Loading...
HomeMy WebLinkAbout2000-P02165 - addn/remodel/repair PERMIT CITY OF ORONO 2750 Kelley Parkway - PO Box 66 Permit Number: P02017 P02/40.5- Crystal o Z/ro.5-Crystal Bay, Minnesota 55323 Permit Type: Addition/Remodel/Repair (612) 249-4600 Date Issued: 1/28/00 SITE ADDRESS: 60 Orono Orchard Rd S WAYZATA,MN 55391 PID: 02-117-23-21-0023 DESCRIPTION: Proposed Use: Residential UBC Occupancy: R3 P Permit Class: Building Construction Type: VN Permit Type: Addition/Remodel/Repair Census Code: 434 Permit Sub-type: Single Family DETAILS: Resolution#: N/A Separate permits required fo Plumbing Mechanical Electrical(state permit) NOTICES: FEE SUMMARY: permit Fee: $ 1,273.75 Valuation: $ 150,000.0 Plan Review Fee: $ 828.03 State Surcharge Fee: $ 75.00 SAC Fee: $ 0.00 Misc. Fees: $ 0.00 TOTAL FEE: $ 2,176.78 APPLICANT: Altmann&Associates Inc OWNER: DOUGLAS E WHITELEY ET AL 3591 Woodland Tr 60 ORONO ORCHARD RD S Eagan,MN 55123 WAYZATA MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. APPLICANT PERMITEE SIGNATU ISSUED BY SIGNATURE OJ Today's Date: 1/28/00 Page 1 From : J.PETER PAULSON PROF.ASSOC. PHONE No. : Dec.22 1999 1:20PM Pe5 i Tonal Pee: t s?, /76' l • Datt Reteiv ; )z/ 7/9..? Entered By: / 4 Permit#: pO)o i7 CITY OF ORONO - BUILDING PERMIT APPLICATION AU information must be submitted in full before plan review will be started. (please print all information) THE APPLICANT IS: (circle one) OWNER. R CONTRACTOR 553q-/ JOB SITE ADDRESS: &00 ()J _ l rx*,ZIP: NAME OF OWNER: b.._ . •, /,_ PHONE: (home)4, 1 Z. `-/73- 8/Oq / (work) I Z- S5:3 - 34/4,7 MAILING ADDRESSs • . .. 1A..-...14_,1 ;ITV: O11--cryw ZIP:--. r5Y3 5S / CONTRACTOR: 4PHONE: �S/- Y ' 3 - 951Z.CONTACT PERSON: M BILE/PAGER I-P I Z- 8y-Y 9L. MAILING ADDRESS:3s. w TeaCITY: E _ ZIP: 5-5)z 3 STATE LICENSE: # /72 ARcIDTECT,/ENGINEEIZ: _„ '_ . .,_ PHONr: /s/- ,,,1,27,- O?Q. W MAILING ADDRESS: 3:1 , 7/, 4 ' , / CITY:., 6ZIP! 55/h/ NAME: I , At 4 _ REGISTRATION# / / TYPE OF WORK: New Addition > Accessory Structure Move Remodel/Alteration Land Alteratie y PROPOSED WORK(describ in detail); l2 X 3 Q ' S ,..A I, _.L STORIES: c72 SQ,FEET OF EACH FLOOR: 471 aQ C/ NO. OF BEDROOMS: 3 GARAGE STALLS: ATT. I1/oAc DET.E2Ae„ ESTIMATED CONSTRUCTION VALUATION (excluding land): $ ASO, COO. QO I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and a des of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in accordance with the approved plan. APPLICANT'S SIGNATURE! �t1 DATE!: /7-4-14' NOTE! parade of Homes events require separate permit approval by Police Department and City Council 60 days prior to the event. Nun permitted events will not be allowed. 5 From : J.PETER PALLSON PROF.ASSOC. PHONE No. : Dec.22 1999 1:23PM P03 ta Sec.13.04 RIGHTS OF 9URIRI T 1W DATA Subd.1. Typo of data. The rights of Individual on whom the data is stored AV to ho stored shall he es set forth in this section. Suds 2. Information required to be given individual. An Individual asked to supply private or confidential data coneernine himself shall be lrafbrrned of: (a)the purpusc wail Wended use of the requested data widths the oolleedng sans agency.political subdivision,or statewide sytsam;(b)whether he may refuse ur is legally rewired to supply the requested data:(o)any]mown consequence arising frutn his nupplyviig or refusing to supply private or ctstlltkdlul data:and(d)1ho identity Of other persons or anuli...authorized by state or federal law to receive the data This rstiuitunttue shall not apply when en individual is asked to supply lnvastigadve data,purulent to Beefier.13.