HomeMy WebLinkAbout1995-007073 - replacement system PERMIT
CITY OF ORONO
PERMIT TYPE:
2750 Kelley Parkway- P.O. Box 66
Permit Number WiiT
Crystal Bay, Minnesota 55323 00sys.f
Date Issued:
(612) 473-7357
SITE ADDRESS:
990 OLD LUNG LAKE Ru
LSk,)
P . I . N. : -11 -23-1A-0006
DESCRIPTION:
REPLnc:EMEN1 SYSTEM
Wat,Fer Ty..--,12 NEW SEPTIC SYSTE
waLE.r. 4,Drk RESIDENCT
CASH TL .00
RECEIPT-THANK YOU
#338340 C001 ROI T07:39
06/19/95
REMARKS: LIT Y OF CIRDNO
F INANCE ri;cIricE
131.7300000
f).1 LEN /00-00
FEE SUMMARY: 1222200000
01 CEN .50
$1 00
CONTRACTOR: - OWNER:
I V N S V I ..NC: S4734300 iD1.71Y-f
:36 6 0 t.4 10 1 c.,9 OLn IONS LAKE RD
A r-17.4OR;DNO MN E "2.:,E6
47.3-4.300
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS
SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF
ORONO ORDINANCES AND STATE OP MINNESOTA BUILDING CODE REQUIREMENTS.
APPLICANT PERMITEE SIGNATURE g ISSUED BY:SIGNATURE
1113
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION
Box 66 (2750 Kelley Parkway)
Crystal Bay, MN 55323
JOB SITE ADDRESS: ! 90 d 41.t:
Occupancy Type: Residential Commercial Other
Permit Type: New or Replacement System, $100.00
Repair Existing System, $ 50.00
(Tanks or Drainfield)
0.50 State surcharge added to above fees
*See fee schedule for non-residential permit fees
Owner's Name: da.cLe0 J r Phone Number:
Mailing Address: e -t. 'o � City:Q ,- Tp:
Contractor's Name: 1,P , J ��!' ,] PhoneNumber: ii/73—,/mac
Mailing Address: /6/ J/,L City:/j
ay
DO NOT MAII. PAYMENT WITH THIS APPLICATION
GENERAL INSTRUCTIONS
1. Applications for septic system permits may be mailed or submitted in person at the City
Offices; however, permits will not be mailed out. The permit must be picked up in
person at the City Offices and work must not begin unless the permit card is on the job
site.
2. Permits will be issued only to contractors holding a City of Orono Septic System
Installers License.
3. All work must be done in accordance with the approved septic system design. Design
reports are not considered approved unless accompanied by the "City of Orono Septic
System Approval" cover sheet signed by the City Inspector.
4. The following inspections will be required for all septic systems:
A. Pre-installation site inspection to include inspector, installer, and general contractor.
B. Tank installation prior to covering.
C. Drainfield trench installation prior to covering. For mounds, inspection is required
after rough-up but prior to sand placement (sand will be jar tested for silt content),
and again during pressure distribution piping installation in the rock bed.
D. Final inspection to verify proper final cover depths and to verify that all pump station
(where required) components are functional and comply with codes.
5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24-
hour notice is required for all inspections.
NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate
boxes.
/1. I have received a copy of the system design including the City of Orono
Septic System Approval Cover Sheet.
2. I will be installing the following:
A. Tanks: I/ Precast Concrete _ Arial.Other Manufacturer —
Tank Capacities: 1) to uo gal. 2) al. 3) ,,-_, :al .
/O e D
J
B. Pump Station (if required)
Pump make & model 4,-azt -- (attach pump curve &
literature); system design requires /( gpm at yr feet of head.
High water alarm make & model . Outside
electrical work to be completed by installer electrician )('
other . Inside electrical work must be completed by
electrician.
C. Treatment System:
'I�s: AAA_ s.f. Mound
Depth of rock below pipe " Rock bed dimensions 'x '
Drop Boxes Sand bed dimensions 'x '
Distribution Box Pressure Dist. Pipe Diam.
Maniford Pipe Diam. "
D. Final Cover/Topsoil to be: borrowed from site
(show location on site plan)
t/trucked in
The undersigned hereby applies to the City of Orono for issuance of a septic system installation
permit, agrees to do all work in strict accordance with the ordinances of the City and the
regulations of the State of Minnesota, and certifies that all statements made on this application
are complete, true and correct.
Signature ofApplicant z • Date: 4/jf/ 5
•
MPCA Certification No.:
Staff Review: Approv. Denial
Reviewer: %ice.% / /r / Date: ./9�
/
Reason for Denial:
I 0 L Oj i PARTS
V / 1_ AefieaItem
No. Part Description 7
/mil
1
/) 2 CasingImpeller
r°I,1.. 2 Casing
l 3 Mechanical Seal 5 G
4 Shaft
5 Motor / -- -- 4
6 Bearings, 8
Upper and Lower r . r1.,
7 Power Cable I . 4 1' Y
.a.m
F*), 8 0 Ring ` »""" ' `.,6-i—.e-A.,.,
0, O
/ ' ,
.....
4
PERFORMANCE RATINGS Eliot s per minute) MODELS
I _
tt
t wc0511H 1 WE0511HH Series HP Volts Phase Max.Amp. RPM Solids Wt.(lbs.)
