the assessment are available. Based on several projects <br /> recently completed, the estimated interest rate is 6.25%. Based on a 15-year assessment at 6.25% <br /> interest, the annual assessment payments will be approximately $2,350. These project costs and <br /> assessment payments may vary dependent on future construction costs and interest rates. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.