(ti.,sUlwlivitinn S,in a law enforcement officer. The t ommioaiener of rovorhm may claw aha tmuht r.aulred under this riMivie t,n in the individual Income tax or nrnnenv tax refund jgg suction Insuad of on tlmliiggm Sulci.3. Access to data by individual. Upon requee to a reapenaihie seniority.an individual shall he informed whether he Is the Subject of stored dee on individuals.and whcutct it in c.lassIAod as piddle,private or oonradetuial. Upon hie furdar request.en individual w}tn Is de subject it tsored private or public data on Individuals shall be shown the data without any charge to him end,if ho desires,shall to informed of the content and meaning of that data. After an individual Inas boos shown the private data and informed of is moaning,the dots need not he disclosed to him ter lux months tiansanar unless a dispute or action pursuant to this section is pending or additional data on the individual has bern collected or created. The responsible authority shall provide copses of the private or public data uptrt newest by the individual suhjeet of the dem. The responsible authority may rognirc the requesting person to pay die acted costs of making.certifying.And compiling the copies. The responsible autarky shall comply immediately,if possible,with any request made pursuant to this subdivision,or within five days of the date of the request,excluding Saturdays.Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request within that time,he tdtall so inform the hailvidtal,and may have an additional five days within which to comply with the request, exoluding Saturdays,Sundays and Ind holidays. 3uwW.4. f'rusedura when data I.out accurate er c.mpiNc. An individual nut.crowns the arenraey or cons:Menem of nubile or private data concerning himself. To exercise this right,an individual shall notify In writing the responsible authority describing the centre of the disagreement. The responsible audaoria,shall within 30 days eitrter. (a)correct oho data found to he inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data.including recipient named by die Individual;or(b)notify the individual that ho believed the data to be correct. Data in dispute shall be disclosed only it the individual's statement of disagreement is included with the disclosed trate. The determination of the responsible authority may be appealed pursuant to the pwvisions of the administrative procedure act relating to contested cases. DATA PRIVACY_M A/RV In accordance with M.S. 13.04, Subd. 2, "Rights of subjects of data",we would like to inform you that your request far a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The Information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data,but refusal nay require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve. some information may become public. S. You have certain rights under M.S. 13.04(available upon roqucet)to review private data on yourself. 6. Your full name is required to proems this application or permit. BsL a`L.v l • First Middle Last Address ,(- #'73-a/09 �tlZ '✓ div- SS�,'r S�` dr 7 City State Zip Phone 1 understand my rights an stated above. - Sig re 1u� 6 CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESS OR LEGAL: �,U 0 200,10 O R.c‘4,A2 LA nr PID: DESCRIPTION OF WORK: 4 on ZON7LtiG REVIEW BY: DATE APPROVED: 1 �v BUILDING REVIEW BY: JC 02.44A., DATE APPROVED: ( - FEES TO BE CHARGED: Misc. Fees Calculated By: PERMIT Yes No PLAN REVIEW Yes ✓ No SEWER CONNECTION STATE SURCHARGE Yes No WAIERCONNECTION INVESTIGATION FEE Yes No PARK FEE SAC Yes No Sl IbLNSPECTION Number of SAC-Units OTHER(specify) ZONL G CHECK LIST Zoning District: 12P---%(1 Fire Department: L ,..sV lAtc.-ta Post Office:Letssi Utv_k, School District: L2oa1c:: Lot Area: Sq.ft. `aS(86.0 .L, Acres i•24', • Width zto` .t Depth ZqC:' t Survey Submitted: Yes) No Date of Survey: —7-21- Qol Proposed Setbacks: Front(Lake.): IS3't Right Side: Rear (Street): 2 o'S' Left Side: 30 Adjacent Structures: = ± Wetland: N !