Series WE0512H WE0712H WE1012HWE512H WE0512HH WE1512HH
1WE0311 L 115 9.4
N0, WEU3111 WE0311M WE0532H WE0732H WE1032H WE1532H WE0532HH WE1532HH WE0312L 230 4.7
WE03121 WE0312M WE0534H WE0734H WE1034H WE1534H WE0534HH WE1534HH 1750 56
H-------- n /z 3/4 1 1'/z /z 1'/z WE0311 M 1/2115 9.4
RPM 1750 1750 3500 3500 3500 3500 --3500 3500 WE0312M 230 1 4.7
100 70 80 90 106 — 60 — ^ WE0511 H 115 13.0
• 10 80 _ 65 76 87 102 112 56 84 WE0512H 230 6.5
l i 6(1 57 72 84 100 108 53 82 WE0532H 208/230 3.4
35 45 79 95 105 48 77 WE0534H 460 3 1.7 V.' __ _ 25 74 91 100 45 75 WE0511 HH /z 115 1 13.0 ✓ 60
Yil es5
0 67 85 96 40 72 WEO512HH 230 6.5 f
7., 40 61 79 92 35 70 WEo532HH 208/230 3.3
O tiJ_ __ _ __ _ 26 52 72 86 30 67 WE0534HH 460 3 1.65 „a,
=.:i 10 43 64 80 25 64 WE0712H 230 1 10.0
WE0732H 3/ 208/230 5.4
, i3O 30 54 73 18 60 WE0734H 460 3 2.7 3500
i 55 17 42 65 12 58 WE1012H 230 1 12.5 0
60 6 30 54 3 54
(.; 4 6., 16 40 51 WE1032H 1 208/230 7.0
t 70 5 26 47 WE1034H 460 3 3.5
14 43 WE1512H 230 1 15.0
811 4 40
WE1532H 208/230 9.2
9O_—_... 33 WE1534H 460 3 4.6
9
•
100 24 WE1512HH 1% 230 1 15.0 80
110 — 15 WE1532HH 208/230 9.2
_-_.___ -_____ _____ WE1534HH 460 3 4.6
120 5 -------- ..
DIMENSIONS
t.ItIL.I; ICT.,T (All dimensions are in inches.Do not use for construction purposes.)
iso : MODEL 3885 - U
SIZE 3/4"Solids T1,I 110 WF1SHH 12'h'-4 �.
lou
- --5W-
• 30 ROTATION
F ter:/:1134A. vo. 0*
--.10. 5 GPM
80 8 p
. Mirkuoy
, -� � 3
U . . — --
o KICKBACK ����� 1t
D*Y3,%,3/and 1HP=15" •
ev o r,1, except for model WE0712H and WE1012H=18';1'/:HP=18"
S 30
ao EFFLUENT EJECTOR SYSTEM
Effluent ejector system _ � Package Includes:
offers ease of ordering EPA " Submersible Effluent Pump
_,�
and installation.A single N WE0311L,12L or WE031 I1,
44) '1
ordering number specifies 12M.WLeve HH 12HH
Mercury Level Control w;.ten
10 a complete system designed A2-5(115 VI A2-6 f233 j
for most residential and
I Basin A7-1801S
u i commercial sump andBasin Cover A8-1822
0 10 z0 30 40 50 60 70 80 90 100 GPM effluent pump applications.
1-44; Check Valve A9-2P
--- - - -- , , Order No.:SWE0311L 5''.i'. 1..i..
1 10 20 m33-1 SWE0311M.SWE0312M
CAPACITY - SWE0511H8,SW 351 1,r1.
i
t
' IA
• ;_,
,,,,
" ® ` } a �
,
x ,� ` " ' fr
CITY OF ORONO
(Cr) .. C.- . ''" '" , , .,-,; %', , ., L....,..1'. -4
SEPTIC SYSTEM APPROVAL
1 .;1. tU CITY of OMONO
py).,,,. .-
,.2 ;} Municipal Offices
�� r *Ill Post office Box 66
c;1iij ���° Crystal Bay,Minnesota 55323-0066
lkEBK�f.O\�
990 Old Long Lake Rd.
LOCATION:
OWNER: Bruce Dayton
GENERAL CONTRACTOR: SEPTIC CONTRACTOR: Sullivans
SITE EVALUATOR: S—P Testing REPORT DATE: May 23, 1995
The City of Orono has Approved your on-site system design as of June 12, 1995
(approved-disapproved) (date)
The property line has been located and appears to
with the following comments:
be approximately 4 ' from the drainfield as designed by Steve Schirmers .
A Minimum 5 ' setback is required and will be altered as necessary during
construction. A 75 ' setback between the well and the septic tanks must
be met if it is feasible.
THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must
he issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is
enclosed.
NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the
Inspector (473-7357). Call for inspections 24 hours in advance.
ALL DRA1NFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain
in place until final site grading. Approval to pour footings will not be granted until the Inspections Department
has verified that primary and alternate sites are adequately protected.
NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20'
of tested drainfield sites either before or after system construction. Compaction of these areas could render them
unusable prohibiting the timely completion and or limiting the long term use of the property.
A site copy will be available at the City Offices for the septic contractor.
CITY OF O'O O 11-irj- "XL"---
Y .drdligrA. ' -
Stephen ' eckman, On-site Systems Manager
TELEPHONE-473-7357•FAX-473-0510
•
S-P TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627
951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566
May 23 , 1995
Bruce Dayton
990 Old Long Lake Rd.
Orono, Henn. Co. , MN
This On-Site Sewage Treatment System is Designed for a Type 1, three
bedroom home Designed in accordance with the Minnesota Pollution
Control Agency Chapter 7080 and local ordinances.
The soils on this site are a clay loam to sandy loam. A seasonally
high water table was located at 42" to 50" , (mottled soil) . The
bottom of the system must be located at least 3 ' above the seasonally
high water table. A Standard shallow seepage bed may be installed
pressurized typical of a mound system.
The soils at a depth of 12" to 18" have a percolation rate averaging
6.5 min/inch.
This site has an existing Non-conforming system, less than 3 ' from
the seasonally high water table. The existing tanks may be used
upon approval by the local Inspector. The tanks must be water tight.
The tanks will most likely need to be abandoned, pumped & filled
with soil .
A pumping chamber will need to be installed to lift the effluent
to the treatment area.
The power supply and switches must be located outside the manhole
and pumping chamber in a weather proof enclosure. A warning device
must be installed with a light and sound device, this is in case of
a pump failure.
All neighboring wells are located greater than 100 ' away from the
proposed treatment area.
