Loading...
HomeMy WebLinkAboutRe: surveys * Christine Mattson From: Robert Bean <bobbe@bolton-menk.com> Sent: Monday, March 28, 2016 9:48 AM To: Christine Mattson Cc: Adam Edwards; David P. Martini Subject: 2016-00177 -470 Orchard Park Road Christine, I have completed review of the current Certificate of Survey(dated 3-18-16)for 470 Orchard Park Road. The plan has been revised to adequately address my comments submitted on 2-26-16, and I have no further comments. If you have any questions, please contact me to discuss. I will coordinate with Dave to have the original plan returned to your office. Thanks, Robert E. Bean,Jr, P.E. �I LEED Green Assoc. tO NO Water Resources Engineer Bolton & Menk, Inc. 0 '0 Consulting Engineers&Surveyors 2638 Shadow Lane,Suite 200 Chaska, MN 55318 P:(952)448-8838,ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com 1 - - Christine Mattson From: Christine Mattson Sent: Friday,July 15, 2016 8:49 AM To: Dan Mulrennan Cc: Monica Fadness; Rachel Dodge; Roger Peitso Subject: 470 Orchard Park Road/#2016-00117 Dan, We have reviewed and approve the foundation as-built survey. You may keep your 2:30 backfill/waterproofing inspection for today and we will cancel the inspection you had scheduled for Monday,July 18tH A copy of this email authorizing you to proceed should be kept on site with the inspection card. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN 155356(physical address) PO Box 66 I Crystal Bay I MN 155323-0066 (mailing address) 952.249.4620 18 952.249.4616 cmattson@ci.orono.rnn.us I www.ci.orono.mn.us Summer Office Hours: (Monday, May 23 through Friday,September 2,2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,September 5,2016 1 ODATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE,,, SCHEDULED �D-27-17 PERMIT NO. (0 "'U4)I t i COMPLETED ADDRESS 4l0 nrC,G1 arot_ i,YLL l€ OWNER TELEPHONE NO. CONTRACTOR E DESCRIPTION C.P— , / 5 i IN Si Wii I- W 0 FOOTING 0 DEMO-FINAL t 0 SEPTIC FINAL 1,41 ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING ❑ FOUNDATION WATERPROOF 0 PLUMBING FINAL 0 TREE REMOVAL ❑ RADON SLAB 0 MECHANICAL RI 0 SITE INSPECTION 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS • ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL . ❑ DEMO-SITE 0 SEPTIC INSTALL 2 OWNER/CONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: e; Q. CC O 7156dr`( 5 tie- //C7c catve -F liar been es la6/s4ed Q W Ct W 0 WORK SATISFACTORY:PROCEED 0 PROJECT COMPLETE CCW 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN 0 O STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Can for the next inspection 24 hours in advance. (952) 249-4600 OwnedContractor r e: Inspector: �G Whits Copy/Inspector's File Canary Copy/Sits Notice Christine Mattson From: Adam Edwards Sent: Friday,June 23, 2017 2:28 PM To: Christine Mattson Subject: RE:460 Orchard Park Road/#2016-01201 Chris, I believe this to be for 470 Orchard Park Road. 2016 00117 The as-built appears to conform to the intent of the approved plan. An inspector should conduct a site visit and confirm the following: 1.The survey accurately depicts conditions on the ground. 2.The site is stabilized to the point the any remaining erosion control can be removed. Adam From:Christine Mattson Sent:Tuesday,June 20, 2017 10:06 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject: FW:460 Orchard Park Road/#2016-01201 Adam, We have received the as-built survey for 460 Orchard Park Road. Let me know if you want Bob Bean to review it or if you comfortable with it. Thank you! From:Adam Edwards Sent:Tuesday,October 18, 2016 1:34 PM To:Christine Mattson<CMattson@ci.orono.mn.us> Subject: RE:460 Orchard Park Road/#2016-01201 Stamped approved From:Christine Mattson Sent:Tuesday,October 18, 2016 10:56 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Cc: 'Robert Bean'<bobbe@bolton-menk.com> Subject: FW:460 Orchard Park Road/#2016-01201 Adam, 1 • Bob Bean did the initial review on this application. I realized the retaining walls didn't meet City Requirements so I requested they provide engineering for the walls or adjust the location. Please review the updated survey dated 10-17- 16. Thank you. From:Christine Mattson Sent: Friday, October 14, 2016 12:13 PM To:'jkonen@konenhomes.com'<ikonen@konenhomes.com> Cc: 'pmulheran@highland.com'<pmulheran@highland.com> Subject:460 Orchard Park Road/#2016-01201 Jeff, Upon closer review of the survey I noticed the retaining walls shown do not meet City Code Section 78-797(8)(e). I have also attached our Landscape and Retaining Wall information sheet. Retaining walls 4 feet or taller require engineered plans. Tiered walls are considered one wall unless they are separated by twice the height of the higher wall. Separation is measured from the back of the lower wall to the face of the upper wall. Please submit engineered plans for the tiered walls or have the survey updated to adjust the location/distance of the tiered walls. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN 155356(physical address) PO Box 66 I Crystal Bay I MN 155323-0066(mailing address) 952.249.4620 I 952.249.4616 cmattson@ci.orono.mn.us I www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Friday, November 11,2016 Thursday& Friday, November 24&25,2016 2