/a Building Height: Def. Hgt. U << Peak Hgt. • Lot Coverage: 0 kc Grading: Staff Approval Date: By: Council Approval Date: Septic: Staff Approval Date: By: oning File: # Resolution: # Resolution Date: horeland District: ivy Avg. Setback: Bluff Setback: Lot Coverage: Existing Proposed Hardcover: 0-75' • 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS (in house): 7 • BUILDING REVIEW CHECK LIST UBC: R 3 CONSTRUCTION TYPE: 'Vr`' Sq Footage $Per Sq Ftg Basement x = 1st Floor x 2nd Floor x = Garage x = x _ TOTAL Estimated Construction Value: $ i Su,Ok.)0"-: Inspections Required: Work Requiring Separate Permits: Site Plumbing Fire Hardcover Removal .N Mechanical Water Connection K Footing - Septic Sewer Connection ,c Framing Fireplace Lawn Irrigation Insulation (Masonry) Other Wall Board (Mfg,) Well (State Permit) t Final Grading/Filling p( Electrical(State Permit) Other REMARKS(LY HOUSE): • REVIEW BY OTHERS: DATE: ---- ----- - Access: Existing New Access Approval: Date By: -- ------- ----------- ----- REMARKS (TO BE NOTED ON PERMIT): • 8 STATE OF MN DEPT. OF COMMERCE E 133 East Seventh St e`' St Paul,MN 55101 • (651)296-6319 BUILDING CONTRACTOR *-; s+•1 ID#1768 BUILDER CORPORATION Expires: 03/31/2000 STEVEN T ALTMANN 7 Hrs CE due by 3/31/2000 DBA:ALTMANN ASSOC INC 3591 WOODLAND TR EAGAN MN 55123-0000 NO copy 1-0-r/l� 7 CG.4-e.co),q A/,‘,1--/r=--z- -y .mss/ A,- • ‘..oto,, -re•-e) /re/ft) S. 4;' -ovir0, ..‘-i,v . - -5-534- / a9c2 � ag.a7 IL,, ...,.3r -29•i/3 I�r 1-75/,2, i PO,-nO""" = NO,/- Cp -f, C 74-....17.-GE' x4.Ic Al ! x/.7 y ,2j.Fz w x.90 r0 ' - -71.9e 30.06 4 30.2 Z 30. 4 D 30. 37 / �s r 14) �p G/ El:,r- 2-/A/.5-• !/mss`/A�to "- , a 7 tea,f� I 30.49. o - :v.77 AI :o.&-y n 3e4.2_ 0 3r.0 V 3r.ob 3f.ti.. b 3i.2y Z 31. 3 7- 3/•4I. 3 3i. y 3,.117 31.4 -... r r 3e CALAvct.3.-5 Skk .M� - a )3 fir m v 1 �47` 0 P A 1 pmeote.-i4 Aosotr,eN �,n.,,� .5tak hI rACCI' E0 , . ,.....-T (3r4GK- A.„-i "1 a w :7°6b430 b 1.61 A . 1-2 FAMILY RESIDENTIAL BUILDINGS PACKET I MINNESOTA ENERGY CODE • 1-2 Family Residential Buildings SUMMARY OF BASIC REQUIREMENTS ROOF/CEILING.WALLS.FLOORS • Either meet"Cookbook"criteria as outlined in Residential"Cookbook"Worksheet OR meet U-Value criteria as outlined in Exterior Envelope U-Values Worksheet. OTHER ENVELOPE CRITERIA: • Slab on grade floors must have continuous perimeter insulation of R-10 to depth of frostline. •, Foundation walls must be insulated with R-10 minimum from top of wall. • Loose fill insulation installed must provide the required performance at winter design conditions. EFFECTIVENESS OF REOUIRED THE MA .INSULATION: • Building design must meet Category 2 requirements for vapor retarder,air leakage and wind wash barriers,and ventilation. DUCT INSULATION AND SEALING: • Insulation for ducts encased in cement or within ground must be R-5. Insulation must be installed on bottom and side of plenums. • Ducts installed in attics, garages,exterior walls or unheated crawispaces must be R-8,minimum. • Return air ducts conducting air into a furnace through the same space as the furnace must be sealed continuously airtight. • for ducts running outside the vapor retarder or of greater than 0.25 inches water gauge pressure, all transverse joints must be sealed. FIVAC PIPE INSULATION: Insulation Thickness, Inches • Pipes 1"and Pipes System Runouts* Less 1-'/."to 2" Heating '/2 1-'/2 1-'/2 Cooling(Suction) '/2 34 'Applies to runouts not exceeding 12 feet in length to individual terminal units. SERVICE WATER HEATING: • Either the first eight feet of both inlet.and outlet pipe must be insulated with '/2 inch thick pipe insulation or heat traps must be installed. • Energy requirements for swimming pools and spas are in Part 7670.0710, Subpart 5,page 55 of the code. MATERIALS AND INSULATION INFORMATION: • Materials and equipment must be identified so that compliance can be determined. Completed insulation receipt attic card must be supplied near access opening. • Manufacturer manuals for all installed equipment requiring preventative maintenance for efficient operation must be provided. • Insulation R-Values,window and door U-Values,and heating and cooling equipment efficiency must be clearly marked on plans. This is a summary only. Other requirements may apply. See the Minnesota Energy Code 2/5/96 Questions? Call Department of Public Service Information Center at 612/296-5175 or 1-800/657-3710. y'l!"o : II1 .