Keep all heavy equipment off of the proposed treatment area before
and after construction. The treatment area should be marked off
before construction. This Design is not valid & the system will
need to be relocated if failure to protect the areas proposed
for On-Site Sewage Treatment occurs.
CONT'D
990 Old Long Lake Rd.
Orono
(2)
With proper installation and maintenance, this system should
have no problem in treating septic effluent effectively.
Nothing other than gray water (laundry, showers, etc. ) human waste
& toilet tissue should be disposed into the septic tanks. Garbage
disposals are not recommended. Excessive amounts of soaps, cleaning
agents & chlorine agents may kill the bacteria needed to treat
septic effluent. Additives are not recommended. Recommend to pump
& clean your tank through the manhole by a certified pumper every
year if you have 1 tank and every 2 years if you have two tanks .
S even B. Schirmers
SBS/ds
9-C SS. 'N -.,‘SIVot--I- — -I ''
`I,-10 SQ .. 'C- UJ 1 1�I I ‘...11..),: V-'f
1'10."v,�:'o1cT 1% W� `)15 �,A. ��� H_
•• ,,>N,., ., *wilAx..___i
PrF 4-i o.'-1 31." 14 f}g^'C i , ,
4.r. 4.6 •
n %'
Goof-de- o OOP- 4-014-
terr14N, 55 u.a.�{oS v.oAv.-4 6o,1r- ' Isiiiii '
M
H
t%tOw �11-vE r ,
•
SET- BACKS ,`-q i,,,,
- s o'-
HOUSE • System must be:
• Tank from property lines i 4' PSAK vi. ..A/
s\_\_... 'rnAS�*� r\-c" ..2from wells" ae1-c-wa,.-fob So .
>,ia-Av1-1-,1s wp . .D. from bldgs.
Treatment area = from lakes, streams •a � rot
ha!area ' from property lines
maw Uo1-Es�4 C.'I ')S.'from wells:. ,
. 1311e..KFr1._ .?__0_,'from bldgs.
r L'from trees ote:Power supply and switches must be in a weather SOIL BORING ELEVATIONS
1 1 I r► ` proof enclosure. outside•pumping chamber.
/d min. r ---______ __j1 _ _ ......... -" �«.�`, THaI EL.-9
rte" TH"2 EL.-9a.� . .
--�=pipe=" `� �y' i/a'e,n,- �`d .1
Tank Tank •-- 1'"° ' _ VO`''A __ __ ' �Grode -%sklpe TH 3EL:. 2
•
- _.
Drop to Tank - ri T H.4 EL-
�°-`-s°ti" F` 966'Z TH'5 EL.-
Mn.• I��to 81 Pumping ..• '1)4 Fww �,,.�� .oim.'k
Max.l"to41 ,cls-c1,11., •-fR•?.N1:' -
a�� r_-Fra.1 4+7� Chamber SEEPAGE BED ELEVATION at PROPOSED PUMPING
,� �� R1»1P Yrr.Ltr, 1.0) so1L•
CHAMBER- _' ' �an'i4 X 3.0
4 to 6 dia.pipe �r=-Vo ,
",-) -'oif x15-ci s.-c v.-- 914.0
SYSTEM DESIGN •
TYPE-2,3 BEDROOM - Percolation rate le..< min./inch (design/L.-74.n min./inch) (Lo A m so%L) .
Treatment area required w/j. of rock filter materialjj t% = wDsq.ft. of trench bottom
Number of tanks required. , 1st tank/oo a gal., 2nd tank/ocOgol. minimums
Clean rock Lig cu.yds. ( 3/4 to 2 1/2"dia.,includes 2"obove pipe) PROPERTY OF:'s >,r v N-c'ms-s
• Pumping chamber capacity= 25% of daily sewage flow of y_. gol.=1 I gal.+Reserve.Storage gal.* Pipe.bock drainage3 gal.= Gig Li gal.cop. "t90 0l- LO)-1>a \ _4 K- V-^z).
150R1�
_N_ -co_.? vuw� u VQ-—w+l r. 1.000-.Aa)e..4•*?. Oft 0 til).-k- 1��i4-11-1 . L1 d-
( Reserve storage = 75gal./ bedroom= i.L D:ya1. t pipe bock dranage_i,_ gal./I001in.ft._ . pipe- length of pipe needed app)a o ft. =3.3,.gal.)
-- • Pump size Imo._hp w/mercury float pump controls �S' -o -N 'N4' S) '91 4- 'or--t-'' - 3 S Sal/w,.n. S—pLL TEST/NG /N..„_.
Note: When constructing bed r- this area should be shaped Note: Distance from treatment ora to neighboring wells— Designed By1 �-- G. • 4
to divert run-offfrom entering treatment area. Ian -<foC- -C 0,f r Date•.�/QS/a,(, PH. 612-497-3566
. .
. . .
•
• ,
' .
1 ' ,
• 0.0 0 1.: rrL.oA.)Ls. 4..A l<afS0/4 0-it,,s-,1, I"- -
O6 0 f;,•1 0 r • .
Or 0 1
..1
rf'N
S 8
•
* .__.,„•-;:i'0.':/ ,-4-I-—-I' . o
2vs A- 1--.ei.‘._,. _.2-‘c.
„..1.1
—
:::-
rr•s ) I --$'÷i I CT,
5 1 /' 7 a' ' ,.;,-- x 1:26 './8•• I___.1& ,›
'a /--- 1 :TS, •
V /:
...- -../
, - Q
_ t 1
3 T...1,. 1$0 Pe
'....1 t 4
I(L9.
. .41
...., -.1)
_k
_
._-_-------
DR we;yvh ii, I .
,.,t,j , • 05
. -7
v •
v•
/ • ri
%)
45, • . - V-- -
. 0
u-
- 1
. o
. . \ "" - •
...... . 0,.. 6....4..... kw-
._?
-3-..
I i
- •--,1,47-7-----0
-.- ,' ' •-' ,
tt,
CITY, OF ORONO
. r110 *WILDING /1,-- ,.R''''IT P— RENTON . .
