Loading...
HomeMy WebLinkAbout1999-012079 - mechanical PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway - P.O. Box 66 ME:Cf.-ANTI:AL Crystal Bay, Minnesota 55323 Permit Number: 01'7'079 (612) 249-4600 Date Issued: 11./0219':=.3 SITE ADDRESS: 450 OLD LO4G LAKE Rc, `tiNB . P . I . N . : DESCRIPTION: " - 1 HFATING SYSTEMS mAi:..t ENNOX REMARKS: FEE SUMMARY: VALUATION si , 949 Base Fee $35 . 00 11AIL-IN FEE Surcharge $ 2:47 Tote Subtotal CONTRACTOR: - Applicant. - OWNER: T ER INC 34789S58 RARE', iii F-; LON6 LAKK. Ku 11FDINA F,S340 ORONO MN €7,1 478-96SE: THE UNDERSIGNE _ HERtBy REQ' t)FsTS PERMI•':7;SICIN TO MAKE TifIr 'REAL' IMPLRUVElliENT -,: D L spFCIFIED AND AGI-EEb T,u 1)r €1LL WORK. IN ,STICT COMPL A '‘E WITH ALrry6E- ORONO ORDINANCES AND miNNEBOTA BUILDING CODE ,RE9UIRqlgNT-,., _J - APPLICANT/PERMITEE SIGNATURE ISSUED BY SIGNATURE 3DN\ 114 CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 GENERAL INFORMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within 2 working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required. 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. Please check one: New Addition Repair Replace L-- Residential Commercial JOB S1'1'E: 'C% 6W (0*-Cr (elk `2c) Zip: Owner's Name: r e Wi KP.' Telephone Number: Mailing Address: �( 6 4(,d (o? (arm t2 c City: Zip: >3- ( Contractor's Name: t- 7Z uC Telephone Number: zi%-'?575- Mailing Address: ,)20 162‘.)c-72 7> • City: tt (eL- Zip: 5)-5(1(-0 SYSTEM DESCRIPTION HEATING SYSTEMS Quantity: Make: (-Cvn(1dK Model: & 3q-l2�' Fuel: Flue Size: Input BTUs: (ZSaix+ Output BTUs: (C( Co CFM: /foo COOLING SYSTEMS Quantity: Make: Model: Tons: H. Power s WOOD BURNING EQUIPMENT Wood stove with flue Wood combination or add-on Factory fireplace with flue Factory Fireplace (s) Freestanding Masonry Wood Stove (s) Franklin, other Brand Name Model No. Mfgr's Min., Clearances, side , rear , min. flue dia. VENTILATION No. Kitchen Exhaust ducted recirculating cfm No. Bath Exhaust (must be ducted outside) cfm No. Other Fans: Locations cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) Installation Removal Fuel oil: gallons underground inside outside LP Gas: gallons Other Gas opening PERMIT FEE CALCULATION 1. 1.25% of Contract Price* or Minimum Fee ($35.00) a� /?q ' x .0125 $ J (contract price) 2. State Surcharge. ** Add the State Building Code Division Surcharge to each permit. x .0005 $ s q? or $.50, whichever is greater (contract price) 3. Postage and Handling (Only mail-in applications) $ 1.50 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ •7•�7 * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50 - whichever is greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and cert. = that . 1 statements made •n this application are complete, true and correct. � � L�ji , rl Applicant's Signature: `- 1 `i /`� Date: Approved By: igz / Date: (4101/-/- V/ t ///V/ . BARB WIKEN HVAC LOAD ANALYSIS for Barb Wiken 490 Old Long Lake Rd. Wayzata, MN. • " • " " " • RESIDENTIAL HVAC LOADS Prepared By: Doug Bjork Ditter Inc.,Cooling and Heating 820 Tower Drive Medina,MN.55340 (612)478-9558 10-27-99 'RHVAC-Residential&Light Commercial HVAC Loads Program Elite Software Development,Inc. Older,Inc. Barb Wiken Hamel,MN 55340-9691 10-27-99 Page 2 Project Summary Project: Barb Wiken Company: Ditter Inc., Cooling and Heating Client: Barb Wiken Representative: Doug Bjork Address: 490 Old Long Lake Rd. Address: 820 Tower Drive City: Wayzata, MN. City: Medina, MN. 55340 Phone: 476-0326 Phone: (612)478-9558 Fax: Fax: (612)478-9524 Design Data Project Name: Barb Wiken Reference City: Minneapolis, Minnesota Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 Feet Elevation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Outdoor Outdoor Indoor Indoor Grains • Dry Bulb Wet Bulb Rel.Hum. Dry Bulb Difference Winter: -20 N/A N/A 72 N/A Summer: 95 75 50% 75 36 Check Figures Total Building Supply CFM: 1216 CFM per square foot: 0.285 Square feet of room area: 4,261 Square feet per ton: 1,011.5 Building Loads Total heating required with outside air: 90,515 Btuh 90.515 MBH Total sensible gain: 37,913 Btuh 91 % Total latent gain: 3,673 Btuh 9 % Total cooling required with outside air: 41,586 Btuh 3.466 Tons(based on sensible+ latent) 4.213 Tons(based on 75%sensible capacity) Notes Calculations are based on 7th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. Wednesday,October 27,1999