•, . u" • MINNESOTA ENERGY CODE All Buildings SUMMARY OF BASIC CATEGORY 1 AND CATEGORY 2 BUILDING REQUIREMENTS FOR INSULATION PROTECTION,AIR TIGHTNESS,AND VENTILATION MINIMUM: All buildings must meet the following minimum code requirements: VENTILATION: A Category 2 building is one where infiltration and passive ventilation(operable windows)are relied on to provide necessary year-round ventilation. If one or more of the Category 1 measures below is incorporated into the residential design,however,a residential mechanical ventilation system as specified below must be installed. . VAPOR RETARDER: A vapor retarder,also known as a moisture barrier or vapor barrier,must be installed on the warm side of insulated ceilings,walls and floors. Polyethylene vapor retarders must be 4-mills or thicker. The code requires a vapor retarder to be installed only on rim joists that are susceptible to condensation from moisture diffusion. AIR BARRIER: A barrier against air leakage must be installed to prevent leakage of moisture-laden air from the conditioned space into exterior ceilings,walls and floors. • Plumbing and heating penetrations must be air sealed. An air barrier must be provided behind any tub or shower that is located on an exterior wall. • Air sealing must be done at all dropped ceiling areas,chimney flues,ventilation ducts,and other fire stops that penetrate the vapor retarder. • Holes in the building envelope for electrical and telecommunications equipment must be air sealed, including the service entrance,wires,conduit,cables,panels,recessed light fixtures,and fans(where vapor retarder is penetrated). • Joints in the building envelope must be sealed, including around window and door frames, between wall cavities and window or door frames. • •Tested air infiltration rates must not exceed 0.34 cfm/square foot of operable sash crack for windows, 0.5 cfm/square font for residential doors and 1.25 cfm/square foot for commercial doors. WIND WASH BARRIER: An air-impermeable barrier must be installed at the attic edge(baffles must be rigid material resistant to wind driven moisture);and overhangs,such as cantilevered floors and bay windows. IOPTIONAL: Category 1 Buildings meet all requirements as listed above plus the following: RESIDENTIAL MECHANICAL VENTILATION SYSTEM FOR RESIDENTIAL BUILDINGS: A system that,by mechanical means, is capable of introducing and distributing outdoor air to all habitable rooms and removing indoor air at a rate of not less than 035 air changes per hour or 15 cfm per bedroom plus another 15 cfm, whichever is greater. AIR LEAKAGE BARRIER: A barrier against air leakage must be installed to prevent leakage of moisture-laden air from the conditioned space into the building envelope: • Electrical boxes and fan housings must also be sealed. • All rim joists,band joists,and where floor joists or trusses meet outer walls must be sealed. • The top of interior partition walls that join insulated ceilings must be sealed. • Joints must be sealed between wall assemblies and their rim joists,sill plates,foundations, between wall and roof/ceilings,and between separate wall panels. WIND WASH BARRIER: All exterior joints in the building envelope that may be sources of air leaks must sealed. This is a summary only. Other requirements may apply. See the Minnesota Energy Code. 2/5/96 Questions? Call Department of Public Service Information Center at 612/296-5175 or 1-800/657-3710. o,. !Po% " ` I MINNESOTA ENERGY CODE 1-2 Fainily.Residential Building RESIDENTIAL"COOKBOOK" WORKSHEET A Name Phone Date Statement of Compliance: Building Official Use .