INSPECTOR . ,./...,/. .-/h
DATE • .111111f . . . PERMIT NO. ..........i.....
g APPROVLD AS SUFAIITTED
.
APPROVED WITH CORRE:CTIGNS AS NOTED , , CF----------- .
NOT APPRO\JED — CORRECT & RESUBMIT
!these comments are for your information. A!I work she!! i5e date
10 fall compliance with all appLu;ining & zoning oOete IS* *lc'
glikeinents InClucfmg Items not speclIcally noted in tits rer41111
KEEP THIS PLAN SET ..)N SUE AT ALL Tiro .
.. V
• • z f Tp,
C) 0 fti X 0
• i; s. I s .
• oi .-9 Ac 'o
til i -o
rn al g
I-. ci 1 -. 'a.
CI) 2) ..
5.
C
•=1 "13 •
:
0 .7. .
2 • 1;1
1 -n
d .. • co 33 _.
0
i
•
CD 0 = 0
C0- . ,...
(i) Pi °
1
f•5 ...**-.1 - 0 .
. li el 0 g o
5" • 71 IN 1
'V ,"•!.. ..,-- c
I1) 54 n {--. 7'1 '
. \(I),. .< r t3 ca, 1-, ar \I= c -I • •
D
o) t—c < p
g > c"
0 4) — Os, C .. i A q
l'.
0) rr -1 ' ° C--/ fll •
rN 0 r• 0.,,2 3 .
,- 1.--, I-.•
0 r__ 1••• = a 61
rt. Cu
• . I a) 0
U)
CD
INDIVIDUAL SEWAGE TREATMENT SYSTEM WORKSHEET
D-25
FLOW Estimated Sewage Flow in Gallons per Day(gpd)
t A. ' Estimated 9s0 gpd
measured - x 1.5= Nuof mber gpd Bedrooms
Typo I Type II Type III Type IV
SEPTIC TANK VOLUME
B. `a- 100 D gallons 3 45• 500 33oo i18 a`
4 600 375 256 „r
SOILS(Site evaluation data) 6 90000 5225 32 ,h
C. Depth to restricting layer= 3-t0" TD 4 f-a'feet .. s 1220000 675 4odor
08 `o,®
D. Maximum depth of system C-3 ft= ,S feet
E. Percolation rate_ (e• MPI
F. SSF /.(.) sq it/,_ �i Loll-»-- EO%L.. Num;, . , •
°f se'L: c.i11...'1, '1-:
Liquid Gatbaige
Capacity
TRENCH BOTTOM AREA Etedr°°it'S )• (ski
H. For trenches with 6 inches of rock below the pipe: 2 or less 750 1.125
A x F= x = sq ft of bottom area 3 or 4 1,000 1.500
I. For trenches with 12 inches of rock below the pipe: 5 or 6 1,500 2.250
A x F x 0.8= x x 0.8= sq ft of bottom area 7 or 8 2.000 3,000
J. For trenches with 18 inches of rock below the pipe: over 9 See fig.C-6 (x 1.5)
A x F x 0.66= x x 0.66= sq ft of bottom area ail arase:eo 4 Required Areas for Sewage Seamen*
K. For trenches with 24 inches of rock below the pipe: Percolation Rate acme I. Calm
AxFx0.6= x x0.6= sq ft of bottom area s soaTecture �al ha
BED BOTTOM AREA 'C 4.s y - Faster than 0.1• Coarse Sand -
L. For seepage beds with•6sor 12 inches of rock below the pipe;
Oa tos sand 0.67 0.60
Pag ea to s Fine Sand" 1.67 0.60
175-x A x F= x 1-)‹.0,_x l.t0') = r)51 sq ft of bottom area 16to15 Sand 0.79
USS /.aSx '�S1 X14 60,.-r-- ".: •
31to45 Silt Loam 2." 030
ROCK VOLUME IN CU FT46 to 60 Oay Loam220 0.45
Slower than 60"' 0 ay - (024)
M. Rock depth below distribution pipe plus 0.5 foot times bottom area:
•Soil too coarse for river treatment
M=Rock dept1).,+6 inches x Area(H,I,J,L,K) Use system for rapidly pemria5le mil.
'''Soil lawns 504 or more of fine or ver fine sand
( 1.0 + ft)x °V+-it =)a a z cu f t •.•Sod with too high a peea.ase d loiter
itwll.uon of an ingroutd etandand erten
ROCK VOLUME IN CU YDS
I N. Volume in cu ft divided by 27
M+27=cu yd s l dA?+27= 1-1,i cu yd s
ROCK WEIGHT .6 inches= 0% Reduction*
O. Cubic yards times 1.4=tons
N x 1.4=tons 4 ' x 1.4= G tons 12 inches=20%Reduction :'
.`18`iricles=34% Reduction
DISTRIBUTION 24 inches=40% Reduction
(Check one based on slope) *
Bed(less than 6%slope) sizing for gravelless trench
Trenches
Drop boxes(any slope)
Distribution box(level to slightly sloping)
TRENCH LENGTH C044i:rdi:f:r:r:rlf:f:?•
T
rti.tir1rV.11r111rtirtirtirti•rti
2 inch Cover
P. Select trench width= ft r?�ti•ti•�'ti•�•ti'ti':''''•''ti
r•r•r•r•r•r•r•r•r•r•r•r•
0.14•P•ti.ti.ti. .ti.�.ti.ti.ti.ti
r•r•r•r•r r•r•r•r• t�
Q. Divide bottom area by trench width: (H,I,J,or K)+P= ;,•ti•ti•+• ti•ti•.o.,- 1
r•r.r•r r•r•r•r•
lineal feet ~r1r1rti• r~r~rtir..
