Loading...
HomeMy WebLinkAbout2002-P05728 - demo PERMIT CITY OF ORONO Permit Number: 2750 Kelley Parkway- PO Box 66 P05728 Crystal Bay, Minnesota 55323 Permit Type: Demolition (952) 249-4600 Date Issued: 10/21/2002 SITE ADDRESS: 1530 Orchard Beach P1 Mound,MN 55364 PID: 07-117-23-43-0003 DESCRIPTION: UBC Occupancy R3 Construction Type VN Proposed Use: Residential Permit Class: Building Census Code 645 Permit Type: Demolition Permit Sub-type(s): Demo-Principal Structure DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: A_ A _—_[�a.___�__._ /!1___.__..r 1___1 T___11..__ : � ___... ....� Foundations/all demo debris io be removed from ground&disposed of off sue per PCA regulations. Wells mist be abondoned. Inspection before backfilling. FEE SUMMARY: Permit Fee: $ 80.00 Valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 80.50 APPLICANT: Semple Excavation&Trucking Inc. OWNER: L A Donnay 91 Ridder Cir 9708-63rd Ave N St.Paul,MN 55107 Maple Grove,MN 55369 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. )Chk()CiL—E--)\P -CCU - (6/XL- ) APPLICANT PERMITEE SIGNATURE ISSUED BY SIGNATURE Copies: 1-File(Si&nitures Required), 1-Applicant, 1-Monthly Reports, 1-AssessinE, 1-Finance Page 1 11111 10 / 0 2 (� G-72 674 CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT P.O. Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT General Instructions 1. You may be required to obtain other permits, i.e. well abandonmment, etc. 2. Work must not begin unless the permit card is available on the job site. 3. A 24 hour notice is required for all inspections. Call (612)249-4600. JOB SITE ADDRESS: 1530 cl PI c,cz Occupancy Type: x Residential Commercial OWNER'S NAME: 1 o y..1 Or % 1 ..1-9 Phone: (1(o3) Lei Lf -7-,900 Mailing Address: 10� } . _�►1r City: (\--1Innen po 1��, rr,w.) SC> CONTRACTOR'SNAME: 5.ernrlr: F x o-J . -4- nJc Bus.No.: inS 32w Mailing Address: qI tYcCity: rel S�Ic7 Demolition if planned by means of: manual disassembly X heavy equipment Permits Issued: # Well Abandonment t-1/4 In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is complete. 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless specific prior approval is obtained in writing for temporary use thereof. 3. Foundations shall be completely removed from the ground. 4. All demolition debris shall be completely disposed of off site in accordance with all applicable PCA requirements. 5. Water wells must be abandoned in accordance with State Health Department regulations. 6. Inspection required when all debris has been removed, before backfilling. r r � • 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The site shall be left clean and clear of all debris,with any excavation filled with earth level with the adjacent ground elevation(except when such excavation is to be used as part of a new building and such new building is actually under construction). 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses,including attorney fees,against the City,its agents,employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must be pumped,crushed and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are crushed and filled. PERMIT TYPE AND FEE CALCULATION $50.00 - Principal Structure $30.00 - Accessory Structure 1. Subtotal of above permit requested $ ao 2. State Surcharge $ .50 3. TOTAL PERMIT FEE (add lines 1-2 above) $ eo,so The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete,true and correct. APPLICANT'S SIGNATURE: ta N4Ek-Ns).j , ) Date: oi-1 to OWNER'S SIGNAATIJR. AIM=�s� .1" ' Date:,- APPROVED BY: �`' \� — Date: l 0-16 •0 2- U �4 O Principal Dwelling Demolition Permit iiF�" f�,;, ZONING DISCLOSURE & DECLARATION To the property owner: Demolition of the principal dwelling structure on.a property xray automatically terminate certain rights which may have accrued to the property by virtue ofthe continued existence of that building. . >Rebuilding on a substandard lot of record(i.e.a lot that does not meet the zoning district required lot area or width standards) will, with few exceptions, require variance approval by the City Council,and such approval is not automatic nor guaranteed but requires that a hardship be demonstrated. >Additionally,all current zoning standards will have to be met by the new principal dwelling including setbacks,lot coverage by structures,hardcover(impervious surface),height limits,etc. >Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage treatment system is mandatory. ) Unless specifically approved by the City,all accessory structures must be removed attire time ofprincipal dwelling demolition. The following information is presented for the purposes of advising the property owner of the implications of removal of the principal dwelling on the property: 1. Property Address 15 3 0 Ore L a-tr dFit alcL Plums# 07—117 Z3 2/3 0003 2. Zoning Districtl R-IB Required Lot Area 1 a c r e_ Required Lot Width IVO ' rlA¢e+S . Actual Lot Area 4./+ 3 acre, Actual Lar Width ti 2 0 g 70 Lot area variance is. no •uired_ Lot width variance ka60quired. 