�vy " . ‘,37-Ysy9yrb 11/27 1?.? Applicant Address 3 5,7 �a��� � CeEO/9, -e, s.z.e , The proposed building design represented in these documents is consistent with the building plans, Efitp.",n, /7/V 55/Z 3 specifications,and other calculations submitted Building Address: with thepermitapplication. The proposed �d � � a a building has been designed to meet the O ff' 11,4/ requ cots of the Minnes nergy Code. Applicant/Engineer MINIMUM REQUIREMENTS for"Cookbook"Option: Entry Doors 1-3/4"solid wood w/storm Ceiling with energy truss R-38** Rim joist R-19 door br equivalent (Min. 7Y2"top plate to sheathing) Foundation Windows* Insulated Glass w/1/2"gap in Ceiling with low heel truss R-44** Floor over R-24 wood or vinyl frame unconditioned space *Include square footage in calculation of Window/Door Area Ceiling-no attic R-38 w/R-5 sheathing to determine above grade Window U-Value. , **Insulation Performance at Winter Design Conditions • Window and boor Area +' 100 i ...24 1 ei + I 13S- s O. li % WINDOW U-VALUE: . 3 Q As%of Exposed Wall Area Above Grade Window and Gross Wall Area Window/Door Area Source: NFRC >< or ASHRAE 1993 Handbook FotlndationWindow/Door Area 4. I . 4. , MAXIMUM WINDOW U-VALUES Check Wall WALL TYPE MAXIMUM WINDOW AND DOOR AREA%OF EXPOSED WALL AREA Type Used 12% 14% 16% 18% 20% 22% 24% 26% 28% 30% 32% 34%_ TYPE A 2x4 framing,R-I3 insulation,sheathing R-7 or greater. 0.55 0.47 0.41 0.36 0.33 0.30 0.27 0.25 _0.23 0.22 0.20 0.19 TYPE B 2x4 framing,R-I5 insulation,sheathing R-5 or greater. 0.52 0.45 0.39 0.35 r 0.31 0.28 0.26 0.24 0.22 _ 0.21 0.20 0.18 TYPE C 2x6 framing,R-19 insulation,sheathing less than R-5. 0.48 0.41 0.36 0.32 0.29 0.26 0.24 0.22 0.21 0.19 0.18 0.17 TYPED 2x6 framing,R-19 insulation,sheathing R-5 or greater. 0.56 0.48 0.42 0.37 0.34 0.31 0.28 0.26 0.24 0.22 0.21 0.20 X TYPE E 2x6 framing,R-21 insulation,sheathing less than R-5. 0.51 0.43 0.38 0.34 0.30 0.28 0.25 0.23 0.22 0.20 0.19 0.18 TYPE F 2x6 framing,R-2I insulation,sheathing R-5 or greater. 0.58 0.50 0.44 0.39 0.35 0.32 0.29 0.27 0.25 0.23 0.22 0.21 This table contains interpolations of the values in the Energy Code,Part 7670.0475,Subp.2. This is a summary only. Other requirements may apply. See the Minnesota Energy Code. Questions? Call Department of Public Service Information Center at 612/296-5175 or 1-800/657-3710. E 215/96 DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTIC (� SCHEDULED 'PH O PERMIT NO. aa) w,..2 COMPLETED Z /T— ) ADDRESS (c)O ev —'o CVCv1.ckyCI OWNER CONTR. InitAncCrl ? aSSceii t1S TELEPHONE NO. (--lC.)—c)-(ACUO DESCRIPTION 1 FOOTIN 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING U. • 2 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS • 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP LU 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL S OWNER/CONTRACTOR TO MEET YOU:_YES_NO • Cq MENTS: Lot c / r vi CJS. 2 - s s <<//f- n� p)44s cc /Fe 52 / s city. Lu 12 W z W ccd W ❑WORK SATISFACTORY:PROCEED C PROJECT COMPLETE CCORRECT WORK&PROCEED C-, ISSUE CERTIFICATE OF OCCUPANCY CI)O LI CORRECT WORK,CALL FOR REINSPECTION TEMPORARY U BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN C STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 Owner/Contractor on site: Inspector. ///14----6-- White i? White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN S , O INSPECTION NOTICE 625 SCHEDULED -578 O a o?.'O O PERMIT NO. /969 COMPLETED C---9'—e/t3' Z CO ADDRESS 27O Y/ n d OWNER CONTR. C. TELEPHONE NO. �� ' 73�o - O 35 DESCRIPTION w 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMIN 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS I INSULATI• 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS • 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 44 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU: YES NO o COMMENTS: CC w CC g 0 CC 0 CC w CC w• :41160•RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE C ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY • ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY CI BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. L PHOTO TAKEN INSPECTOR WILL RETURN CISTOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED El INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 Owner/Contractor on site: Inspector. /P-,L,--C-Cee---6-20 White Copy/Inspector's File Canary Copy/Site Notice 000 000avool loo ✓ /x N \k N\ v - (n Z4 CIS N S4 81, 41 000 000avool loo ✓ /x N \k N\ v - (n Z4 CIS N S4 81,