rtif�f�f�f rti.ti.ti.ti *inch pipe
_=_lineal feet r•r•r•
.}•ti•ti•ti• ti•+•+•+
'r r.r•r•r• f•r•r•r•
LAWN AREA :'•�•~.`"~" �"'"�•~"~
r•r•r•r•r• t•!•r•r•rN•
R. Select trench spacing,center to center= feet 1�
P g� ;�rtirtirtirtirtirtirtir•r•r•r•r•r•
r•17-11:r•r•f•rtirtir:}:f1•}~
S. Multiply trench spacing by lineal feet R x Q=sq ft of lawn area ::1.• ;:ftif1f1}+}}fti;1}tiPg. 6-24 inch
x = sq ft .......1.0::::::::P...%.%.00rti.tirtirtirtirti.ti Rock Below the Pipe
r••r•r•r•r•r."...r•r•r•r•r.r•
r•r•r•r•r•r•r•r•r•r•r•r•r•
•
LAYOUT(Use other side) .ti.ti•ti•ti.ti.ti•ti.ti.ti.ti•ti•'.ti•ti
••r•r.r•r•r•r•r•r•r•r•r.r•r•
ati.,•ti•ti•+•%,+e.•+•ti•ti•ti••••+
1.Select an appropriate scale;one square= feet.
2.Show pertinent property boundaries,right-of-way,easements.
3.Show location of house,garage,driveway,and all other
improvements, existing or proposed
4.Show location and layout of sewage treatment system.
5.Show location of water supply well.
6.Dimension all set backs and separation distances. Figure D-26
F-17
PUMP SELECTION PROCEDURE
EMO PERFORATION OF A PERFORATED LATERAL
A. Determine pump capacity: /r..o.°,
Gravity Distribution ' t TyyooYl 1
1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of -
Water use rate. •
.Loenr
S. tar« ' .--.�'°°1 pm i, !a.
.yl'
• wilt.n0 rosinrosinO.paper))
2. Maximum suggested for delivery to a drop box of a home system is 2,700 ,: 00 wrar"7r � � i
.■ - � :Vii-1,y----4
To
gallons per hour(45 gpm)to prevent build-up of pressure in drop box. P„„ ,_u Loy 12'to Edge
' - • TO FYk of a«.LONE
;... . •
Pressure Distibution S3- 2- Sl:3=11 c1°e1 sa.e u,, g.'09Tof Lyoy`yi"
3.a. Select number of perforated laterals 3 (.11-P. --t. - T X' n
b. Select perforation spacing= 3 feet. 1i -1... ` a'•3: .9 `on,..1 S°° •.o;^•Seeroliod
Pismo S0.9 Lop.
c. Subtract 2 ft.from the rock layer length. (oa 4s
-2 ft.= feet.
d. Det rrmine the number of spaces between perforations.
Length pert.spacing= -ft.+ ft.= --spaces Required Perforation Discharge
e. -spaces+1= perforations/lateral I I in gallons per minute(gpm)
f. Multiply perforations per lateral by number of laterals to 7f ZA "D)A Discharge ��ma
get total number of perforations. ,.°„I A 7 m,=L, ee
„perforations. Hd 4 6+6 r"`
g. sxs. �gpm.
�`- 1.0a 64-.56 , 0.74
0.74
SELECTED PUMP CAPACITY Is( gpm 2.Ob 0.80 1.04
B.Determine head requirements: a. Use for single family homes
1. Elevation difference between pump and point of discharge. b. Use for all other applications
f)o feet
2. If pumping to a pressure distribution system,five feet for pressure
required at manifold if gravity system,zero.
S feet
3. Friction loss
a. Enter friction loss table with gpm and pipe diameter. Pipe Length
Read friction loss in feet per 100 feet from table.
e
F.L.= a.t2 t, ft./100 ft of pipe Point of D""argc
b. Determine total pipe length from pump to discharge Elevation Difference'
point. Add 25 percent to pipe length for fitting Pump ers3
loss,or use a fitting loss chart. Equivalent pipe
length-1.25 times pipe length= F-18b
1 x 1.25= ) C ) feet
c. Calculate total friction loss b lti 1 n 1.5 inch 2.0 inch 3.0 inch
Y muP Yl g gpm Friction loss a,100 s of Pia
friction loss in ft/100 ft by equivalent pipe length.
Total friction loss= a.0 10 x i SD +100= 3 feet 10 0.69 0.20
12 0.96 0.28
4. Total head required is the sum of elevation difference, 14 1.28 0.38
special head requirements,and total friction loss. 16 1.63 0.48
18 2.03 0.60
20 2.47 0.73 0.11
(o + .Si + 3 25 3.73 1.11 0.16
(1) (2) (3c) 30 5.23 1.55 0.23
- _ --7.90___ 2.057 030
40 11.07 2.64 0.39
TOTAL HEAD 'D-9 feet 45 14.73 3.28 0.48
50 3.99 0.58
55 4.76 0.70
C. Pump selection 60 5.60 0.82
1. A pump must be selected to deliver at least
3.. gpm (Step A)with at least a9 feet of total head (Step B).
L-1.7
CERTIFICATION 4 00627 Logs of Soil Borings
Location or Project Bruce Dayton, 990 01d Lang Lake Rd. . Orono
Borings made by S-P Testing, Inc. Steve Schirmers _ Date 5-17-95
Classifiction System: AASHO ; USDA-SCS X ; Unified ; Other
Auger used (check two) : Hand X , or Power , Flight , or Bucket X
Depth, Boring number 1 Depth, Boring number 2
in in
feet Surface elevation 98 . 7 feet Surface elevation 99 . 2
0 - 0 - Topsoil dark brown loam
Topsoil dark brown loam 0 - 6"
0 - 10" Brown sandy loam
1 - 1 -
Brown ,clay loam 6"- 1-1/2'
2 - 2 -
Brown clay loam
10" - 2 ' 10"
3 - Brown sandy loam 3 -
• 2' 10" - 3-1/2 ' -MOTTLED 1-1/2' - 3-1/2 '
3-1/2 ' Rusty olive brown clay
Rusty brown sandyloam
4 - loam 4 - 4 '-MOTTLED
3-1/2 ' - 4 ' 4"
3-1/2 ' - 4-1/2 '
5 _ Rusty gray brown 5 _ Rusty olive brown
loam loam strong
4-1/2 ' - 5 ' 8"
4 ' 4" - 6 '
6 - 6 -
7 - 7 -
8 - 8 -
End of boring at 6 ' feet. End of boring at 6 ' feet.