3. Required Setbacks: Front(Street) Z. ' Rear(Lake)7.5 emeAL S Side_ Side Street 3.5 ' Average Lakeshore Setba(tk: mast be m is not ap iesble. • 4. Lot Coverage by Structures limited to IS% of lotLkrea oes potannly not area>inertial 5. Hardcover limitatio : aj+e ap,lle*ble are not applicable. 0-75'zone= 0%allowed 75-250'zone=25%allowed 250-500'zone=30%allowed 500-1000'zone m 35%allowed 6. Municipal sewer is available. Municipal sewer is not available;on-site system testing and design must be provided confirming that two conforming drainfield sites are available. The unders u • property • " r •y acknowledges receipt of the above information. Staff Initials •• /se PA../ Property • 11 rgoa I = nate (Original: Street File; Copy:Property Owner) Z00/Z00f(?j .IDVILLKOD TV3I?LLDTI3 Shy 8999 r69 C9L Wel 9i':60 Itid ZOOZ/TT/OT Ci of Orono 2750 Kelley Parkway P.O. Box 66 Crystal Bay, MN 55323 (952) 249-4600 Fax: (952) 249-4616 FAX TRANSMISSION COVER SHEET Date: /6 — /1-- 0Z To: 6c, y Fax: ��v� —/ l0 cl'I " 8 g 8 g Re: D2wuo Pt.Y V', + Si cj44.zi o r2_ Sender: r-?6,_\A\ -' oeY' YOU SHOULD RECEIVE 2 PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL (952) 249-4600. 0.r MciS S t9h 4- Cx +10._ DI sCtoSc&+ 0-1,A ;:sy‘A/1 ‘.,k (kv\ Att. a 4 . o tA(Al s 7..c 2 - 2L1 / — 'Rol 6, 19 Ay S S ciek c 001 rvu_ °1- 7 5 Z! 2q q6 60 . j/t o `'0�o Principal Dwelling Demolition Permit 144'.. i.41).. ZONING DISCLOSURE & DECLARATION To the property owner: Demolition of the principal dwelling structure on a property may automatically terminate certain rights which may have accrued to the property by virtue of the continued existence of that building. >Rebuilding on a substandard lot of record(i.e.a lot that does not meet the zoning district required lot area or width standards) will, with few exceptions, require variance approval by the City Council, and such approval is not automatic nor guaranteed but requires that a hardship be demonstrated. >Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, lot coverage by structures, hardcover(impervious surface), height limits, etc. >Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage treatment system is mandatory. >Unless specifically approved by the City,all accessory structures must be removed at the time of principal dwelling demolition. The following information is presented for the purposes of advising the property owner of the implications of removal of the principal dwelling on the property: 1. Property Address /530 Or c L aV d 0.C,, P/& INS# 07-117-23 1/3 0 003 i 1 2. Zoning District L R-LB Required Lot Area / a C v e: Required Lot Width NO Actual Lot Area +AS acre. Actual Lot Width 't/2 0 ' g 0 6-7o Lot area variance is/'s no equired. Lot width variance is/ s not r quired. 3. Required Setbacks: Front(Street) .3S ' Rear(Lake) 7.S or AL S Side �0 Side Street 35 ' Average Lakeshore Setba‘must be me /is not applicable. 4. Lot Coverage by Structures. limited to 15% of lot area oes not apply(lot area>2 acres) 5. Hardcover limitatio : are applicable are not applicable. 0-75'zone= 0%allowed 75-250'zone=25% allowed 250-500'zone=30%allowed 500-1000'zone=35%allowed 6. X Municipal sewer is available. Municipal sewer is not available; on-site system testing and design must be provided confirming that two conforming drainfield sites are available. The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials PO Property Owner's Signature Date (Original: Street File; Copy: Property Owner) DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED 1le/P)- /D.1.7 .-- PERMIT NO. / 5-7Z 8 COMPLETED ADDRESS /5 3 C O re L, . /-�c.in PL OWNER CONTR. t/ 1p-?_L Ey"v.. TELEPHONE NO 051- --r)? - /h/44 0. DESCRIPTION/ lila) 1--ulzn. Uj 01 FOOTING 11 MEG NICAL RI 18 EXCAV/GRADING/FILLING c 02 FRAMING CHANICAL FINAL 19 LAKESHORENVETLANDS ti 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:. YES_NO 2cc COMMENT : 0//1 r�Cf)12 Aze.61 S 1-0 ,14JL1 9.07) _ 4. 7 i t t v /132-tcoi .71() cc Si Ki/"-i ba 5. P %�cc 0-ill ff-P— U0-u o a s i-f e. r) /Tht s ( / 4.1 cc cz ( cil El) aiOTC. SaLy Ole- W Z W CC d 2 WORK SATISFACTORY:PROCEED 0 PROJECT COMPLETE W 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Oj BEFORE COVERING PERMANENT 0 CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN 0 STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED 0 INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contra ite: (..6Inspector. White Copy/Inspector's Ie Canary CopylSite Notice