Standing water table: Standing water table:
present at feet of depth, present at feet of depth,
hours after boring. hours after boring.
Not present in hole x Not present in hole
Mottled soil : Mottled soil :
Observed at3-1/2 ' feet of depth. Observed at 4 ' feet of depth.
Not present in hole Not present in hole
Comments: Comments:
LAJA Y- me-1-C\ ''cr> y
- 4,4 —'Kuer
CERTIFICATION # 00627 Logs of Soil Borings
Location or Project _ - ._ . . • • • • . . . . - . - ;. • . • •
Borings made by S-P Testing, Inc . Steve Schirmers - Date 5-17-95
Classifiction System: AASHO ; USDA-SCS X ; Unified ; Other
Auger used (check two) : Hand X , or Power , Flight , or Bucket X
Depth, Boring number 3 Depth, Boring number
in in
feet Surface elevation 98 .7 feet Surface elevation
0 - 0 -
Topsoil dark brown loam
0 - R."
1 - 1 -
Brown sandy loam
2 - 2 -
8" - 2 ' 4"
Brown clay loam
3 - 2' 4" - 3 ' 2" 3 -
Brown sandy clay loam
3 ' 2" - 3 ' 8"
4 - sane°Yoam 3 ' 8" - 4' 2"-MOTTLED 4 ' 2" 4 -
Rusty 4 ' 2" - 4-1/2 'brIoamsandy
Rusty olive gray
5 - loam 5 -
6 - 4-1/2' - 6 ' 6 -
7 - 7 -
8 - 8 -
End of boring at 6 ' feet. End of boring at feet.
Standing water table: Standing water table:
present at feet of depth, present at feet of depth,
hours after boring. hours after boring.
Not present in hole X Not present in hole
Mottled soil : Mottled soil :
Observed at 4' 2" •feet of depth. Observed at feet of depth.
Not present in hole Not present in hole
Comments: Comments :
• CERT. #00627
PERCOLATION TEST DATA SHEET
Percolation test readings made by S—P Testing, Inc. on 5-18-95 starting at 10: 53 CO
P• •
, ,,.,
a
990 Old Long Lake Rd. 1 5-17-95
Test hole location , Hole number ,Date hole was prepared
Depth of hole bottom 18 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth,inches Soil texture
0 — 10" Topsoil dark brown loam
10" — 18" Brown clay loam
Method of scratching sidewall xn i f P
Depth of gravel in bottom of hole 2 inches
5-17-95 12:00pm 12
Date and hour of initial water filling ,Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hour Automat i e siphon
,Maximum water depth above hole bottom during test 6 inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
10: 43 prefill 6
10 :53 11:23 3-1/4 9. 2 30 min
11: 24 11: 54 " " " " "
11: 55 12 : 25 "
Percolation rate = 9. 2 minutes per inch.
' CER'. #00627
_ PERCOLATION TEST DATA SHEET
S—P Testing, Inc. 5-18-95 10 : 54
Percolation test readings made by on starting atm,
tJafel
Test hole location 990 O l d Long Lake Rd. _, Hole number 2 , Date hole was prepared 5-17-95
Depth of hole bottom 12 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 6" Topsoil dark brown loam
6" — 12" Brown sandy loam
Method of scratching sidewall Knife
•
Depth of gravel in bottom of hole 2 inches
5-17-95 12: 00pm 12
Date and hour of initial water filling ,Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom.during test inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes • inches level,inches minutes per
inch
10:43 prefill 6 ,
10:54 . 11: 09 il 4-1/8 3.6 15 min
11:15 11: 30 " 4-1/16 3 .7 " "
11:31 11: 46 " 4 3 . 8 " "
11: 50 12 : 05 It 4 3.8 "
3
Percolation rate = ' 8
minutes per inch.
PERFORATED LAYER OF GEOTEXTILE LOAMY SAND CAP
+,f: �1 - LATERALS FABRIC PERFORATED LATERAL
�
SANDY LOAM '~ GRASS COVER 6 INCHES
SOIL i • _•• :._.. TOPSOIL
//- V `:'•^•�! CLEAN SAND FILL
f y+ MAXIMUM SLOPE
LAYER OF GEOTEXTILE J� =z. ,' :r{` .--••;04
r{` 3 TO I
FABRIC OR grtMEHES-OF .y / g'..
TOPSOIL �4 CLEAN ROCK 4'
'•�' .• PLOWED OR TO 21/2 INCHES i,SLOPi
Y ' /,' ,1.%/"// , UBSOIL DISKED SURFACE
11/2. OR 2" .,�,;� " j • ;• r . CROSS SECTION A-A
PIPE FROM PUMP:`;••:.1: ' i��/,',/�/• �,� •
3/ 21 '• _/-. /: •
.f , /i' •/i PIPE FROM
CLEAN F'OCK ' / /.• PUMPING CHAMBER
i ?At'," r' ^// DIVERSION FOR v .
•', i•" J• SURFACE WATER — W I r
6" TOPSOIL • i . • �' _ a r , i/r
+ / . o
.. . j' /f j,.' _
•?-�' 0. "Pr 3 +1.' — PERFORATED
:+�• ';`: �^‘tit _,, /r9'./•
y, MAk ( et
LATERALS I
.:Cl 0
a SIOPE-.i .: ,..J,� ��:.•'.'. ,t,:r. • —
l`s-------- !! ._
IllAN •
`SOD I• 3 a\s2':i"�".!'i BED AREA .y
1... .
BRok,LAYE •
R ,•:1 ....1:••••'.:1!,::.t;,...,.; _ I _ W
Up .. .•'�,.. `�-.`. —
BARn�ATURA1 I W .
ER LAYER — — - I Y _ _ 1
_ I =_
� — INCHES I V'~� _INCHES
LAYOUT OF 'PERFORATED PIPE LATERALS Fon •-
PRESSURE DISTRIBUTION IN MOUND •
ci. DIKE --_ JO FEET ._DIKE
PERFORATED PLASTIC PIPE _ MAX.
TOTAL WIDTH
��NG \
PERFORATIONS SPACED 36' RAfIpN SPa r 1
END ON CENTER. PERFORATION Fp I i •
SIZE MAY BE y46' ?,. ,..- j6.. A PER '� PLAN VIEW
VIEW OR �/.
'may 2"MANIFOLD ENO PERFORATION OF A PERFORATED LATERAL
PIPE
PERFORATIONS ON BOTTOM OF ,v'%!w'
-Grou Coves
PLASTIC PIPE
10..
%`vim Vie: r TN.
/ -- r a•=.o- Lo a of Goon„Ille r4 1=1""
• r =z•(ALTERNATE LOCATION Loamy Sona Wyer• 4
OF PIPE IRON PulnPl
•
lrirrrrr•■ mm...---Polon Roo Dulls.' fiorlionlmry
�/ �NIe C•p Wes Top
END CAP 40, �/ L • ,�o,PlFleld Rock o ERock Leifer
Eapo
LA�ERp , 1
-- 1EQ -Borlormlum Lauded el
FOR 2 PIPE FROM Clean Sana Loser Bosom of Lab.ol
....„,...r....--r.-..-----
PER F PUMPING CHAMBER
fa
r ENG alolol sou ProMrly Srnrlr.nA
F-8
1 1
REDWOOD, CEDAROR
WATER TIGHT a LOCKABLE ELECTRIC BOX—' J TREATED POST (4 x 4 min) '
PLUGS OR ELECTRIC CONNECTIONS—-- -ALL ELECTRIC CONNECTIONS MADE
2" PVC CONDUIT SCHEDULE 80 _ INSIDE BOX
MANHOLE COVER CHAINED a LOCKED 6"SPACE LOOP OF POWER CORD FOR
SEALED MANHOLE RINGS--Ni, FINA GRADE
�� ENT
AT LEAST 12"
UNION BELOW GRADE
_._. -�a_ WIRE FROM POWER SUPPLY
— _ '' PIPE IS LAID ON A UNIFORM SLOPE FROM
,}• P STATION UP TO SOIL TREATMENT AREA
�� / . p FOR PROPER DRAINBACK
SEALED TANK COVER LIF PIPE AT TANK MUST BE LOWER THAN
UNION. TO GET ELEVATION FOR DRAINBACK,
PLASTIC ROPE OR CHAIN , A I/4 INCH WEEP HOLE MUST BE USED
WITH ANCHOR
ALARM FLOAT ON SEPARATE ! — WEEP HOLE
ELECTRICAL CIRCUIT— y1
NOTES: ELECTRICAL WIRE FROM POWER SUPPLY
._START LE_VEL-S__ L_ • 11 MUST NOT RUN OVER ANY TANKS BUT
r -1 ''—' MUST BE LAID BESIDE OTl1ER TANKS
3""� J �� ;I AND MUST BE PLACED IN CONDUIT
ALONG POST
SHUT_OLFJ,EEILQ-_ — _ _Z
ELECTRICAL CORDS FROM PUMP AND
FLOATS MUST BE RUN THROUGH
' CONDUIT. WIRES CANNOT HAVE GROUND
PUMP CONTROL FLOAT- CONTACT.
000
Figure F-8
METAL .404014111 -
COVER
I •r::. t: .r
i •
>" i, • t!
i �Y., v 1
CONCRETE - 1
MANHOLE "+� -
RING 6
METHODS OF SECURING MANHOLE COVER TO PREVENT
UNAUTHORIZED ENTRY
Figurc C-14
I
♦ " ,
I • 1
4. • 1
VERTICAL SIDEWALL SEPTIC TANK
"..---•FINISHED GRADE
irk.„5,
LEAST ) 6"TO 12" SOIL AT LEAST
I" I4" DIA. I COVER 4" DIA.----
MIN [-AT LEAST I"r t ` 1 ' l AT LEAST 1"
Fr.• L 1- i I
-J 1 I A DIMENSIONS FOR_TIO
ANKS WITH VERTICAL_SES A
�"- WIDTHW 24' MINIMUM _- —�4
LENGTH L. 2 TO 3 TIMES THE _WIDTH .
B DIAMETER 60" MINIMUM _
___1... DEPTH, D 30" MINIMUM; 79_MAXIMUM C
AT LEAST A , 0.2 • •.
3 B 6"_MINIMUM. 0.2 0 MAXIMUM _. 6"
C 04 0 —
•- - • -AT LEAST 4 FEET- - `--
NOIF S:
NI. SN1NIY 1 EES Al It ASI t l.4CIICS IN DNAY IFn 4 AWN KO CUVEIIS SI 6111.1.ow.LOCAIED w1111114 12 NChES.
2 llltnr s11N I OE 0110 on PAD If UNI 1OLCS.20•IFASI r 11E MVMKXE 151VII11114 SIK tNO*SOF 111(SLMVACE
DU.rt1SON NE)Lt1CAIF IT Will1114 E I LE I OT All 1 A1* 111E00VE11 MSI OE SEOUE 010 MEVCNI ACCCSA.
WAILS. I ;1rAM1WUISIANCE OfT EN FWD'INLET N'S NiU
3. AN AMANIIKJ►1 I'S'F Of Al LEAS'4Nu1CS name:IE En NENEST N 11 ON CAME EENF N'IESS11uF.ANUAN II S
CMI AYVM TOLE SI w.I Rt LOCA1 ED(NEP nom It E M ET On NO MONS 11 NN If ITCHES.
NEOU1LLILICVIfzcTHE CUP E1110+COFIII:01l1'ECION i ron11D1+z(NIN.CYl/1M►CN_TAMS 0IL45UI.K)NAIS0.150
torts show.OC lI'5N4'AS Inc(-cN1t n tow n<111E AND dA.Ns1CW C IS O 3%11. A
ONILEOISNINCS atSA/MINty ICES A 11WU)N51•IC110P4
PetIAIFT PF LOCAtlu1!IWtrN Tiff f11EI A141(t1t1 FT
AN ars.
0
I PENCIL
•
MARKSnvecalis-S;;127...A....
.Ri1• 1
I «tr:
T 1111
MANE
r' ` ,
ill .
INLET h
I= ,1 A ,, .' ry., OUTLET
• :. =•;OUTLET LEVEL ji': • j i `,i Y
-1. _-. •—�l sr-•—._•'.L r, ', : .
._ SCUM CLEAR SPACE'--:A=1.: , , y CLEAN OUT TANK WHEN: •
- •— — -- - "—�� _=•� 7 X IS 3'OR LESS OR
1'• _ -- - - _ %i B "B"IS 12"OR LESS
- -- -- ---.. - -
•1. .•.•,•''' . S
S . :4 BLACK BLACK COLOR
IP !' •:. " • SLUDGE • i DISTINGUISHES SLUDGE
t�y'4:.•'�t7.:,: , • •, • • .....• ,' LAYF FROM LIQUID
.... -414,V:
V
11,
MEASURE SCUM AND SLUDGE ACCUMULATIONS
IN THE SEPTIC TANK
DATE TIME
CITY OF ORONO CALLED IN ►c
INSPECTION NOTICE 173 SCHEDULED 4l7-.` —=
PERMIT NO. COMPLETEDJ /�G 1
ADDRESS ?O 47.- gJe.
OWNER ()dial
_, / e t
TELEPHONE NO. RC .k--
D
ESCRIPTION -
IQ 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORENVETLANDS
H 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 S A ' -•OK-UP 06 PROGRESS
Z 07 DEMO-SITE 2 - - MAIN . 21 COMPLAINT
v 07 DEMO-FINAL PTIC INSTA . 22 FOLLOW-UP
ct
IQ 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
--i
10 PLUMB! = ,-,N, / �' 36 FOUNDATION/REMOVAL
Z OWNERIC• TRACTO•TO MEE�'YOU: '4 S_7N r
y COMMENTS: — �? fereeS.
cc
- Sir 1fJ
cc
cc
4.
W
cc
cxW
z
W
cc
Vt1.1
ORK SATISFACTORY:PROCEED III PROJECT COMPLETE
ORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
0 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
0 STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
D INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnerlContractor e:
'' fes'
Inspector. ��i.G1�i
White Copyllnspector's File Canary Copy/Site Notice
DATE TIME
do
CITY OF ORONO CALLED IN .;�' • __�
INSPECTION NOTICE /70 3 SCHEDULED :�r� A
ADPEDRESS
NSO. d alto LEr`
ADDRESS
OWNER CONTR. Cd/l1
TELEPHONE NO.
DESCRIPTION i
uj 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
U.
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
is 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
Lia 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING F, , 36 FOUNDATION/REMOVAL
Z OWNER/C040OR TQ M,EOU:_YES NO
y COMMENTS: �/w"''life it r/�i&((//#0?9?)
ecLu --- .-IN Al)p9)*0
C
."
0
>.
CC
0
4--i,i, -/-- --r /Y -
r-i- ei
W
cc cpvoilicl
W
z
W
cc
j
'WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W
cC 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY
W
0 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN
INSPECTOR WILL RETURN
0 STOP ORDER POSTED.CALL INSPECTOR 0 CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspecti n 24 hours in advance.473-7357
Contractor
Inspector:
�
Inspector.
White Copy/Inspector's File Canary Copy/Site Notice
V
DATE TIME
CITY OF ORONO CALLED IN 6,..-INSPECTION NONCE SCHEDULED •• .., ?`700
PERMIT NO. / COMPLETED `
ADDRESS 990 0' 2n IL mit igtil• --OWNE
R ONTR.TELEPHONE NO.
DESCRIPTION
W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
cz W 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
• 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
1 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
LLJ 09 PLUMBING RI35 HARD COVER REMOVAL
Z 441046
-..1
10 PLUMBING F /r 36 FOUNDATION/REMOVAL
Q OWNER/CO •RTOM.YOU:_YES N
o COMMENTS: J/�1��
LU
cc
0
j ( v,'{� (i._
ti? th' i r/k-vjer--1
cc
O —
W — tt3- Ø -')
cc
Q
W
Z
W
cc
CZ/
W El ORK SATISFACTORY:PROCEED PROJECT COMPLETE
W
CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN
INSPECTOR WILL RETURN
1-1 CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contractor . ,.;- -. ,
Inspector. ,y ,. , !V/I
White Copyllnspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE,)di 3 SCHEDULED — ?- ��s0
PERMIT NO. I COMPLET
ADDRESS PiR:2 OI
OWNER CONTR. 4911)1.4),---•N
TELEPHONE NO.
DESCRIPTION
IQ 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
• 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
• 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
✓ 07 DEMO-FINAL 15 SEPTI kSTALL. 22 FOLLOW-UP
Lia 09 PLUMBING RI 23 '+ __ 35 HARD COVER REMOVAL
✓ 10 PLUMBB 36 FOUNDATIOWREMOVAL
OWNER/C TRACT TO MEET YOU: YES •N
COMMENTS: A/".1" ;/ rl CC
cc
O
O -..__..
cc
0
W
CC
Q
W
W
• ❑WORK SATISFACTORY:PROCEED
/ROJECT COMPLETE
W
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
• ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
0 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. El PHOTO TAKEN
INSPECTOR WILL RETURN
111STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contractor on-it
Inspector. /P
White Copy/Inspector's File Canary Copy/Site Notice